Do private roads in rural areas need state approval?
Private road construction in rural areas needs state approval, because the land is owned by the state.

First, the process is as follows:

1, apply to the village committee, and apply to the brigade for approval after the application is approved;

2. We must act in strict accordance with laws and regulations; Third, after passing the examination and approval of the Urban Construction Bureau, you need to pay the relevant fees, and you can start road construction only after you get the examination and approval procedures.

Extension:

1. Safety standard for the construction of rural special roads: if bridges and aqueducts are built across roads or facilities such as pipelines are erected or buried, the consent of the relevant traffic authorities shall be obtained in advance, and if traffic safety is affected, the consent of the relevant public security organs must also be obtained; The facilities built, erected or buried shall meet the requirements of technical standards for highway engineering.

2. Matters needing attention in rural road construction: The kilometer construction must be planned by the state and approved by relevant departments. In the process of survey, the interests and natural ecology of towns along the route should be considered. Quality and safety first, make full use of materials. It is forbidden to cut corners. The completed highway should have a solid subgrade, the pavement should meet the highway driving grade standard, and the safety facilities should be in place.

Legal basis:

People's Republic of China (PRC) Highway Law

Twenty-fifth highway construction projects must be submitted to the transportation departments of local people's governments at or above the county level for approval in accordance with the provisions of the transportation departments of the State Council.

Article 75 Whoever, in violation of the provisions of Article 25 of this Law, carries out construction without the approval of the relevant transportation authorities shall be ordered by the transportation authorities to stop construction and may be fined not more than 50,000 yuan.

People's Republic of China (PRC) building law

Article 8 To apply for a construction permit, the following conditions shall be met:

(a) has gone through the approval procedures for construction land;

(two) the construction project in the urban planning area has obtained the planning permit;

(three) the need for demolition, demolition progress in line with the construction requirements;

(4) The construction enterprise has determined;

(five) there are construction drawings and technical data to meet the needs of construction;

(six) there are specific measures to ensure the quality and safety of the project;

(seven) the construction funds have been implemented;

(8) Other conditions as prescribed by laws and administrative regulations.

The construction administrative department shall, within fifteen days from the date of receiving the application, issue a construction permit to the qualified application.