Selected Project Completion and Acceptance Report

First, the project overview

The project is located in xxxx, the original building for the three-storey (partially four-storey) concrete frame structure, building area of 1,800m2, after the internal reconstruction and indoor and outdoor decorations as the xxxx business building, in addition to the office space, but also includes the office auxiliary In addition to office space, it also includes office support space: large and small meeting rooms, lounges, multifunctional halls as well as sanitation and refreshment. Among them, the ground floor to the hall as the core, and the two main external window departments (service center, business department) supplemented by computer rooms, switchboards, monitoring rooms and other spatial segregation; the second and third floors are mainly office space, respectively, a horizontal corridor to the sides of the expansion of the offices of the various functional departments on both sides; the fourth floor consists of multifunctional halls and the Department of Technology and Quality Assurance, which is the main multifunctional hall to the meeting, and take into account the recreation, is the core part of the fourth floor.

The external decoration of the project: the ground floor is dry-hanging granite finish, the second floor and above the external wall using composite aluminum panels and hollow hidden frame glass combination curtain wall. The overall design is undertaken by Shanghai XXXX, and the special design of curtain wall is undertaken by Building Materials Group XXXX. Shanghai xxxxx decoration company general contract, Shanghai xxxxx responsible for the construction of curtain wall project.

The project floor, halls, aisles, stair treads and other parts of the selection of American white hemp granite, Chinese black marble; service center, computer room, switchboard monitoring room with anti-static flooring; multifunctional hall with teak flooring; sanitation, pantry, etc., using Asia Venus series of floor tiles; offices, conference rooms, etc., the selection of light wood-colored composite flooring. Indoor separation according to different functional requirements, respectively, the use of lightweight partitions (light steel keel base, double-sided paper gypsum board) and glass partitions, supplemented by metal trim and finishing strips. In the ceiling project, the aisle and the hall on the ground floor adopt the water wave shape compound paper-faced gypsum board surface layer; the top multifunctional hall adopts the inverted pyramid modeling art ceiling; the other office areas adopt the mineral wool board surface layer ceiling. The interior decoration project is designed by xxxx Design Institute and constructed by Shanghai xxxxx Decoration Company.

The fire-fighting system (sprinkler, smoke sensor, fire hydrant, etc.) of the project was constructed by Shanghai XXXX.

The air-conditioning system adopts Daikin ceiling-type air-conditioning unit, which is constructed by Shanghai xxxxxx.

The computer system is designed and constructed by Shanghai xxxx Computer Center.

The project has been started since xxxx and basically completed by xxxxxxx.

Second, the composition of the construction supervision organization

General Supervision Engineer:

Deputy General Supervision Engineer:

Technical Consultant:

Professionals in charge of

Decorative

Strong and weak power

Documentation

Drainage

Civil

Safety

The construction of the project has been completed since xxxx.

III. Supervision contract fulfillment

xxxx Co., Ltd. and xxxxx Supervision Co., Ltd. signed a supervision contract for this project on xxxx, and the contract agreed that the implementation would start on xxxx and be completed by xxxxxx. Due to the change of design drawings and other factors, the construction period was extended, and according to the contract, the supervision work was postponed until the completion of the construction content of the project.

Throughout the supervision process, the supervision unit follows the principles of impartiality, independence and autonomy, operates in strict accordance with the relevant provisions of the contract of supervision of the project, provides scientific and high-quality supervision services to the owner, and actively does a good job in coordinating the work of the owner and the construction unit.

Fourth, the effectiveness of supervision

According to the characteristics of the construction of this decorative project, supervision of the implementation of the work at the same time in order to prepare the "brick wall demolition project supervision rules", "interior decoration project construction supervision rules". In terms of quality, in strict accordance with the current national norms, standards and the company's standard requirements, in accordance with the pre-control, monitoring, after the verification and side stations, patrol tracking inspection of the supervision procedures for layer by layer checking, strict management. And to assist and guide the construction unit to do a good job in the preparation of construction organization design, collection, collation and archiving of technical data of construction. In the weekly site meeting, the supervisor will be the construction site (existence) of the problem and the treatment method and so on to the owner to report, urge the construction unit to strengthen the quality of the construction site, safety management, and in a timely manner will be the new norms, standards, and the spirit of the notice to all parties involved in the meeting to introduce the project to be able to high-quality, high-standard completion of the project to provide the basis for the science. At the same time, in the process of supervision of the project has also been the owner, design units, construction units of strong support and understanding, all parties cooperate more tacit understanding.

Part 2

Leaders, comrades, hello:

Today, xxx neighborhood 5# residential building project was officially completed and accepted. Here, on behalf of the construction unit, I came to participate in the completion and acceptance of the guests and leaders at all levels in the construction of careful guidance and strong support, to express a warm welcome and heartfelt thanks. Now on behalf of Yan'an City Construction and Installation Engineering Company, the first company, the construction and quality of the project to report:

A basic overview of the project construction

The project is located in the south section of Jiefang Road, Luochuan County, 5 # building (the former Grain Bureau yard), the project by the xxx real estate development company limited to develop and construct, xxx design and research institute design, xxx engineering surveying company limited to survey, xxx engineering supervision limited liability company. The project is developed and constructed by xxx Real Estate Development Co., Ltd, designed by xxx Design Institute, surveyed by xxx Engineering Survey Co., Ltd, supervised by xxx Engineering Supervision Co.

The project with a basement floor, a brick structure, divided into four units, seven floors above ground, the height of 2.9m, the building for? concave? Type arrangement, length 84.6m, width 18.84m, height 22.6m, building area 8900m2. winning the total cost of 8.9 million yuan, seismic intensity of 6 degrees, the design life of the building structure for 50 years.

The project started on March 6, XX, November 20, XX has been fully completed drawings and design and Party A changes to increase all engineering projects.

Second, the construction quality requirements, quality control and inspection sampling

(1) base and foundation works:

Foundation wet subsidence level of ⅲ self-temperature subsidence, using large excavation foundation treatment. From the outer edge of the outer wall foundation outside 2.50 meters, large excavation to the design elevation -7.30m, 1:9 backfill 1.5m, 3:7 gray soil backfill 2.00m after making brick strip foundation, plain soil, gray soil compaction coefficient is not less than 0.97, the thickness of each layer of false pavement is 250mm-300mm, layer by layer for the dry density test, bedding layer is completed, tested by the Shaanxi Liyuan monitoring station, the artificial foundation test acceptance Qualified. It meets the requirements of construction acceptance specification. The concrete strength grade of foundation structure: foundation and main body are c25, and the foundation bricks below 0.000 are made of mu10 solid bricks and masonry of m10 cement mortar. Foundation and foundation engineering control information, division. Sub-inspection and acceptance of qualified to meet the requirements, safety function test qualified.

(2) the main structural engineering

The main structural part of the concrete strength level of c25, masonry bricks are mu10 ordinary solid bricks, m10 mortar masonry, and the floor slabs are pre-stressed porous slabs. The appearance quality of concrete molding is qualified, and the thickness of protective layer of steel reinforcement meets the requirements. Masonry mortar mortar full, horizontal flat and straight in line with the specification requirements, the main project control information in the raw materials into the field such as steel, cement, all kinds of bricks into the field certificate of conformity and field test report, construction records, etc. *** check and acceptance of 12 items, all qualified in line with the requirements of sub *** check and acceptance of 16 items in line with the requirements of the safety and functional inspection and sampling inspection and acceptance of qualified.

(3) decorative works

The interior walls, ceilings, stairwells are cement mortar stucco, white latex putty calendering surface smooth and smooth, consistent color.

The exterior walls are all cement mortar brushed walls, using acrylic exterior paint (due to climatic conditions affecting the exterior paint dumping project), the wall surface is smooth, straight hewers, the color is consistent with the requirements.

Floor ground engineering using c20 slag bedding, the surface is smooth, in line with the requirements.

Windows using 80 series plastic steel windows, entry doors for steel security doors, installation and supporting accessories installed firmly, doors and windows of the three secret performance test meets the requirements. Quality control information, construction records check and acceptance, sub-projects *** check and acceptance of 17 items in line with the requirements of the safety and functional inspection of sampling acceptance.

(4) roofing project

Roofing for waterproofing membrane roofing, using 1:6 cement coking slag slope, waterproofing using sbs flexible body waterproofing membrane 4mm, coil into the field retest qualified, roof detailing, drainage are in line with the requirements of quality control information, construction records check acceptance in line with the requirements of sub-checking acceptance of 4 items in line with the requirements of safety and functional inspection acceptance. Meet the requirements.

(5) water supply and drainage and heating works:

The water supply pipe adopts pp-r pipe, the drainage pipe adopts pvc-u pipe, the water supply water pressure test, pipe flushing test without leakage, pipeline direction is reasonable, easy to use, the drainage pipe for water filling, full water ball test, drainage, no blockage phenomenon, in line with the requirements. Heating pipe using pe-rt pipe, insulation material selection of rock wool pipe.

Model 2

First, the project quality acceptance

1, civil engineering:

(1) civil engineering single acceptance engineering work process

construction unit in the completion of a single project in the course of construction, by the A side of the infrastructure office of the construction workers and supervisory company supervisors throughout the supervision and tracking of the construction, when every single project is completed, the construction unit for self-checking, qualified, and then by the infrastructure office of the construction worker and supervising company supervisor, follow up the construction, when each completed single project, the construction unit for self-checking. Qualified, and then by the infrastructure construction, supervisory company supervisors qualified after the initial inspection by the construction unit to submit a written application for single project acceptance report, by the infrastructure division of the organization of the relevant units of personnel, according to the construction specifications, design drawings and requirements for a comprehensive acceptance, qualified to make a single project acceptance of the information before the next step in the construction of the single project.

(2) key acceptance parts

① excavation foundation is completed, the construction unit submitted a written acceptance application report, by the design unit of the designers *** with the participation of acceptance, such as hidden works, the need for the design unit to provide hidden works construction program, by the Office of the Construction Division of the construction workers and supervisors supervise the completion of the construction unit to do a good job of all the information and written acceptance application report, the construction workers, supervisors and supervisors, the construction unit to do all the information and written acceptance application report. The infrastructure construction, supervision of the company's supervisors signed the approval, and then by the infrastructure organization units and personnel for acceptance, qualified for the next step in the process of construction.

② After the completion of the foundation is also a key part of the acceptance.

③ After the completion of the single layer is also a key part of the acceptance.

④ After the completion of the main body is also a key part of the acceptance.

⑤ After the completion of the decorative work is also a key acceptance part.

⑥ water, electricity, heating is the key acceptance part.

⑦ Reinforced concrete work is the key acceptance part.

2, participating units and personnel:

Infrastructure Division is responsible for the organization, the construction of specific projects in the Infrastructure Division of the construction staff, the person in charge of the Infrastructure Division, the supervisory company supervisors and superintendent or the technical director, deputy director of the Office of the General Engineer, the construction unit technicians, construction personnel, the person in charge of the participation of the Office of the Audit sometimes participate in the construction of a random check more often.

After the completion of the project, the construction unit by the construction unit after passing the self-inspection, written application for the completion of the acceptance of the project, organized by the Office of the infrastructure units and personnel to participate in the acceptance and acceptance of the individual project information and to ensure that the completion of the information and the quality of the project to the project view, the use of the project as the main body of the functionality of the overall acceptance, after passing the signing and writing of the acceptance of the project.

3, reinforcing steel acceptance

At the beginning of the project, the construction side according to the project budget of the type of steel, the number of contractual design requirements, etc., the construction side of the purchase of steel, reinforcing steel batch into the site and to the Office of the Infrastructure (Supervision) to provide the origin of the product, the certificate of conformity and the material single, by the Office of the Infrastructure and construction **** with the sampling, sent to the County Quality Inspection Station for testing and qualification before being used, the test sheet into the project guarantee information. The test sheet into the project to ensure that the information. After the completion of each individual project, reinforcing cage binding support molding is completed, by the construction unit written acceptance report, by the supervisory company, infrastructure specific construction personnel and leadership, as well as the construction unit to participate in the *** with the drawings and design requirements, one by one to check and control, in line with the construction specifications and design requirements before the next step of the project, pouring concrete and visa recognition, the formation of guarantee information and settlement basis.

4, concrete acceptance acceptance

I unit in the three-phase project, in addition to individual supply pumps can not reach the location of the sporadic projects, all the use of commercial concrete, concrete supply station for each batch of concrete test blocks, sent to the county testing center for test pressure, to determine the compressive strength of concrete, as the construction side of the guarantee information, inspection work with.

All the main works of the three phases of the project are supplied by Jincheng commercial mixing plant. Road surface and other works with a small amount of Yu Wang commercial mixing station, Zouping Transportation Bureau commercial mixing station.

5, the construction of the control of mortar

construction unit transported into the sand, stone, cement and infrastructure after a piece of sampling, sent to the county testing station for testing, and then according to the design requirements: issued with the proportion of mortar with the single, in the infrastructure under the supervision of the construction staff, weighing to determine the volume of volume capacity, according to the volume of volume capacity with the mixing of mortar. Infrastructure Division, Audit Office often check, although the control is more stringent, but the human operation will be loopholes, which is the key part of the inspection.

Second, the volume of acceptance

1, the volume of work refers to the amount of construction according to the design of engineering drawings and drawings of changes, the amount of hidden works.

Concealed engineering appeared by the design department, the infrastructure office of the person in charge of technology to determine the construction program, by the construction team according to the construction program for construction, by the owner of the site construction personnel, supervisory company supervisors and construction team personnel to participate in the *** with the measurements, to confirm the amount of work, written into the project visa for the basis of the settlement of the project, the project is completed during the project, the project has been unable to determine the amount of work of the concealed after the completion of the project. The project is completed during the project, after the completion of the project has been unable to determine the amount of hidden works. Acceptance of the amount of work is also in accordance with the procedures of engineering construction of a unit project completion, auditing, acceptance and quality of the project a piece of work, after the completion of the acceptance, the vast majority of the words have been unable to complete the work, can only be seen (the exposed part of the) to do the shape of the profile test, the actual meaning is not very big. Because in the process of construction of the project has been part of the acceptance, fully able to achieve the purpose of acceptance of the project volume.

2. The main civil works of Phase III were constructed and accepted according to the above practice.

A, Coal Tower B, Chimney C, Coke Oven 1 No. 2 D, Coke Quenching Tower 2

E, Coal Distribution Tower F, Screening Coke Building G, Transfer Station H, Coal and Coke Passage Corridor (steel) I, Central Control Building J, Air Pressure Station K, Boiler Room (steel) L, Demineralized Water Workshop (steel) M, Cold Drum Workshop (steel and mixed structure) N, Condensate Pumping Station O, 201 Power Distribution Room P, Refrigeration Station Q, Comprehensive Pumping Room R, cool water tower

S, sewage treatment plant office building (concrete frame)

T, a number of other structures, including pools, etc. U, staff dormitory building (brick structure) V, three coke tasted the four coke field W, the main road in the three-phase, sewage treatment plant roads, sewage treatment plant X, sewage treatment plant biochemical pond plant (steel) Y, sewage treatment plant, two vegetable greenhouses (steel)