Located on Longxue South Waterway, it is an important external communication channel for Guangdong-Hong Kong-Macao Greater Bay Area.
The construction of Mingzhu Bay Bridge started on March 3, 20 18, and the last steel beam member was completed on February 3, 20 19, completing the closure project of the main bridge. It was opened to traffic on June 28th, 20021year, and the opening ceremony was held.
Mingzhu Bay Bridge starts from Nansha Xingang Avenue in the north, crosses Longxue South Waterway and reaches Wanxin Avenue in the south; The total length of the line is about 9. 1 km, and the length of the bridge is 2.64 km. The bridge deck is a two-way eight-lane urban trunk road with a design speed of 60 km/h; The total investment of the project is 47150,000 yuan.