1, the installation of the cold storage base plate
First of all, the ground should be leveled, if it is not level, it will have an effect on the whole of the library, and at the same time, we should do a good job of the evaporator drainage system;
A, the base plate under the ground should be padded between the ground, to ensure that there is no hollow
B, the library board splicing should be the locking hooks locking tightly, and to keep the corners to its
2, the cold storage stand-up boards Installation
Select a corner near the inside of the room, locate the vertical plate and the bottom plate, and lock the locking hook tightly. Extend this corner like both sides. In the installation to the evaporator
Do a good job of the drainage system.
A, keep the library board flat
B, lock hook tightly locked
C, in the selection of a corner of the beginning of the installation, it is best to have someone to hold, to be stabilized before
3, the installation of the top plate of the cold storage
from the cold storage of both sides of the installation inward, in the last board is, you need to hold up and then at the same time to put down. The locking hook should be tightly locked
A. Installation from both sides inward
B. Locking locking hook
4. Silicone sealing treatment and installation of equipment
A. Silicone should be played as much as possible at the end of the day, which can prevent the touching of bad without solidification, and the silicone should be played to keep the sealing, glossy, and smooth
B. Installation of the cold storage equipment according to the construction drawings and the site conditions