According to the relevant provisions of the Code for the Operation and Management of Urban Rail Transit, various factors such as operational safety, night maintenance requirements, running-in degree at the initial stage of line opening, passenger travel requirements, etc. are comprehensively considered.
The initial operation time of Hefei Metro Line 3 is tentatively set at 06:00-22: 15, that is, the first and last buses leave at 6:00 and 22: 15 respectively, and arrive at Xiangcheng Road Station at 6:48 and 23:25.
Free shuttle service for passengers.
As an important part of the skeleton network in the network planning, Line 3 is interchanged with 1 line (already in operation), Line 2 (already in operation), Line 4 (under construction) and Line 5 (under construction), and the interchange station is Hefei Railway Station (1 interchange).
Xiqilitang Station (Line 2 transfer), Library Station, Miaofang Station (Line 4 transfer) and Haitang Station (Line 5 transfer). After the opening of Line 3, passengers can transfer to 1 Line and Line 3 at Hefei Railway Station and Line 2 and Line 3 at Xiqilitang Station.