Interior decoration technology includes Technical Specification for Sub-projects of Building Installation, etc.
Interior decoration specifications include Code for Fire Protection Design of Building Interior Decoration, Code for Fire Prevention Construction and Acceptance of Building Interior Decoration and Code for Quality Acceptance of Building Decoration Engineering. There are also "Inspection Standard for Bonding Strength of Ceramic Tiles in Building Engineering", "Code for Acceptance of Construction Quality of Building Ground Engineering", "Technical Code for Plastic Doors and Windows Engineering" and so on;
Interior decoration atlas includes interior decoration atlas of building floors and general decoration atlas.
The quickest way to learn how to read decoration engineering drawings by yourself is to learn from others, and the second way is to learn online, which is really bad. Buy a book to read.
What are the mandatory provisions in the national code for quality acceptance of architectural decoration projects?
1, architectural decoration engineering must be designed and complete construction drawing design documents must be issued.
2, architectural decoration engineering design must ensure the structural safety and main functions of the building. When the main body and load-bearing structure change or increase the load, the original structural design unit or the design unit with corresponding qualifications must check the relevant original data to verify the safety of the existing building structure.
3. Building decoration materials shall be treated with fire prevention, corrosion prevention and insect prevention according to the design requirements.
4, building decoration engineering construction, it is strictly prohibited to violate the design documents without changing the main building, load-bearing structure or main functions; Without the design confirmation and approval of relevant departments, it is strictly forbidden to dismantle and change the supporting designs of water, heating, electricity, gas and communication.
5. The construction unit shall abide by the laws and regulations on environmental protection and take effective measures to control the pollution and harm of various dusts, waste gases, wastes, noises and vibrations on the construction site to the surrounding environment.
6. The plastering layer of the exterior wall and ceiling must be firmly pasted between the base and each plastering layer.
7. The external doors and windows of the building must be installed firmly. When installing doors and windows on masonry, it is forbidden to fix them with nails.
8. It is forbidden to install heavy lamps, fans and other heavy objects on the keel of the suspended ceiling project.
9. The number, specification, location, connection mode and anti-corrosion treatment of embedded parts (or post-embedded parts) and connectors of facing installation project must meet the design requirements. The field drawing strength of the rear embedded parts must meet the design requirements. The decorative board must be installed firmly.
10, ceramic tile paste must be firm.
1 1, the structural bonding material used for hidden frame and semi-hidden frame curtain wall must be neutral silicone structural sealant, and its efficiency must comply with the provisions of "Silicone Structural Sealant for Building" (GB 17776); Silicone structural seals must be used within the validity period.
12, the number, specifications, location and anti-corrosion treatment of all kinds of embedded parts connecting the main structure and curtain wall must meet the requirements.
13, the connection between the curtain wall metal frame and the embedded parts of the main structure, the connection between columns and beams, and the installation of curtain wall panels must meet the design requirements, and the installation must be firm.
14, guardrail height, railing spacing and installation location must meet the design requirements. Guardrail installation must be firm.
DGJ32/J35-2006 Decoration Engineering Atlas recommended Baidu, and the first one was the cost. Their atlas download column has DGJ32/J35-2006 decoration engineering atlas, which can be downloaded directly for free. The network card is too slow to send emails, which is inconvenient.
What are the main construction procedures of the decoration project? Hello:
There are ten processes in general construction:
1: plastering works
2. Lightweight partition wall
3. Decorative panel project
4. Coating engineering
5: Suspended ceiling project
6. Paper pasting and soft packaging engineering
7: Doors and Windows Engineering
8. Detailed engineering
9. Building ground engineering
10: curtain wall project
-
What are the specifications for the decoration project? Code for Acceptance of Construction Quality of Building Decoration Engineering (GB502 10-200 1)
Code for Construction of Residential Decoration Engineering (GB 50327-200 1).
Beijing Advanced Building Decoration Engineering Quality Inspection and Evaluation Standard DBJ/T0 1-27-2003
Shanghai has a local standard "Code for Acceptance of Residential Decoration". . . . . . . . .
"20 12 Technical Standards for Energy Conservation and Environmental Protection of Decoration Engineering, Acceptance Standards for Construction Quality and National Mandatory Provisions $"
Acceptance standard of decoration engineering
1, radon
Code for indoor environmental pollution control of civil building engineering
Restricted range: ≥3.3Bq/m3
2. Free formaldehyde
Code for indoor environmental pollution control of civil building engineering
Inspection method of hygienic standard in public places.
Limit range: ≥0.00 1mg/m3
3. Benzene
Code for indoor environmental pollution control of civil building engineering
Standard method for air hygiene inspection in residential areas
Limit range: ≥0.005mg/m3
4、TVOC
Code for indoor environmental pollution control of civil building engineering
Limit range: ≥0.0 1mg/m3
5. Ammonia
Code for indoor environmental pollution control of civil building engineering
Inspection method of hygienic standard in public places.
Limit range: ≥0.0 1mg/m3
The Specification for Atlas of Ornamental Works generally specifies which ornamental works are as follows:
1), the variety, specification, style, basic structure and fixing method of ornamental design should meet the requirements of residents or design.
2) Gypsum ornamental design and paper ornamental design without waterproof treatment shall not be used in bathrooms and kitchens.
3) After the ornamental design is installed, protective measures should be taken to prevent damage.
What are the acceptance criteria for architectural decoration engineering? 1, sanitary ware, various valves, etc. Water-saving appliances should be actively adopted.
2, all kinds of sanitary equipment and pipeline installation should comply with the design requirements and the relevant provisions of the current national standards.
3, sanitary ware varieties, specifications, colors and drainage pipes, accessories should comply with the design requirements and should have the product certificate.
4, all kinds of sanitary ware and the ground or wall connection application metal fasteners installed firmly.
5. After the installation and acceptance of sanitary ware, appropriate finished product protection measures should be taken.
6, pipe laying should be horizontal flat vertical, pipe clamp position and pipe slope should comply with the specification requirements. All kinds of valves should be installed in correct and upright positions for easy use and maintenance.
7. Pipes buried in the wall and ground shall be treated with anti-corrosion and protected by cement mortar, and their thickness shall meet the following requirements: cold water pipes buried in the wall shall not be less than 10 mm, hot water pipes shall not be less than 15mm, and buried pipes shall not be less than10 mm. Pipes buried in the wall, ground or concealed shall be accepted as concealed works.
8. The installation of hot and cold water pipes should be hot on the left and cold on the right, and the parallel spacing should not be less than 200mm ... When the hot and cold water supply system uses a water separator for water supply, semi-flexible pipes should be used for connection.
9. The installation of all kinds of new pipes shall be carried out according to the product instructions provided by the manufacturer.
Lack of acceptance criteria
Quality acceptance disputes account for nearly 40%. The vast majority of property buyers have bought such a house once in their lives, and the decoration is basically a layman. Because most property buyers are not clear about the decoration standards provided by developers, and some developers have not made relevant agreements on what the standards are in the contract, the decoration quality is low, so it is easy to cause disputes.
What decoration budget does the decoration project include in the construction calculation, including wall cylindrical plastering, block surface layer, keel base layer, surface layer, decorative partition, curtain wall, ceiling surface plastering, keel base layer, surface layer, painting and shotcreting, etc. It is not a calculation formula that can solve the problem, but also master the calculation rules. Please read the explanation of budget quota.