Air-conditioning Maintenance Safety Agreement 1 Party A: _ _ Pharmaceutical Factory.
Party B:
Party A and Party B have reached the following agreement on the maintenance of air-conditioning equipment through equal consultation:
I. Responsibilities and obligations of Party A:
1. Party A will hand over the air conditioning unit of the old factory building to Party B for maintenance. The fault is to fill the leak and add fluorine to the condenser.
2. Party A agrees to pay Party B a maintenance fee of RMB 3,000. 00 yuan) (including material costs). 2000 yuan will be paid in advance when the maintenance work is completed and delivered, and the rest will be paid in one lump sum within one week after the end of the three-month warranty period.
3. During Party B's maintenance and construction, Party A shall provide necessary facilities, such as site, water and electricity, tools and equipment entering and leaving the factory, etc. When welding, Party A will lend the welder to Party B for use.
4. After the equipment is repaired and delivered for use, Party A guarantees to operate in strict accordance with the equipment operation regulations, and the condenser is not flooded. If the fault is caused by Party A's illegal operation and use, Party B will not guarantee it.
5. Party A agrees that Party B will recover the residual fluorine of the device after the equipment is used up this year.
Two. Responsibilities and obligations of Party B:
1. Party B shall be responsible for the maintenance and delivery of air conditioning and refrigeration units before May 3 1. And the warranty period is three months, that is, until the end of August.
2. After the equipment is delivered for use, if the equipment fails during operation, Party B shall guarantee to be present for inspection and maintenance within 24 hours after Party A reports for repair.
3. Party B shall ensure the construction safety, and Party B shall be responsible for the safety accidents caused by non-compliance with safety regulations during the construction.
4. During the use of the equipment, Party B promises to check it twice a month.
Signature and seal of Party A's representative:
Signature and seal of Party B's representative:
20__ _ _ _ _ _ _ _
Air conditioning maintenance safety agreement II Party A:
Party B: _ _ Refrigeration Engineering Department
Party A and Party B have reached the following agreement on air conditioning maintenance through equal consultation:
1. Party A shall hand over all room air conditioners (see list) currently used to Party B for maintenance for one year. Party A agrees to pay the maintenance fee to Party B at the average cost of each set in RMB (in words).
2. The maintenance fees paid by Party A include air conditioning cleaning fees, door-to-door service fees, inspection fees, repair fees, and material fees except for large compressors.
Three. The following expenses are not within the scope of negotiation and payment in this agreement, and Party A shall negotiate and pay separately:
1. If the compressor is damaged, the cost of purchasing the compressor.
2. Construction cost and material cost of air conditioning installation and disassembly.
3, air conditioning power supply circuit failure.
4. Air conditioning maintenance costs and other labor costs not listed in the attached agreement of Party A. ..
Four. Party B's service commitment.
1. Clean and maintain the air conditioning in all rooms before the summer peak.
2. In winter and summer, conduct a patrol inspection on the use effect of air conditioners in all rooms in use, and solve problems in time when found.
3. Party B shall be present for handling within four hours after receiving Party A's fault declaration call.
4. During the construction period, Party B shall ensure self-study and abide by the safety operation rules, and Party B shall be responsible for the accidental injuries caused by the illegal construction of Party B's construction personnel.
5. Party B's construction personnel shall ensure that Party A's property at the site is not damaged and that the construction site is clean.
Verb (abbreviation of verb) Obligations of Party A:
1. Party A shall provide Party B with the convenience of water, electricity and site needed in the construction process. Construction time should be fully divided and coordinated. Party B's construction shall not be blocked without reason.
2. Party A shall facilitate the entry and exit of Party B's construction personnel and vehicles.
3. Party A shall pay in time according to the requirements of the agreement, and all departments shall not make things difficult for no reason.
Terms of payment for intransitive verbs:
1. Within one week after the agreement comes into effect, the down payment for the maintenance of the agreement is 70%, that is, RMB. The balance shall be paid within one week after the expiration of the agreement.
2. Party A shall pay the expenses beyond the agreement within one month after the construction is completed.
3. If Party A delays payment, it shall pay Party B a late fee of 2% of the payable amount every day.
Seven. Matters not covered in this agreement shall be settled by both parties through consultation. If negotiation fails, a lawsuit can be brought to the local people's court, which will make a ruling.
Eight. This agreement is made in duplicate, one for each party. It will take effect after being signed and sealed by representatives of both parties.
Signature (Seal) of Party A's Representative
Signature (Seal) of Party B's Representative
20__ _ _ _ _ _ _ _
Air conditioning maintenance safety agreement 3 Party A:
Party B:
Xx brand air conditioning products sold by Party A are entrusted to Party B for installation. For long-term friendly cooperation, both parties shall abide by the following terms:
1. Party B has the corresponding technical qualification certificate, a professional installation team, is familiar with the principle of refrigeration technology, has the ability to skillfully install and maintain refrigeration and air conditioning, and has the corresponding tools and equipment.
2. When Party B comes to install the air conditioner, it shall abide by the implementation standards of the brand manufacturer, with a generous appearance and neat dress, and shall not ask the user for a card during the installation. In case of complaint, Party A will punish Party B according to the corresponding punishment standard of the manufacturer.
3. After the installation is completed, Party B shall provide the installation card to Party A in time so that Party A can report to the manufacturer.
Four. If the air conditioner cannot be installed or used normally due to its own quality problems during installation, Party A shall replace it in time. If the air conditioner cannot be used normally due to improper installation and operation of Party B, Party B shall make on-site maintenance within 24 hours until the fault is eliminated. Party B shall abide by the xx-month installation warranty standard stipulated by the manufacturer. During this period, if the air conditioner fails due to installation, Party B shall come to the house for maintenance in time.
5. Party B shall strictly implement the safety operation standards, and Party B shall be responsible for the safety problems caused by improper operation during installation.
6. Party A shall settle Party B's installation fee on a monthly basis and shall not default.
Seven. Matters not covered:
Party A: (Seal)
Party B: (Seal)
Signature of representative:
Signature of representative:
Date:
Air Conditioning Maintenance Safety Agreement 4 Entrusting Party: (hereinafter referred to as Party A)
Construction party: (hereinafter referred to as Party B)
According to the operation requirements of air-conditioning equipment and in order to ensure the quality and time of air-conditioning maintenance, Party A and Party B sign this contract through consultation:
I. Items and prices:
2. This price includes other required spare parts and materials that are not included in the above table during maintenance. However, if there is a major failure (such as disassembling the compressor and piercing the heat exchanger, etc.). ) In the process of maintenance, quotations will be made according to their specific faults. The price shall be determined by both parties through consultation, and shall be purchased by Party A or Party B. ..
Third, the technical requirements:
After the maintenance of the main engine, all the maintenance parts can meet the normal refrigeration requirements after debugging and running.
Four. Rights and obligations of the entrusting party:
1. Provide necessary water, electricity and nitrogen in time.
2, should actively cooperate with Party B's construction.
3. In the process of construction, the entrusting party can supervise the construction quality of the contractor at any time.
Verb (abbreviation of verb) Rights and obligations of the constructor:
1, and finish the project on time according to the quality and quantity.
2. After entering the construction site of Party A, Party B shall abide by all rules and regulations of Party A. ..
3, responsible for the relevant formalities and expenses before entering the site.
4. Bring your own tools, cleaning chemicals and materials needed for maintenance.
Six, the construction period:
Complete all project contents within 10 days after the signing of this agreement.
Seven, the project price and payment method:
1. Total price of this project: RMB eighty thousand Wu Bai one hundred and seventy yuan only (¥805 17). 00)。
2. Within 3 days after the signing of the contract, Party A shall pay Party B 30% of the project payment, that is, twenty-four thousand one hundred and fifty-five yuan only (¥ 2,465,438+055.00); After the project is completed and accepted by Party A, Party A shall pay 60% of the project payment to Party B within 10, that is, forty-eight thousand three hundred and ten Yuan only (¥ 48310.00); The balance (65,438+00% of the project cost) is settled in one lump sum after the warranty period.
8. The quality guarantee period is six months, counting from the date when the project is accepted and delivered to Party A for use. If quality problems are caused by Party B's maintenance within six months (except for Party A's illegal operation), Party B shall rework and bear all expenses.
Nine, liability accident:
All safety accidents caused by Party B during the construction process shall be borne by Party B. If Party A's equipment and facilities are damaged, Party B shall pay compensation according to the price.
X. liability for breach of contract:
Both parties shall settle the matter through friendly negotiation. If negotiation fails, it shall be handled in accordance with the relevant provisions of the State Contract Law.
XI。 Matters not covered herein shall be settled by both parties through friendly negotiation.
12. This Agreement is made in quadruplicate, with Party A holding three copies and Party B holding one copy. This agreement shall come into force as of the date of signature.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Air conditioning maintenance safety agreement 5 Party A:
Party B:
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B, on the basis of equality, voluntariness and consensus, reach the following agreement on Party B's maintenance of air conditioners from Party A:
1. Party B is responsible for repairing 30 air conditioners (hanging up) in Party A's office.
Two. The maintenance contents of Party B are:
1, clean the air conditioner;
2, adding refrigeration additives;
3. Configure 10 air conditioner remote controller;
4. Other maintenance contents to ensure the normal operation of the air conditioner.
3. Party B promises to deliver the repaired air conditioner to Party A before March 28th, 20__ _ _. If the air conditioner fails again within 1 year from the delivery date, Party B shall provide free warranty in time.
4. Party B must ensure that the air conditioner is intact after disassembly, bear the responsibility of stolen air conditioner during maintenance, and ensure that it is installed and fixed after maintenance.
5. Without the consent of Party A, it is not allowed to subcontract the maintenance work to a third party without authorization, and it is not allowed to replace the air-conditioning components that do not need to be replaced without authorization. If replacement is really necessary, Party A shall be informed, and the replaced parts shall be consistent with the original parts or match the functional performance of the whole machine.
6. After the air conditioner maintenance is qualified, Party A shall pay the air conditioner maintenance fee to Party B in one lump sum. The expenses are calculated according to the contents of Party B's maintenance work (including tax). These include:
1, air conditioning cleaning and maintenance plus refrigerant 120 yuan/set;
2. Configure universal air conditioner remote controller 30 yuan/piece.
Seven. In case of any dispute during the performance of this contract, both parties shall settle it through consultation; If negotiation fails, either party may bring a lawsuit to the people's court.
Eight. For matters not covered in this contract, both parties shall make supplementary provisions after consultation, and the supplementary provisions shall have the same legal effect as these provisions.
Nine. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature and seal by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Air Conditioning Maintenance Safety Agreement 6 Party A: _ _ Trading Co., Ltd.
Party B: Trading Co., Ltd.
(Party A) sells _ _ _ _ _ _ _ _ brand air-conditioning products, and now entrusts Party B to install them. For long-term friendly cooperation, both parties shall abide by the following terms:
1. Party B has the corresponding technical qualification certificate, a professional installation team, is familiar with the principle of refrigeration technology, has the ability to skillfully install and maintain refrigeration and air conditioning, and has the corresponding tools and equipment.
2. When Party B comes to install the air conditioner, it shall abide by the implementation standards of the brand manufacturer, with a generous appearance and neat dress, and shall not ask the user for a card during the installation. In case of complaint, Party A will punish Party B according to the corresponding punishment standard of the manufacturer.
3. After the installation is completed, Party B shall provide the installation card to Party A in time so that Party A can report to the manufacturer.
Four. If the air conditioner cannot be installed or used normally due to its own quality problems during installation, Party A shall replace it in time. If the air conditioner cannot be used normally due to improper installation and operation of Party B, Party B shall make on-site maintenance within 24 hours until the fault is eliminated. Party B shall abide by the manufacturer's _ _ month installation warranty standard. During this period, if the air conditioner fails due to installation, Party B shall come to the house for maintenance in time.
5. Party B shall strictly implement the safety operation standards, and Party B shall be responsible for the safety problems caused by improper operation during installation.
6. Party A shall settle Party B's installation fee on a monthly basis and shall not default.
Matters not covered:
Party A: Trading Co., Ltd. (Seal)
Party B: (Seal) Signature of representative:
Signature of representative:
Date: 20 _ _ _ _ _
Air conditioning maintenance safety agreement 7 Party A:
Person in charge:
Contact telephone number:
Party B:
Person in charge:
Contact telephone number:
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B, on the basis of equality, voluntariness and consensus, reach the following agreement on Party B's maintenance of air conditioners from Party A:
1. Party B is responsible for the maintenance of the central air conditioning and air supply system on the first to third floors of the Baby World Shopping Mall in Future City;
Two. The maintenance contents of Party B are:
Cleaning and maintenance of cooling system (including main condenser, cooling tower and cooling pipeline); Cleaning and maintenance of refrigeration system (including main evaporator, boiler and refrigeration pipeline); Cleaning and maintenance of fan coil unit; The air conditioning system is maintained for one year.
3. Party B guarantees to complete the first maintenance before May 20th, 20__ _, to ensure normal operation. Within one year from the date of delivery of all air conditioners after maintenance, when the air conditioners fail again, Party B shall guarantee them free of charge in time.
4. Party B must ensure that the air conditioner is intact after disassembly, and promise to keep the disassembled air conditioner accessories during the maintenance period to ensure the fixed installation after maintenance. If the attachment is lost, Party B shall bear the responsibility. If there is any problem with the air conditioner in the mall, Party B shall be responsible for the maintenance immediately, and if there is any major accident, Party B shall bear it by itself.
5. Without the consent of Party A, the maintenance work shall not be subcontracted to a third party without authorization, and the air-conditioning components that do not need to be replaced shall not be replaced without authorization. If replacement is really necessary, Party A shall ensure that the replaced parts are consistent with the original parts or match the functional performance of the whole machine.
Payment method and amount of intransitive verbs: After the signing of this contract, Party A will pay Party B 5000 yuan for air-conditioning maintenance after the first cleaning and acceptance of the central air-conditioner; Pay 4000 yuan for the second time after winter maintenance acceptance; Pay the third payment at the end of the contract, and pay off the remaining 3000 yuan. Total cost: 12000. 00 yuan (in words: twelve thousand yuan only) Note: If the equipment (main engine, boiler, cooling tower, fan coil, etc. ) If the accessories need to be replaced or the motor needs to be repaired, the expenses shall be borne by Party A. Party B shall be responsible for cleaning the air-conditioning consumables.
Seven. In case of any dispute during the performance of this contract, both parties shall settle it through consultation; If negotiation fails, either party may bring a lawsuit to the people's court.
Eight. For matters not covered in this contract, both parties shall make supplementary provisions through consultation, which have the same legal effect as these provisions.
Nine. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature and seal by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _