Current location - Recipe Complete Network - Catering training - What information is needed for the drainage license
What information is needed for the drainage license
A. What information is required for a drainage license

1, in line with the conditions of the urban public **** drainage facilities connection, connection facilities through acceptance.

2, the sewage discharged to the urban public **** drainage facilities in line with national and local discharge standards.

Required materials

1, drainage permit application form.

2, the relevant information on the acceptance of the connection facilities.

3, the applicant's identity, proof.

4, authorization letter.

5, the special test wells, sewage outfall position _ and caliber of the drawings and instructions.

6, the construction of sewage treatment facilities in accordance with the relevant information.

7, water quality test reports.

8, testing system.

9, the original drainage permit. Permit and administrative decision.

10, proof of water consumption.

11, treadmill table.

12, the legal person certification.

Office. Processing time limit description Legal period: 20 working days Commitment period: 15 working days

Second, the drainage registration and drainage permit certificate for drainage households include

Engaged in manufacturing, construction, electricity and gas production, schools, hospitals, hotels, baths, car wash, catering, entertainment operations, residential services and other services and other activities discharging sewage into the urban drainage network and its ancillary facilities of the units and individual operators.

Three, for the drainage registration and drainage permit certificate required to provide materials

1, drainage permit application form.

2, drainage network plan drawings.

3, corporate business license (organization code certificate) copy.

4, with metrological certification qualification of the drainage water quality inspection report issued by the drainage testing organization.

The above is a compilation of "for the drainage permit what information is needed" of the relevant content, from the above content we can know in law, how to meet the provisions of the various technical conditions under the rational design of urban drainage systems, is an important issue in planning and design, so China has introduced the management of urban drainage license Measures aimed at solving the occurrence of such problems.