Current location - Recipe Complete Network - Complete recipe book - First and Last Train Timetable of Metro Line 8
First and Last Train Timetable of Metro Line 8
Guangzhou Metro Line 8 is a ***28 subway station, which is Wanshengwei, Pazhou, Xingang East, Modiesha, Chigang, Kecun, Lujiang, Zhongda, Xiaogang, Changgang, Baogang Avenue, Shayuan, Fenghuang New Village, Tongfuxi, Cultural Park, Hualin Temple, Chenjiaci, Rainbow Bridge, Xicun, Gooseberry Pagoda, etc. The whole line passes through Haizhu District, Liwan District, Yuexiu District and Baiyun District.

Guangzhou Metro Line 8 is the eighth line of Guangzhou Metro. On September 25th, 20 10, the first phase project (from Changgang Station to Wanshengwei Station) was opened for operation, and the west extension project (from Fenghuang Xincun Station to Changgang Station) was opened on October 3rd, 20 10/kloc-0.

On 20 191February 28th, the extension project (from Fenghuang Xincun Station to Cultural Park Station) was opened, and on 26/20201month, the north extension project (from Cultural Park to Jiaoxin Section) was opened, and the logo color was blue-green.

Subway introduction

Guangzhou Metro Line 8 starts from Cultural Park Station, passes through Liwan District and Haizhu District, runs through Guangzhou International Convention and Exhibition Center, along Xingang Road, and ends at Wanshengwei Station, with an L-shaped east-west direction.

Subway is a fast, large-capacity rail transit with electric traction built in cities. Trains run on fully enclosed lines, the lines located in the central city are basically located in underground tunnels, and the lines outside the central city are generally located on viaducts or on the ground. Subway is a high-density and high-volume urban rail transit system covering all kinds of underground and above-ground road rights in urban areas.