How to decorate the clubhouse?
Renovation process of clubhouse 1. Design concept: Theory is the basis of practice. The conception and communication at the beginning of the design determines the general direction of hotel decoration in the future, and can also save a lot of unnecessary troubles. The main contents of the decoration design concept of the clubhouse include (1) confirming and understanding the customer's needs, and filing them into documents, and reaching an understanding with the customer through repeated communication. (2) Make a preliminary task plan, time and funds, etc. (3) Design scheme and preliminary sketch.
Renovation process of clubhouse II. Preliminary scheme: after listening to the opinions from all sides, combined with the designer's experience and customer's needs, the preliminary scheme of design can be worked out. Then it is necessary to modify the design scheme of the clubhouse decoration that has been decided, and carry out in-depth optimization design according to the corresponding national norms and technical requirements. The plane layout should be carefully scrutinized, and the relevant personnel of the club must carefully examine whether the relationship between each part and the whole can achieve the expected effect. Determine the detailed design of the scheme, such as the connection between different materials, edge closing, plate and frame size, etc. , not considered in depth in the scheme stage, and fill in the relevant plans and elevations not shown in the scheme stage. Coordinate the relationship between design scheme and structure, related equipment types, etc.
Club decoration process 3. Determination of renderings: Generally speaking, the performance of clubhouse decoration design is to convey the final result of decoration design or the information of conception process through certain methods, and form a carrier of performance interface. Design information can be presented through this carrier, so that the thinking content can be understood and read by others. The main contents include drawing hand-drawn drawings, computer renderings and detailed construction drawings, including fixed plan, plan, elevation and node proofing drawings; Its main manifestations are color processing, space modeling, lighting, materials, decoration and plants. At this stage, the designer is required to show the scheme completely in the form of effect diagram on the basis of the scheme diagram, express the design idea orally and in writing, and tell the customer the decoration design effect in order to gain recognition and recognition.
Club decoration process 4. Construction supervision: construction is the last practical link of design, which should not be underestimated. In this process, the designer of clubhouse decoration needs to go to the site regularly, communicate with the construction team, supervise whether the construction conforms to the design, and solve the problems in time when found.
Renovation process of clubhouse. Some work after the completion of the project: after the completion of the renovation project of the clubhouse, the company generally has to issue a completion drawing with detailed requirements. When the relevant departments accept the clubhouse, the as-built drawing is essential, and the clubhouse should also put the as-built drawing on record to provide a basis for future maintenance and transformation.
The above is the decoration of the clubhouse brought to you by Bian Xiao. How? The whole content of the specific club decoration process.