Legal analysis: (a) to establish and improve the responsibility system for the safe use of gas, gas operating procedures and other rules and regulations, the development of gas accident emergency response program, the system, the program and the list of operators of gas facilities and in the gas use of the place of publicity on the wall.
(2) regularly organize operators to participate in safety education and training, master the hazards of gas, explosion-proof measures and emergency disposal of common sense, familiar with the use of gas facilities and fire protection facilities, familiar with the relevant safety regulations and emergency disposal procedures.
(3) Designate a person responsible for the daily safety inspection of gas equipment and keep records to ensure the safe and reliable operation of the equipment, and take emergency measures immediately when gas leakage is found, and report to the gas supply enterprises and relevant departments. The gas supply enterprises will take the initiative to accept the home security checks and safe use of gas publicity and guidance on the gas supply enterprises security checks found in the safety hazards should be immediately implemented and rectified.
Legal basis: "Chengdu Gas Management Regulations" Article 15 Within the safety protection range of gas facilities, the following behaviors are prohibited: (a) planting of deep-rooted plants; (b) construction of buildings and structures unrelated to the gas; (c) stacking of heavy, flammable and explosive materials; (d) dumping and discharging of corrosive liquids; (e) damage to slopes and bailing cans; (f) welding, blasting, baking, and other hazards to the safety of gas facilities and other behaviors that endanger the safety of gas facilities. For the construction of gas facilities need to operate within the scope of safety protection, should be examined and agreed by the gas administrative department, and implemented under the supervision of the gas companies involved. Need to relocate the gas facilities, the gas companies involved are responsible for relocation, the cost of which is borne by the construction unit.