Current location - Recipe Complete Network - Take-out food franchise - What are the two terminals of Xi Metro Line 5?
What are the two terminals of Xi Metro Line 5?
The reasons for the two terminals of Xi Metro Line 5 are as follows:

1 and the two terminals of Xi Metro Line 5 are determined according to the design requirements.

The original intention of 2.Xi subway line 5 is to solve the traffic flow problem in the north-south direction of the urban area, so it needs to run through the whole urban area from north to south.

3. At the same time, in order to cooperate with the government's urban planning and traffic control, the designer divided the terminal into two parts, namely Chenggong New City and Weibin Park.

4. The setting of these two terminals can meet the traffic demand in the north-south direction of the urban area, and can also provide more convenient urban public transport services for the surrounding residents. So Xi Metro Line 5 has two terminals. Xi Metro Line 5 is a subway line of Xi Metro, with a total length of about 38.9 kilometers and 32 stations. It was put into trial operation on February 28th, 20 19, and it is the ninth subway line in Xi subway network.