Xicun Station is the interchange station between Guangzhou Metro Line 5 and Guangzhou Metro Line 8 (not opened). Line 5 is located at the junction of Huanshi West Road, Xizeng Road and Xiwan Road in Liwan District, Guangzhou, and was partially opened on February 28th, 2009.
Some platforms of Line 8 were delayed due to the demolition construction, and Rainbow Bridge Station was not put into operation at the beginning of its opening operation at the end of 2020 (from the cultural park to the heart). It is expected to be opened and put into use in 20021year.
Extended data
Station location-
Xicun Station-Line 5 is located at the junction of Huanshi West Road and Xiwan Road. Part of Line 8 is located on the south side of Xizeng Road, Huanshi West Road. During the construction, the expansion conditions of Line 5 have been reserved in the existing South Station Hall.
Demolition of the fence on the side of Xizeng Road in the south station hall can be connected and merged with the station hall of Line 8. It is expected that the transfer between Line 5 and Line 8 will be realized through the South Station Hall. The platform of Line 8 will be located on the second floor on the southwest side of Line 5.
Baidu encyclopedia-xicunzhan