Can you make a lot of money by going to work on the construction site in 219?
Building a house on the site is responsible for the construction of steel bars. Steel bars are the most important part of building construction. First of all, the foundation pile caps and the steel bars used in the pile caps are the most important structures to support the whole house. Of course, piling is required under the pile caps, and then the foundation beams, columns, walls, plates and so on, all of which need steel bars. This is what steel workers do.

how much is the rebar worker's salary a day?

Steel reinforcement workers are also divided into several categories: coolies (who can't do it very well), hourly workers, contractors, colliers, batching (aniseed and minor materials), and substitute workers (who manage the site and copy the drawings)

Wages of coolies: coolies generally enter the industry, and the salary is around 2. After 2-3 months' experience, they can become big workers.

Hourly work: Hourly work refers to doing whatever the boss tells you to do, and the salary is calculated by the hour, 24-28 hours. Usually do it for 9-11 hours a day.

contract work: contract work refers to how much money the boss gives you for this package, as long as you finish it. If you work fast, you will earn more money, and if you work slowly, you will earn less. Contract work is divided into package binding and batching. Package binding is calculated on a square basis, and several people are asked to work together. When meeting the deadline, they have to work overtime, which may be 15 hours or even more a day, but it can reach 5-1 yuan in a day. This contractor decides the working speed, and no one is willing to work with you.

ingredients: ingredients are divided into big materials and small materials. Big materials refer to large steel bars (beams and columns), while small materials refer to small steel bars (slab steel bars and stirrups). The salary of big materials is higher than other wages, because it is the hardest work, except for lifting steel bars or lifting steel bars, there are very few jobs now. Generally, the contractor pays 6-1+ a day, so it is not so hard to compensate small materials. There may be several

site management for the project: it is responsible for arranging the construction of the site workers, and the management personnel must read the steel bar drawings and know the representation methods in the drawings before they can know how to construct.

Drawing sample review: the most skilled and important person in steel bar engineering. Drawing sample review is to calculate the amount of steel bars, where and how much steel bars are used, and so on. If there is an error in steel bar sample review, the project rework will cause huge losses.

Their salary is calculated on a monthly basis. Generally, the on-site management costs about 1, yuan a month, and the sample-turning salary is 2,-3, yuan higher than that of the on-site management.

There is also a help salary. The construction site pays great attention to the construction period. When people are short of manpower, they will ask someone to help them for a few days, usually 3+ a day, and 4 or 5 yuan when people are short of manpower.

During the Chinese New Year in 217, a boss in Shanghai called and said that he asked us to tie steel bars to help for a few days. At that time, 6 yuan wanted to go to all four families for 9 hours a day. At that time, it was 2,4 yuan a day, and he was paid to work for only three days. Because it was the second day of junior high school, it was only after the New Year, and we had to visit our relatives, so we didn't go. If we could work for a week, we wouldn't hesitate. It's just that there is little reinforcement work, and it can only be done for three days.