What information should hydropower librarians generally do from the beginning of the project? (basement)

technical data

civil engineering completion data should include materials

1, opening and completion reports

① commencement report

② completion report

③ quality management inspection records of construction site

2, engineering survey positioning records

① engineering survey positioning records

② positioning sketch

3, construction organization design < Reinforcement quality certificate and test report

① Summary of reinforcement mechanical test report (including 31% witness sampling)

② Quality guarantee

③ Test report

Sample submission requirements: take a group of raw steel bars (4 bars with a length of 45-51 cm), one for each model (generally limited by the number of the quality certificate), and take several groups of samples from several quality certificates, just like continuous steel feeding in one period. The quality certificate is not included in the completion data, which is not implemented according to the specification requirements. The specific specification requires that hot-rolled ribbed steel, hot-rolled round steel, and waste heat-treated steel should be drawn with two bends, low-carbon steel hot-rolled disc should be drawn with two bends, cold-rolled twisted steel should generally be drawn with four pieces of 11T as a group, and cold-rolled ribbed steel should be drawn with two bends. )

7. cement factory certificate and test report

① summary table of test report

② cement quality certificate (28D strength report will be provided by the cement factory 28 days later)

③ test report

Sample submission requirements: generally, one quality certificate per vehicle is required for a test once a month, and cement testing is not required if cement is not put in this month. (As long as there is a quality assurance certificate and test report when the data is submitted to the supervisor, the cement quality assurance certificate without test report will not be included in the completion data in the future. Generally, the cement strength will be made once when cement, masonry and decoration are first introduced, and others only need to be stable. Generally, according to the specification, the strength grade of 511T is the same factory at the same delivery time)

8. Test report of welded joint

① Summary table of test report (including 31% witness sampling)

② Test report

③ covered electrode [certificate of conformity (obtained in covered electrode packaging), welding electrode quality certificate (provided by the manufacturer)], flux [flux quality certificate (provided by the manufacturer), and certificate of conformity. Flash butt welding and electroslag pressure welding are generally the same model, and the number of samples is determined according to the actual situation. If there are n models in this layer, N groups need to be sent. Flash butt welding is used for beam structures (including ground beams) and 211 joints are sent to a group (a group of 6 tensile specimens and 3 bending specimens are used for tensile bending), and electroslag pressure welding is used for columns and plates and 311 joints are sent to a group (a group) Single-sided welding is used for piles, ground beams, and if there are beams in the floor, samples should be taken (311 joints are a group, and 3 joints in a group are used for tensile test). In order to save the experimental cost, samples are sent in groups of different types of welded joints on each floor, and the samples are sent according to the specifications.

covered electrode, electroslag (generally one certificate for each layer) should have a certificate and a quality assurance certificate.

9, brick factory certificate and test report

① summary table of test report

② test report (provided by brick factory)

③ certificate

④ mechanical property test report (provided by laboratory)

Sample submission requirements: (1) 51,111 bricks in a group, with 15 bricks in a group. (2) Every 51,111 bricks are accepted as a batch. Sintered bricks, such as clay bricks, shale bricks, sintered coal gangue bricks, sintered fly ash bricks, etc., steam-cured (pressed) bricks, such as lime-sand bricks, fly ash bricks and slag bricks, Each acceptance batch samples a group (11 pieces in each group)

11, waterproof material certificate and test report

① Certificate of approval

② Inspection and test report (generally provided to us after being sent to the laboratory by the manufacturer)

③ Product quality certificate

④ Re-examination report of waterproof material (made by the manufacturer in the name of the company)

11, Sand and mortar mix list

① notice of concrete mix ratio

② report of concrete mix ratio design

③ notice of mix ratio of self-mixed concrete

④ notice of mix ratio of foundation M11 (cement mortar)

⑤ notice of mix ratio of main body (M5 mixed mortar)

Note: ① ② Two items are provided by the concrete company ③ ④ It is calculated by itself and sent to the laboratory

12, and the test report of concrete block. 11 with non-statistical evaluation)

④ Test report

⑤ Statistical evaluation (statistical evaluation when ≥11)

Note: Generally, one report and one auxiliary table for concrete strength are used, and the evaluation is made according to the different strengths of each division and each division.

sampling: each group of impermeability test blocks is 511m3, with 6 in general. Generally, there are 3 test blocks in a group of 1111 m3 (it can be pressed in 611-degree days under the same conditions at each sampling, and it takes 28 days for standard maintenance, and it can be pressed when the test blocks are dismantled). If the concrete is cast in a group of 211 m3 at one time,

13. Test report of mortar block

① Summary table of compressive strength test report of mortar block

② Test report

When sampling, there are 6 blocks in one layer, which is generally used for masonry.

14, foundation trench inspection record

15, Structural acceptance record

foundation (below 1.111)

quality control data: ① raw material test report of reinforcement

② welding test report

③ cement quality assurance sheet and retest report

④ concealed works

⑤ technical review

⑦ concrete block test report

⑦ brick certificate and test report

⑧ mortar. The obvious holes, honeycomb pits and exposed reinforcement meet the specification requirements of concrete

The surface smoothness of brick masonry is good, the mortar is full in mortar joints, and the groove joints are good, which meets the specification requirements.

main body (above 1.111)

the quality control data are similar to the above, except that the above item 9 is changed to settlement observation record.

16, concealed works

① foundation pit cushion stone

② foundation: I, reinforcement

Ⅱ, foundation concrete

Ⅲ, semi-basement wallboard, column, roof

Ⅳ, structural plane

Ⅳ, external wall concrete

Ⅳ, columns of each floor below the second floor.

17, technical review

① Gantry pile (and grey line shall be made before construction)

② Grouting hole position (specification is 1×1 symbol)

③ Axis size (axis deviation meets the specification requirements and axis deviation is 3 mm)

④ Template axis, elevation, section size and verticality flatness

⑤ Filled wall elevation (skin rod) Diary of concrete construction

Plate vibration, plug-in vibration

19, settlement observation record

① Schematic diagram of settlement observation (layout plan and sign diagram)

② Observation record of settlement

Note: once every upper floor, once every brick is laid in the building, and once every painted floor.

21. Inspection record of exhaust (wind) flue

Example: smoke inspection of exhaust flue, The standard branch 61 smoke is good/July 5, 2114, Xu Zhengbao

21, pile foundation data (with * operation completion data put in)

① Pile driving completion acceptance record (if the construction unit is qualified, it is not necessary to do it) *

② Project control point lofting review record *

③ Pile position deviation detection record *

④ Pile test record.

⑤ Construction organization design

⑤ Inspection lot of reinforced cage of concrete cast-in-place pile and finished pile inspection lot * (put into inspection lot separately)

⑦ Notice of re-inspection of drilling rig positioning and hole opening *

⑧ Construction record of bored pile *

⑨ Acceptance record of concealed works *

⑩ Completion drawing *

⑨ 11 Joint review of drawings of pile machine parts and Pile foundation test report

static load test

small strain test

23, sand and stone test report

sand analysis test report

sampling: generally, sand tests are made in the same place and with the same specifications, and every 411 m3 or 611t at the same entry time is an acceptance batch. Sampling sand 22KG, stones 41kg or 81kg in a group. (It is generally enough to take a sample at a construction site when the sand and gravel sampling is about 21 kg)

Application form for mix proportion of self-mixed concrete (C21 for roof, C21 for floor, C11 for cushion and C21 for sprayed concrete) and mortar:

24. Certificates of various products (there are several certificates)

① Aluminum alloy window ② glass ③ wooden door window ④ flue ④ Interior wall coating

25. Toilet ground water storage test

26. Acceptance record of foundation division project

Foundation (division): (1) Unsupported earthwork (sub-division)

① Earthwork excavation (sub-division) (quality acceptance form)

1. Inspection lot

② Earthwork backfill (sub-division) (quality acceptance form)

1. Inspection lot

(2) Supported earthwork (sub-division)

① Dewatering and drainage (deep well dewatering and open ditch drainage) (deep well dewatering and well pipe needs to be concealed)

② Anchor rod soil nailing wall concealment

(3) Foundation treatment (sub-division)

Pile foundation

① Concrete reinforcement cage (uplift pile and construction) Pile and specifications for inspection)

② Concrete pouring pile (uplift pile and engineering pile and specifications for inspection)

(4) Underground waterproofing

① Waterproof concrete (basement foundation slab, Column wall and roof)

② coating waterproof layer (basement exterior wall)

③ anchor and shotcrete support

(5) concrete foundation (including formwork, steel bar and concrete)

formwork

① formwork removal (breakdown) (quality acceptance form)

1. Inspection lot of removed parts

②. Installation site inspection lot

rebar

① raw materials (disciplines) (quality acceptance form)

1, raw materials inspection lot

② rebar processing (disciplines) (quality acceptance form)

1, rebar processing inspection lot

③ rebar connection (disciplines) (quality acceptance form)

1, rebar connection inspection lot < Reinforcement installation inspection lot

concrete (on the premise that these three items are commercial concrete, If self-mixing is used, five inspection lots are also used)

① Concrete construction (breakdown) (quality acceptance form)

1, concrete construction inspection lot

② Concrete dimension deviation (breakdown) (quality acceptance form)

1, concrete dimension deviation inspection lot

③ Concrete appearance quality (breakdown) (quality acceptance form)

1, Concrete appearance quality inspection lot

④ Quality acceptance record of concrete raw material inspection lot

⑤ Quality acceptance record of concrete mix design inspection lot

(5) Masonry foundation (sub-division)

Brick masonry inspection lot.

acceptance record: the retained strength of commercial concrete sampled according to the specification requirements meets the design requirements, and a group of samples are retained for water conservation as required.

27. Acceptance record of main branch project (itemized to each part)

Main branch: (1) Concrete structure (sub-branch) (including formwork, reinforcement and cast-in-place structure)

① formwork (sub-branch)

1. Formwork removal (quality acceptance form)

2. Formwork installation (2.

2. Reinforcement processing (quality acceptance form)

3. Reinforcement connection (quality acceptance form)

4. Reinforcement installation (quality acceptance form)

③ Cast-in-place structure (sub-division)

(2) Masonry structure (sub-division)

28, Decoration (sub-division): (1) ground (sub-division)

① cement (sub-division) (quality acceptance form)

② mortar (sub-division)

(2) plastering (sub-division)

① internal plastering (quality acceptance form)+inspection lot

② external plastering (. +inspection lot

(3) doors and windows (sub-division)

① Manufacture and installation of doors and windows

(4) Finishing (sub-division)

① Waterborne internal coating

② Waterborne external coating

③ Solvent coating

(5) Details (sub-division)

① Installation of guardrail and handrail. Installation

29, roofing (division): (1) coating waterproofing

① leveling layer

② waterproof layer

(2) tile roofing flat tile project

31, Completion acceptance table

① project quality completion acceptance record

② quality control data inspection record

③ unit (sub-unit) project safety and function inspection

data verification and main function spot check record

④ sensory quality inspection record

31, ready-mixed concrete certificate

① summary table of ready-mixed concrete and component certificate

② product certificate (press Certificate of approval and test report shall be provided for the mix proportion sheet)

Attachment: verticality and overall height measurement records of the building

Quality completion report and record

Completion acceptance report+acceptance plan+evaluation report of each unit

Sub-item contents:

Materials required for civil construction

1. Supervision plan for safe production and civilized construction of construction projects in Gongshu District, safety production and quality of construction projects, The responsibility book of civilized construction target management, the assessment index of target responsibility system, and the list of members of the supervision team (submitted by the quality and safety department with the project department before commencement)

2. Handling of sewage discharge permit and drainage permit

Need to provide

Construction permit, construction contract and construction site plan

Need to fill in

Hangzhou construction noise declaration form and basic situation table of engineering construction

Power of attorney for environmental impact assessment. Making contact sheet for building construction bulletin board

3. Application report for construction project commencement

4. Commencement report (the successful driving of the first test pile is the commencement date)

5. Inspection record of construction site quality management (Table A.1.1)

Management system, responsibility system, special work license and subcontractors on site.