Current location - Recipe Complete Network - Catering training - Kitchen bathroom how to do waterproof waterproof precautions have what
Kitchen bathroom how to do waterproof waterproof precautions have what
A, ground treatment

If you want to replace the bathroom floor tiles, you should chisel away the original floor tiles, be sure to use cement mortar to level the ground, and then do waterproofing. This will avoid waterproofing coatings causing leakage due to uneven thickness. The joints should be painted in place. The joints between the bathroom walls and floors, as well as the joints between the water and sewage pipes and the floor, are the places where problems are most likely to occur. You in the construction, must urge workers to deal with these edges and corners of the place, so waterproof coating must be painted in place.

Two, wall treatment

In general bathroom waterproofing treatment, the wall should also do about 30 centimeters of waterproof coating to prevent water from blotting through the wall. But if the bathroom wall is a non-load-bearing lightweight wall, the entire wall should be coated with waterproof coating. If your home uses a two-panel shower screen, the two connected walls should also be coated. If your home using a bathtub, and the bathtub adjacent to the wall, waterproof coating height than the bathtub along the upper edge of the height of some.

Three, wet and dry separation

"Wet and dry zoning" is currently a popular foreign design ideas, that is, the separation of the shower area and toilet, basin area. A brand tile designer said: "dry area and wet area can be achieved through the use of different materials and color tiles to achieve the division, so that the two do not interfere with each other, to avoid the splash of the previous kind of splash, after bathing, wipe the embarrassment of the West."

Four, waterproofing experiments must be done

After the construction of the bathroom renovation is completed, all the bathroom sinks blocked, and in the doorway to build a 25-centimeter-high "can", and then in the bathroom into the 20-centimeter-high water. After 24 hours, you then check around the walls and floor for leaks. This 24-hour waterproofing experiment, is to ensure the quality of the bathroom waterproofing project is the key, you must do.

Fifth, keep the water smooth

Bathroom all the downpipes, including floor drains, sanitary ware downpipes, etc., should be kept smooth. In order to fundamentally avoid the "flooding seven army" tragedy.

This answer is recommended by the healthy life classified person Lu Hongshuang

Comments

0 0

Guanzheng | Students

Specialized in: Pets

Other Answers

It is known to all that the kitchen and bathroom is the most water-using place, the ground if there is often water, the water is very likely to pass through the cracks in the wall, and flow into the wall and produce leakage. Walls and leakage, once the floor leaks at the drain blockage caused by the ground water, water is easy to leak down through the cement layer. So kitchen and bathroom waterproofing is very important. So how to do kitchen and bathroom waterproofing? Kitchen and bathroom is usually a small area, more pipes, walls and floors of the combination of more, and often contact with water, oil and chemical detergents, waterproofing requirements are very high. Therefore, in addition to the selection of kitchen and bathroom special waterproof material, in the waterproof construction but also in strict accordance with the following standards, you can put an end to the kitchen and bathroom leakage problems. One should deal with grass-roots level. First of all, the construction site for cleaning, pipes, floor drains around the cracks or drums, need to be chiseled into a "V" groove, in order to repair and strengthen. After the completion of the base surface cleanup needs to be wet overall sprinkler. Second, to repair the key parts. Walls and the joints between the ground and the joints between the sewer pipe and the ground, is the most likely place of leakage, waterproofing before the need to use kitchen and bathroom special repair mortar made of "r" angle, the treatment must be meticulous, there can not be the slightest sloppiness. Third, the overall waterproofing treatment. After the repair is completed, and then the whole painted kitchen and bathroom special durable waterproof slurry. In order to achieve a better waterproof effect, the general bathroom wall to do about 1.8 meters high waterproofing treatment, the conditions of the proposal to do full height, if it is a lightweight wall (such as gypsum board, etc.), must be done to paint full height; kitchen walls need to return to the high of at least 0.3 meters, washbasin and other parts of the water should be higher than the outlet of 0.5 meters; door frames and thresholds should be brushed ...