Emergency plan for flood control safety

Emergency plan for flood control safety in 2121 (6 articles in common)

In daily study, work and life, unexpected accidents sometimes occur. In order to make emergency response in time and reduce the consequences of accidents, it is often necessary to make emergency plans in advance. How to prepare the emergency plan? The following is my emergency plan for flood control safety in 2121 (6 articles in general), hoping to help you.

Emergency plan for flood control safety 1

Purpose: In order to ensure the normal life and work order of business households and the safety of life and property, and ensure the normal operation of all equipment, Make all buildings, facilities and equipment flood-proof safely in summer

Scope of application: supervise the implementation of the projects under the jurisdiction of the company

Project manager (duty manager in the second working time)

Responsibilities: Project Property Department, Engineering Department and Security Department are responsible for supervising and implementing

emergency procedures for flood control:

1. Flood control organization procedures

1. Set up a flood control team before the flood season comes.

2. When a dangerous situation occurs, the project manager is responsible for the deployment of material resources and manpower, the director of the engineering department is responsible for the on-site command, and the manager of the customer service center and the manager of the security department are responsible for the deployment of their own personnel to cooperate with the rescue. When the dangerous situation occurs at night and on weekends, the manager on duty is temporarily in charge of the command and promptly informs other members of the flood control team to rush to the scene.

2. Flood control measures of the engineering department in flood season

1. Set up a special storage room for flood control equipment, which mainly includes several submersible pumps, drainage hoses, waterproof distribution boxes, woven bags, sand, shovels, etc.

2. The key to the flood control equipment warehouse should be kept in the security department, the engineering department and the project department.

3. Before the flood season comes, the maintenance personnel and security patrol personnel of the engineering department should carefully inspect

(1) whether the drainage ditch of the roof platform is unobstructed, and at the same time clean up the garbage on the roof;

(2) Check whether the sewage pump in the underground water pit is sensitive and effective, and put the control in the "automatic" position;

(3) check whether there are deposits in the rainwater wells, sewage wells and rainwater pipes inside and outside the building, and remove them to ensure smooth drainage;

(4) check whether there is rain leakage in important computer rooms such as power distribution room and central control room, and handle it in time if there is any.

III. Danger handling procedures

1. If rainwater is poured into the underground machine room, the engineering personnel should start the sewage pump to drain in time, and block the machine room door with sandbags to protect all kinds of important equipment. At night and on weekends, the manager on duty, on the one hand, organizes personnel to carry out emergency rescue, on the other hand, immediately informs the project manager and other members of the flood control team;

2. The security personnel are under the command of the manager of the security department. Some personnel maintain order, while others assist the engineering department to eliminate danger and rescue equipment.

3. The personnel of the property management department shall clear the accumulated water everywhere;

4. After the dangerous situation occurs, it is necessary to conduct a comprehensive inspection, count the losses and material consumption caused by this flood, and replenish flood control materials in time to prepare for the next flood control;

5. The event handling process should be recorded in detail, and the project manager should report to the company leaders. Emergency plan for flood control safety 2

With the arrival of rainy season, according to the notice of Liuyang Safety Supervision Administration on doing well the current safety work of non-coal mine enterprises, flood control and flood prevention work is imminent. In order to spend the flood season safely, our mine has formulated an emergency plan for flood control, set up a leading group for flood control, and equipped it with sufficient materials, equipment and other flood control supplies to ensure the mine to spend the flood season safely and smoothly. The emergency plan is as follows:

1. Emergency principle:

Our mine adheres to the principle of giving priority to prevention, combining prevention with robbery, unified command, unified dispatch and obeying the overall situation, carries forward the spirit of unity and flood control, and actively cooperates and unites under the unified guidance of the leading group for mine flood control to ensure the safety of the mine.

2. Work plan:

Formulate flood control and flood control safety management system, and ensure that all members have flood control awareness, and implement the system to all teams and personnel. Timely conduct safety flood education and flood control safety responsibility education. Always check the preparation of flood control materials and the operation of flood control equipment to ensure the emergency when the flood comes. Strengthen logistics support and service to ensure the safety of personnel, materials, equipment and on-site work.

Third, set up the flood control and flood prevention front-line headquarters, with clear responsibilities:

Chief Commander: xxx

Deputy Chief Commander: xxx

Member: XXXXXXXXX

Chief Commander: take overall responsibility for flood control and flood prevention in the whole mine, and command flood control and flood prevention work in a unified way.

deputy commander: responsible for implementing the preemptive plan and mobilizing flood-fighting personnel and needed materials. Prepare emergency equipment in time, run to the designated place quickly according to the order of the commander-in-chief, and be responsible for the accommodation and other matters of disaster relief personnel.

members: carry out the instructions of the commander-in-chief, and be responsible for the supply and storage of flood control materials, the dispatch and transportation of equipment and all related matters of emergency rescue work. Medical group: the staff of Nanyue village health center is responsible for treating the injured in the rescue process.

IV. Emergency plan:

(1) Establish the flood control and flood prevention front-line headquarters under the command of the mine manager, divide the responsibilities, clarify the responsibilities, ensure that the responsibilities go to people, strengthen the dispatch, ensure that all actions are under command, and arrange special personnel to be on duty when the flood season comes, and set up a flood control and emergency rescue team.

(2) Make a good material supply plan, arrange the preparation of flood control materials, and prepare enough flood control materials such as woven bags, sand, pumps, shovels and raincoats before the flood season comes.

(3) Strengthen the maintenance and repair of loaders and generators put into the rescue site, so as to ensure the normal operation of temporary equipment in flood season and give full play to the emergency function of equipment in special periods.

(4) The materials and equipment threatened by floods on the ground shall be arranged by the mine commander in chief, and transported to the high safety zone as much as possible.

(5) The commander-in-chief should organize flood control team members to dredge flood drainage channels as much as possible according to the change of water level, so as to minimize the property loss of this mine.

(6) Xie Xiyuan is in charge of the custody team. According to the requirements and instructions of the headquarters, tools, materials and materials needed for flood fighting and emergency rescue work should be distributed to ensure the smooth progress of flood fighting and emergency rescue work.

(7) The medical group was served by the medical staff of Nanyue Village Health Center. During the emergency rescue, medical staff should visit the scene to provide timely treatment for the injured during the emergency rescue, and the seriously injured should be sent to the hospital for treatment in time.

(8) Xie Haibo is in charge of the car group, and there should be enough cars to transport the injured and medical staff during the emergency rescue.

(9) Xiong Shanbao is in charge of the communication group. After the accident, Xiong Shanbao is responsible for convening flood fighting and emergency rescue personnel, contacting relevant units at higher levels, and reporting relevant spirits and instructions from higher levels to the general commander in time.

(11), if the accident is too big for our unit to handle, we should immediately notify the mine rescue team for rescue.

V. Preparation quantity and storage location of emergency equipment and materials:

Emergency plan for flood control safety in the storage room of the factory department 3

I. Flood control situation and main tasks

Reconstruction after water damage, the reservoir area (hereinafter referred to as the reservoir area) was built in. The reservoir area is mainly responsible for nearly 3,111 hectares of paddy fields in Datun Town and the water demand for fish farming in state-owned fishing grounds. Because the dike project is not perfect, emergency rescue should be carried out every year. Especially since this year, due to flood storage and diversion measures, the water level in the reservoir area is relatively high. At present, the water level in the reservoir area has reached 132.45 meters. In addition, the Zhenlai Branch of the prison will still release water from Fang Shuitian into the reservoir area. Due to the high winds and waves in autumn, 4,421 meters of dikes have been in danger, including 2,111 meters of serious danger.

based on the principle of scientific and democratic decision-making, in order to ensure the safety of the reservoir area. The county government organized experts to demonstrate the flood control in the reservoir area on. According to the opinion of the expert group, it is determined that the general requirement of flood control and emergency rescue in the reservoir area is to adhere to safety first, to prevent first, and to rescue with all one's strength. We should not only keep the water, but also keep the embankment.

II. Specific arrangements for flood control work

(1) Set up a temporary headquarters for flood control and emergency rescue in the reservoir area to lead the organization. According to the actual situation in the reservoir area. The chief commander is the deputy magistrate of the county government, and the deputy chief commander is the chief procurator of the procuratorate, the director of the water conservancy bureau and the party secretary of the state-owned fishery. There are three working groups under the headquarters. First, the rescue team, headed by the director of the state-owned fishing ground, is mainly responsible for dispatching rescue manpower and materials and organizing flood control and rescue. Second, the material group, headed by the party secretary of the state-owned fishing ground and the director of the Fisheries Bureau, is mainly responsible for providing material support for emergency rescue. Third, the technical team, headed by the chief engineer of the Water Conservancy Bureau, is mainly responsible for proposing plans for the emergency rescue in the reservoir area and guiding the rescue work throughout. The emergency rescue in the reservoir area was led by the headquarters in a unified way, and the whole rescue work was tracked, supervised and inspected.

(2) The county and the fishing ground shall bear the responsibility, and the funds shall be implemented. The emergency rescue in the reservoir area is expected to cost 211,111 yuan. The county finance takes 1 million yuan, the fishing ground supports 1 million yuan, and the emergency rescue funds are earmarked for special purposes, which are uniformly dispatched, used and managed by the headquarters. Other emergency supplies, such as woven bags and bales, shall be solved by the headquarters in a unified way to coordinate with relevant departments and towns.

(3) focus on time and schedule. This time, the emergency rescue in the reservoir area took the form of fighting a tough battle. Concentrate manpower and material resources to ensure that the danger is relieved within ten days.

three, several requirements

(a) firm confidence. All localities and relevant departments should attach great importance to the emergency rescue work in the reservoir area and unify their thinking. We should regard it as a central task at present, raise awareness and unify our thinking. At present, it is especially necessary to do a good job in the ideological work of the cadres and workers in fishing grounds. It is necessary to strengthen positive publicity and guidance, educate the cadres to correctly look at the current situation, overcome the fear of difficulties and luck, fully understand the scientific, feasible and necessary decision-making of the county government, and then enhance their confidence and determination to do a good job in emergency rescue.

(2) divide the troops and handle the situation. The emergency rescue under the unified leadership of the headquarters, clear responsibilities. According to the current actual situation, the technical team should come up with a rescue plan as soon as possible, and put forward clear requirements for what standards each dangerous section should meet. According to the requirements of the technical team, the material team should prepare the materials in advance to ensure the emergency needs. The rescue team should implement the rescue personnel as soon as possible, ensure the team size, reasonably allocate labor and arrange time, and improve efficiency. At the same time, the fishery should implement the patrol personnel and adhere to the 24-hour patrol to ensure that measures can be taken in time in case of danger.

(3) ensure safety. Flood control work is of great responsibility and adheres to standards. All members of the headquarters must understand and treat this problem from the perspective of being responsible for the party and the cause and people's lives and property. They must be serious in work discipline, adhere to engineering standards, and strictly operate procedures to ensure that no mistakes are made. At the same time, in view of the fact that the dike traffic is constant and the weather is cold, various safety precautions and safeguard measures should be taken to ensure the construction safety.

(4) coordinated operations. The emergency rescue work in the reservoir area is closely coordinated. A key work in the county at present. All localities and relevant departments must have the overall situation concept, establish the idea of "playing a game of chess", take the initiative to stand, do their duty, and give full support to emergency rescue work. All working groups of the headquarters should enter their roles as soon as possible, clarify their responsibilities, implement their tasks, do a good job in linking up their work and actively cooperate to ensure the safety of the reservoir area during the flood season. Emergency plan for flood control safety 4

In order to prevent severe weather such as rainstorm, thunder and lightning, possible flood disasters, and ensure the personal safety of teachers and students and campus property, this emergency plan is formulated in combination with the actual situation of our town school.

1. Set up a leading group for preventing heavy rainfall and flood control

Team leader:

Team members:

2. Preparation work

1. Before the rainstorm, all primary and secondary schools should carefully check the school buildings to see if the roof leaks and the walls get wet, clean up drainage facilities such as sewer pipes and ditches, and repair them in time if there are any problems;

2. Educate teachers and students about the safety knowledge of preventing rainstorm, lightning and flood, so as to plan ahead;

3. Check the surrounding environment of the school to prevent accidents in the school due to external reasons. Schools close to hillsides should pay close attention to mountain conditions to prevent landslides and other disasters;

4. Check the circuit equipment to prevent accidents caused by water spray;

5. Units with the flood control task of Jushui River shall set up flood control emergency commandos, implement personnel and responsibilities, and prepare enough sandbags, sand, shovels, raincoats, flashlights and other flood control appliances;

6. Check the two gates and sections of the Jushui River embankment responsible for flood control in our central school, make flood control arrangements, and make good preparations for personnel and equipment;

7. Each school determines the evacuation route and resettlement place in case of emergency, and organizes teachers and students to carry out self-rescue, mutual rescue and escape drills.

Third, emergency measures

1. Pay attention to the weather forecast. In case of bad weather or flood season, all schools must be on duty 24 hours a day, and all personnel should keep communication open 24 hours a day, so that all kinds of personnel can be deployed in time in case of emergency;

2. During the rainstorm, the school personnel on duty and security personnel should patrol around the school frequently. Schools with students should focus on patrolling students' dormitories. If any danger is found, they should immediately report to the supervisor on duty and unit leaders to start emergency procedures.

3, strong lightning weather, to do a good job of school personnel and electrification, distance education equipment lightning protection;

4. Once the school building is in danger, quickly organize students to evacuate and move to a safe area in an orderly manner. Teachers should first ensure the personal safety of students;

5. Send information to relevant departments and personnel, report the situation and get support from all sides through campus radio, telephone, mobile phone and other media and communication tools in time;

6. Pay attention to the road conditions for students to go to and from school. If the road is damaged or there are potential safety hazards, the school should properly arrange the students and contact their parents in time;

7. According to the unified arrangement of the town government, organize personnel to do a good job in blocking the floodgates and preventing floods of the river bank.

IV. Work Requirements

1. We should attach great importance to it ideologically, overcome our paralysis and lax thinking in the spirit of being responsible for the cause of the party and the people, and make all preparations carefully;

2. We should do a good job in the work, with clear division of responsibilities and material reserves in place;

3. The organization should be coordinated and powerful to ensure the smooth implementation of government decrees. Emergency plan for flood control safety 5

1. Purpose

In order to protect the life safety of employees, ensure the safety of life and property of engineering personnel when the rainy season comes, ensure the normal construction of the construction site, and control the losses to a minimum, an emergency plan for flood control is formulated according to the spirit of relevant flood control documents of the state, province, city and county.

II. Organization

Sichuan Hangjian Foxconn Employees' Affordable Housing (Phase I)