Now a single commercial business has been unable to meet the consumer psychology of shopping, people are more eager to integrate shopping, dining and entertainment as one of the integrated commercial district. People shopping is not just for material needs, more is to meet the psychological needs and access to information: dating, gathering friends, see new things, participate in social activities, enjoy the fun of life to meet the people more and more empty life.
More and more developers use the word leisure to boast their avant-garde consumer consciousness, to emphasize the ability to satisfy people's complex shopping mentality to guide a healthy lifestyle, and this kind of composite consumer concept can drive the diversified development of commercial space. Urban leisure commercial street is a specific area in the city to leisure commercial services (food, entertainment, interaction, etc.) based on a variety of facilities gathered, is an important part of the urban leisure system.
Features are as follows:
(a) comfortable dining environment
But its intimate space and pleasant scale creates a strong leisure atmosphere. The whole street is divided into four functional areas: Chinese food, exotic flavors, bars and cafes, and leisure and entertainment. There are as many as several hundred famous brand merchants joining in, highlighting their unique taste with their own traditional or modern design and decoration. The appearance of the stores here is simple, with painted walls, open-air leisure tables and chairs on the street, wooden decorations that look rustic but not outdated, and a compact but not cluttered store layout. The whole leisure street is dominated by restaurants and bars, with Chinese food such as Shanghai local dishes, Chaozhou dishes and Anhui dishes, and Western food such as German, Italian and French restaurants.
(2) chic landscape design
The planning requirements of "elegant and quiet atmosphere as the background, modern European and American style as the characteristics, and the integration of international multiculturalism" are the fashionable landscapes of most of the commercial streets. Leisure Street is designed in continental style, with elegant taste and lush trees, it is a leisure corridor "taking the quiet in the middle of the bustle". There are modern sculptures, sketches, fountains, various kinds of expensive flowers, flower beds and bonsai in the neighborhood. These are different degrees to attract people's attention, so that the visual environment is colorful, no sense of monotony; spatial arrangement has a sense of hierarchy, people in which there is no sense of oppression.
(C) unique exotic flavor
A modern commercial street, including South Korea, Japan, France, Holland, Thailand, and other countries in the concentration of food and beverage cuisine, the formation of a unique Chinese and Western style food street. The main reason why many foreigners like to come to this kind of commercial street is that it feels like home. A small alleyway, but a blend of multi-national flavor, where you can taste a very different style of food. With a quiet and elegant environment as the background, modern European architecture as the characteristics, the integration of international diversified business characteristics, but also for the United Nations Food, leisure and new world. The subway station construction inspection and monitoring points
No. master control project monitoring points and standards
1 in the high risk and hazardous factors ① before construction did not investigate the underground pipelines and neighboring buildings (structures). ② support installation and removal is not in accordance with the program construction. Support structure removal does not meet the design or program requirements. ③ Deep foundation pits and other dangerous sub-parts of the project have not prepared special construction programs and have been evaluated by experts. Excavation and precipitation are not in accordance with the design and program requirements. ④ Depth and strength of enclosure structure are less than the design and program requirements. The deviation of verticality of enclosure structure exceeds the design allowable value, and the encroachment limit is not dealt with in place, which affects the thickness of main structure. ⑤ The steel support system is not erected in time according to the design requirements. The inclined support is not equipped with anti-slip device, there is no measure to prevent the steel support from falling, and the support is not pre-stressed according to the design requirements. (6) The deformation monitoring of foundation pit is not in place, and early warning analysis is not carried out in time. (7) abandoned soil, machinery and equipment, material stacking distance from the edge of the pit, the load does not meet the specification.
2 traffic relief ① preparation of traffic relief programs, occupation or excavation of urban roads reported to the traffic control department for approval. ② construction site set up upstream warning area, transition buffer zone, downstream guide area, and set up obvious signs. Assign people to cooperate with traffic police to assist in directing traffic during peak traffic hours. ③ barrier inside (outside) should be set up anti-collision facilities.
3 enclosure structure ① axis error shall not exceed ± 10mm, verticality control within 1/300. ② steel cage lifting point arrangement, spreader qualified by the check; before lifting, to develop a special program, and test lifting. ③ Continuous wall joints shall be dense and watertight. ④ Fences shall be set up around the mud pool and trench, and warning signs shall be hung. ⑤Machinery shall be firmly installed to prevent overturning.
4 Foundation pit excavation ① Prepare special program for safety of deep foundation pit excavation and be evaluated by experts. Through the acceptance of the excavation conditions are implemented in sections. ② pit surrounded by water retaining walls and not less than 1.2m guardrail, and set up protective nets, water retaining walls at least 0.2m above the surrounding ground, and to meet the flood control requirements. ③The upper and lower pits implement the flap system and set up pedestrian and escape routes. The surrounding pile load should meet the specification requirements. ④ Prepare emergency plans and conduct drills, and have sufficient emergency supplies. ⑤ Assign someone to direct the excavation operation and implement it according to the design requirements, and the slope should meet the specification requirements. (6) Long-arm excavator should be installed with video system. ⑦ precipitation must be implemented according to the design program, and observation of the surrounding surface and buildings.
5 Support erection and removal ①Steel support must be erected according to the design requirements, apply pre-stressing, set up anti-slip devices, and take measures against falling. The concrete support must reach the design strength before excavation. Excavation is organized according to the principle of first support and then excavate. When the excavation reaches 0.5m to the bottom of the support position, immediately set up the support and apply pre-stressing. The length of the active end is not more than 0.15m. ② steel confinement system meets the design requirements, behind the concrete must be filled with dense, yin and yang corners must take reinforcing measures. ③There are assembled emergency supports in the field. ④Steel support removal must be carried out after the structural concrete reaches the design strength and is reported to the supervisor for acceptance.
6 pit deformation monitoring ① support axial force, pile top horizontal displacement, horizontal lateral deformation of the perimeter pile, the surrounding soil and building settlement deformation, underground pipeline settlement warning value in line with design requirements. ② monitoring project exceeds the warning value should be promptly analyze the reasons and take appropriate measures. ③ Arrange to contact the monitoring unit to obtain monitoring reports in time to guide the construction.
7 main structure construction ① template bracket system has a check calculation. Spacing, scissor braces, sweeping rod in line with the program requirements, before pouring concrete should be checking the template support. ② bracket and template removal concrete strength must meet the design requirements, should be removed from top to bottom. ③ Reinforcement welding should take protective measures, and damage to the waterproof board is strictly prohibited. ④ Four openings and five edges should be set up as required for protection. The site is set up according to the requirements of the fire fighting equipment.
8 waterproof construction ① construction unit shall have the appropriate qualifications. ② waterproof material storage should meet the specification requirements, equipped with fire-fighting equipment. ③ before construction must be the enclosure structure leakage treatment. ④ tying steel, concrete pouring before the waterproof layer damage repair respectively.
9 lifting and hoisting ① lifting equipment limit safety devices are complete and effective, solid frame, and experience acceptance and certification. ② signalman, crane license, lifting operations strictly enforce the "ten do not hang". ③ gantry crane traveling track to be calculated.
10 underground pipeline protection ① preparation of underground pipeline protection program and emergency plan. ② access to information, explore the specifications of the pipeline, the depth of burial, the preparation of underground pipeline survey form, and mark the specific location on the construction plan. ③ Negotiate with the property rights unit to develop underground pipeline relocation or protection measures, set up signs on the ground above the pipeline, specify the person responsible for monitoring and control, and carry out special technical briefing for the construction personnel. ④ Mechanical excavation assigns a person to direct, strictly prohibit ultra-safe distance excavation in place at a time, near the pipeline using manual excavation.