In 2007, Seventeen Metallurgical Group completed 2×1780m3 blast furnace project in Jiujiang, Jiangxi Province (right photo). And it has successively undertaken the 1800m3 blast furnace project of Jilin Tonggang, the 1280m3 blast furnace project of Shandong Fulun, and the 450m3 blast furnace project of Suzhou Steel, etc. Now some of these projects have been completed and put into operation. Now some of these projects have been completed and put into operation, creating good benefits for the owners, and some are under construction.
Seventeen Metallurgy constructed the Yangtze River Steel Plant Capacity Replacement and Technical Reform Project. The capacity replacement and technical reform project of Yangtze River Steel Plant is divided into two major systems, namely iron making and steel making, including civil construction, steel structure installation, installation and commissioning of electromechanical pipeline equipment, etc. The project is large in volume and has high construction requirements. Wuhu Conch Building Project constructed by China 17 Metallurgical Group. Wuhu Conch Building project constructed by China Seventeen Metallurgical Group has a building area of 99810m2, with a maximum single span of 34.4m, 3 floors underground, 24 floors above ground, and a total building height of 93.20m. 1-9 floors of the project are five-star hotels, and 10-24 floors are office buildings, which integrates food and beverage, entertainment, and office.
Maanshan City People's Bank of China Apartment District is a high-rise residential district commissioned by the People's Bank of China Maanshan City Central Sub-branch to be developed and constructed by the company, which is located in the area between Taibai Center Avenue and the Maanshan City Center Sub-branch. The district is located at the intersection of Taibai Center Avenue and Yongfeng River, *** there are two 17-storey, a 15-storey residential building, a 2-storey training center building and an underground car garage, with a total floor area of 27,000 square meters. early March 2007, the People's Bank of China Apartment high-rise residential project was grandly commenced as scheduled. December 2008, the People's Bank of China Apartment was completed and delivered to the use on schedule.