Current location - Recipe Complete Network - Catering training - I am a waterproof worker and often find a contractor to work. I want to write a contract with the workers and ask my friends to give me some advice on how to write it.
I am a waterproof worker and often find a contractor to work. I want to write a contract with the workers and ask my friends to give me some advice on how to write it.
Construction (installation) project subcontract agreement contract number:

Employer: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B)

Project: Signing place:

In accordance with the relevant laws, administrative regulations and company system, following the principles of equality, voluntariness, fairness and good faith, and in order to complete this project in a safe, civilized, high-quality and rapid manner, this agreement is hereby signed by both parties through friendly negotiation and clear responsibilities, for mutual compliance.

1. Contract form: contract for small machines, tools and appliances, excluding materials. ((Party A shall provide dormitory, kitchen, water, electricity, tower crane, cargo cage and hanging cage, while Party B shall be responsible for all other woodworking machinery, mortar machine, colored tarpaulin, bucket car, hose, safety helmet, overtime lighting at night, and small machines and tools commonly used in various types of work).

2. Contract content and unit price: ① Project content: unit price: The above unit price includes rent, public works, ancillary works of the project and final acceptance. If the quality does not meet the requirements and progress of the on-site engineering model, 60% of the above unit price shall be settled according to the actual completed quantities. The monthly safety study and technical disclosure materials of shift workers should be submitted to the Information Department at the specified time every month, and the signature cannot be signed by one person. If the materials are not submitted on time, the progress payment will be deducted 200~ 1000 yuan each time, and the site supervisor will follow up.

Third, the security protocol:

1. All personnel of Party B must register in the security room of Party A's project department and apply for a work permit. It is strictly forbidden for unlicensed personnel to enter and leave the construction site and living quarters.

2. Party B must organize workers to participate in safety education and job training every month. After the new workers enter the site, they will be trained by the team leader, and untrained personnel are strictly forbidden to work at their posts. In case of work-related injury, Party B shall bear the expenses of 10%- 15% each time, and Party B shall not be less than 3,000 yuan each time. The study materials of all Party B's trainers must be signed by themselves (signing on their behalf is not allowed), collected at the specified time every month and submitted to the Information Department. If the materials are not submitted on time, the progress payment of 200 yuan-1000 yuan will be deducted each time.

3. All employees of Party B are not allowed to pile up any materials and articles on the grille, dismantle safety protection facilities and throw them at high altitude without the permission of the construction party, or they will be fined 100-200 yuan/time.

4. Party B's employees under the age of 16 are forbidden to work at their posts, and it is forbidden to bring children into the construction site and living quarters. When entering the construction site, you must wear a safety helmet, fasten your headband, wear a work license and other prescribed protective equipment. Do not wear slippers, barefoot, high heels and hard-soled shoes to enter the construction site, and do not urinate anywhere. If the security guard finds out that he took a candid photo, he will be fined 20-50 yuan each month.

5. Party B shall strictly abide by the safety production and fire prevention regulations: it is forbidden to smoke in the shed or bed with open flames, to pull wires and appliances without permission, and to start construction machinery by non-professionals.

6. Party B is strictly prohibited from taking drugs, whoring, gambling, drinking, fighting, resisting Europe and stealing in the construction site; Anyone who violates the regulations on safety and civilized management of the construction site or commits other illegal acts may be fined 1000 to 3,000 yuan for each violation, which constitutes a criminal act and shall be transferred to the public security organ for handling.

Four, machines, materials management and civilized construction management:

65438+

2. Cleaning and returning of machines, tools and materials: before Party B leaves the contracted project, all borrowed machines, tools and materials (such as mixers, mortar machines, vibrators, pumps, lamps, fasteners, joints, tie rods, upper and lower supports for steel pipe scaffolding and gantry, nail plates, etc.). ) should be returned to the warehouse, and timely cancellation procedures. Exceeding the normal loss, the original price is 65438+.

3. Loading, unloading and transportation of machinery, tools and materials: Within 50m from the construction building, Party B will use a hopper car for transshipment, and Party A will provide vehicle transshipment outside 50m from the building. But all machines and materials will be borrowed, used and returned, and the loading and unloading will be classified according to quality. Party B shall be responsible for all stacking, and the expenses shall be included in the contract unit price. If you have more questions, you can click the ID for consultation.