In most cases, the work of measuring the decoration area is done by the decorator. Even if the owner takes a pen and paper to record on the side, the gesture change of the decorator is not easy to detect.
The original length of 25 cm is likely to become 28 cm.
There are 3 centimeters more here and 3 centimeters more there, and all these extra materials are in the pocket of the decoration company.
2. Take the split quotation to fool the owner. In order to make money, decoration companies always rack their brains and adopt the method of split quotation.
Originally a simple wardrobe, as long as the total price can be reported, but the intelligent decoration company is not, how many plates, how much paint, how much labor are needed, and then add them together.
This is much higher than the overall offer.
For example, a painter can paint all the paint on the walls, wardrobes, lockers and so on. In the home decoration, it is done in one go, but if it is dismantled, the paint on the wardrobe will have to wait until it is dry before it can be brushed for the second time and the third time, and the walls will have to be brushed for three or four times.
3. The decoration materials in the contract are often vague. In some contracts, the decoration company is vague about the materials. In the actual decoration, fake and shoddy materials may be used.
When the owner investigated, the decoration company took out the original contract, saying that the owner did not indicate the material brand.
Once the owner asks for the use of high-quality and environmentally-friendly decoration materials, the decoration company will ask for price increases.
Some decoration companies also indicate in the contract that if the original brand materials are out of stock during decoration, Party B's decoration company can temporarily replace the same model materials.
But whether this "same" is of the same quality or similar material is just not stated.
4. falsely reporting the loss of building materials when it comes to the loss reported by the decoration company to the owner, the decoration loss is far from as high as the decoration company said.
Normal loss of various processes: 800mm×800mm floor tile loss 6%, 300mm×450mm wall tile loss 5%, glue coating loss 3%, floor loss 5%.
Renovation contract is the decision of the decorator after consultation between the decoration owner and the decoration company, and it is the proof of the owner's acceptance and rights protection in the future.
Therefore, any requirements or matters related to the negotiation need to be clearly written in the renovation contract, and the evidence in black and white is the best protection for the interests of the owners.
The premise of signing renovation contract is that there can be no doubt when signing renovation contract. You should solve all the questions before signing the contract and write all the terms in the contract. Otherwise, the doubts when signing the contract are likely to become regrets after renovation.
5. The construction period is generally agreed to be 100 square meter of 2 bedrooms. If it is a simple decoration, the construction period is about 35 days. For the sake of insurance, the decoration company will generally agree on the construction period to 45-50 days. If you are in a hurry to move in, you can discuss this clause with the designer when signing the contract.
6. renovation contract, the payment method is general, with 60% down payment, 35% after carpentry acceptance and 5% after completion.
If you follow this form of payment, you have paid about 95% of the expenses to the decoration company after half of the construction period. If something goes wrong in the later period of decoration, it will be difficult to restrict the decoration company financially.
Therefore, it is suggested that when signing the contract, the down payment can be reduced to 30% and the interim payment can be 30%.
Interim payment: the interim payment time agreed in the general contract is simply marked as "halfway through the project, carpentry is finished".
However, a construction site is often a multi-project crossover operation, and more than half of the regular construction period should be: the end of timber; Kitchen and bathroom walls, floor tiles and ceiling bottoms; End of wall leveling; The electricity reform is over.
7. Increase or decrease projects In the renovation process, it is easy to increase or decrease projects, such as making more cabinets and changing several meters of water circuits.
These are all due when you finish.
So what should the unit price of these items be? If the construction has already started, then the design may have the final say.
Therefore, if possible, it is best to make a copy of the original complete quotation of the decoration company, so as to avoid the decoration company from changing the price when signing the contract or adding or subtracting projects.
Also note that when you finally settle the expenses, the increased or decreased expenses you should pay should be signed by you before the project construction. If you don't sign for it, you don't have to pay the corresponding fee.
8. Water and electricity costs In the process of decoration, water, electricity and gas will be used in site construction.
Generally, by the end of the project, the water and electricity charges add up to a lot, and who should pay this fee should also be indicated in the contract.
9. The construction of drawings shall be carried out in strict accordance with the drawings signed and approved by you. If the details and dimensions are inconsistent with the design drawings, you can ask for rework.
10, the time and frequency of supervision and quality inspection are generally assigned by the decoration company to each construction team to complete the project. Quality inspectors and supervisors are the most important means of supervision for decoration companies, and the time interval between their visits is particularly important for the quality of the project.
Supervise the quality inspection and should be present every two days.
The designer should also be present every 3-5 days to see if the site construction results are consistent with his own design.
1 1. Different projects have different warranty periods at the later stage of project completion. The owner can negotiate with the company according to the specific situation, and keep or detain part of the project money as the decoration quality deposit.