Current location - Recipe Complete Network - Catering training - EIA filing project EIA filing category
EIA filing project EIA filing category

What's with the environmental protection filing?

environmental impact assessment filing: that is, the environmental impact assessment report, which is a predictive assessment of the impact of new construction, expansion and reconstruction projects on the environment.

based on the monitoring of groundwater and soil where the project is located, evaluate the design of raw materials, possible wastes and environmental protection facilities of the project, so as to evaluate the environmental impact of the project. The EIA is required by the government, and each project needs to complete the EIA report and report it to the Environmental Protection Bureau.

How to handle the online filing of EIA?

online filing of environmental impact assessment needs to follow a certain process to realize online declaration, approval and filing. The specific process is as follows:

1. Log in to the EIA website and upload the application materials to the website;

2. Waiting for the environmental protection department to review the materials, which usually takes 1-2 working days;

3. After passing the examination, the environmental protection department will issue a formal filing certificate and approval document, and the applicant can download or save the electronic version for filing. In addition, in order to ensure the smooth application process and accurate filing, it is recommended that the applicant carefully read the relevant rules, procedures and provisions of EIA filing, so as to better understand and master the procedures and skills of EIA filing. At the same time, pay attention to the integrity, accuracy and legality of materials, so as to better serve the cause of environmental protection.

what documents are needed for EIA registration and filing?

EIA registration and filing need documents:

1. Written application report for EIA filing.

2. Application form for qualification of environmental impact assessment of construction projects.

3. the original and duplicate copies of the business license of an enterprise as a legal person or the original and duplicate copies of the legal person certificate of a public institution.

4. Proof of workplace and site.

Handling process:

1. Make a list when sorting out data and collecting data, and deal with anything that has not been done quickly, so as not to cram for the Buddha at the last minute.

2. The preparation of EIA is very different, mainly divided into reports and report forms. Different industries, different scales and different regions have different EIA, so it's best to let an EIA engineer with relevant experience write it here.

3. Review here refers to the EIA report, which requires a review meeting. The EIA unit needs to introduce the process, sewage discharge, pollution sources, sewage discharge, environmental protection measures and investment of the project to experts and the Environmental Protection Bureau. Then the experts discussed and came to a conclusion.

4. generally speaking, the revised EIA will be written in the minutes of the review meeting: the revised EIA can be used as the basis for the design and environmental management of this project. It should be changed according to the revision opinions, and then handed over to the owner!

5. Of course, the final approval will be handed over to the EIA Bureau. After the above is done, there will be no big problem when you get the approval.

What is the application process of the EIA filing form?

1. The applicant shall register online by himself (visit the website http://112.27.211.31/reg/a/login for self-registration of the environmental impact registration form of the construction project).

2. The applicant logs into the system, fills in the materials according to the actual situation, and then clicks Submit.

3. After submission, the system will automatically generate a record number. After the record number is generated, the applicant will print the form by himself and sign it by the legal representative or principal responsible person to complete the filing.

what's the difference between EIA filing and EIA approval?

the difference between filing and approval is that filing doesn't need to be audited, but only relevant data can be put on the record of EIA. However, EIA approval must be submitted to the competent department of EIA for approval. After being audited by relevant departments and accepted on the spot, the EIA approval issued after reaching the standard is qualified. Therefore, EIA filing is relatively simple, and it can be submitted for filing, while EIA approval is more complicated, and the approval procedures are both complicated and strict.