Picture: Renovation learning, netizens share valuable experience
The end of the renovation, can be said to have been a subversive education, the process and content of this renovation and my previous understanding of the difference is quite large, a sentence to summarize, that is, "too much decorative learning, cats are also too much". I hope to share with you the lessons I've learned and the truth I've realized.

Here are some specifics:

Kitchen Installation: In advance of the installation must be installed.

1, before the installation of cabinets, the need to change (such as gas piping) should be changed.

2, outlet panels can be installed first, installed cabinets and then installed panels sometimes inconvenient.

3, gas water heater installed, with the packaging of the box site to create a protective shell, save a lot of late cleaning trouble.

4, prepare a curtain, grinding cabinets when the dust is very large, can prevent dust drift into the room.

5, any small place to operate on site to save the trouble of the second change in the future, even if the manufacturer's attitude is very good, but again, we have to make an appointment, but also at home, etc., is always a drain on people's energy.

Brand store: Faraday Cabinets

6, cabinets usually and hoods and stoves to be about the same day, to coordinate. The advantage of this is that there are cabinets can be adjusted on the spot according to the specific circumstances, such as the opening of the mouth size is slightly different.

Brand store: DEI kitchen appliances

Floor installation: first door? First floor?

1, first installed flooring, so that the master of the door can minimize the gap between the door and the floor, the gap is small, dustproof, sound insulation effect is good, leave a big gap, visually not too beautiful.

2, clean the room in advance, the installer will also clean, but not cleaned carefully. Prevent too much ash, you can use a vacuum cleaner, but not in the installation of the day before the sprinkling, sprinkling the ground moisture can not dry, affecting the floor. If sprinkling, it is best to a few days in advance, so that the ground is thoroughly dry.

3, skirting the place usually have to play the eye to install dowels, in case there is a special pipeline, we must think and the master said, it is best to write in advance in the "Newspaper sticker" on the paste, glued in a conspicuous position, in case of temporary forgetting, and the master of the action is too fast (a classmate had this encounter, the pipe leakage).

4, first installed flooring, and the door frame skirting can first stay long, do not nail nail, back to the door master to cut the right and then nailed.

Brand store: square decorated solid wood flooring

5, flooring general paving method is "smooth light and long", but not absolutely dead. My living room smooth light and smooth long contradiction, and finally chose to lay long, which is also the floor Dr. told me: contradiction can be paved in accordance with the direction of the living room to walk, to reduce wear and tear on the floor. And so the doorway of the bedroom does not have a fastener, I do not like the fastener.

Installing the door: a lot of work, be sure to protect the floor

1, first install the floor and then install the door, be sure to protect the floor. I am from the beginning of the renovation on the conscious collection of large pieces of packaging cardboard boxes, to later used as floor protection.

2, the doorway of the place usually do not paint, with the rest of the paint to the doorway casually brush, can enhance the strength of the styrofoam. This is the master told me to install the door, just my home paint is still a little left to throw, the master helped me brush.

Brand store: Aupu bath hegemony

Other installations:

1, bath hegemony is best to install a little bit off, listening to students say, in the right above may not be very safe.

2, when installing the stone sill, pay attention to the "corner", many sills are not right-angled, inexperienced workers come up as a matter of course in accordance with the right-angled cut. Remember to remind him to measure first, get it right and then do it. Although we will be very tired, but the results should be good, tired also has a meaning. Now the decoration industry is such a situation, he is not professional, if you do not think more about yourself, the effect may not be ideal.

Brand store: Kohler Bathroom

3, the toilet is best to ask the toilet manufacturer is responsible for the installation, out of the question to save the tug of war.

4, lamps and lanterns are also best to ask the party of the electric change to install, one is familiar with the situation, and the second is to prevent problems with the skin, I think "skin" the word special image.

Brand store: Faber Bathroom Hardware

5, other kitchen and bathroom hardware in front of the eyes to make sure to avoid the water and electricity road.

6, any to the wall mounted things to think before doing.

A: This thing is sure to be installed here.

B: installed program has been repeatedly put forward a good.

Brand store: Yi Meng fabric

7, curtain rod do not install to the top, to not appear to be oppressive.

8, the location of the hand towel rack should be handy, I heard of people's hand towel rack installed in the rise a bit to get the place.

9, bathroom shelves without glass plate good cleaning.

10, their own preparation of a little something glass adhesive, than the quality of workers with their own master.

11, prepare a level ruler, many installation places are used.

Installation stage often encountered problems and solutions:

One, the workers are not allowed to time, not allowed to time even if, but also do not call in advance to inform a notice.

1, late: delivery, installation of workers late is a common thing, said 9:00 to the results of more than 10:00 has not yet come, but also do not take the initiative to call, you call the past to ask about the situation, said that right away, the results may have to wait until 3:00 p.m., 4:00 p.m. only to come, it is not possible to wait a day, to the evening.

2, early arrival: late to make people upset, early arrival is also very depressing to say. Say goodbye to 3:00 p.m. to come, the results of 11:00 a.m. to call you, that has been downstairs in your home, so you were caught off guard, rushed to the site.

3, pigeonholing does not come: said today to come, left and right and so do not come. Call the three urged four asked, and finally said, today can not come, change tomorrow.

The solution:

Take the initiative to call beforehand to confirm the phone number of the specific installation workers, more contact. After the incident, try not to be angry, really angry on the birth of a moment, and comfort themselves that: who home renovation are like this.

Second, things did not bring all.

It is easy to come, found that a door plate, less a bracket, anyway, today is not likely to be completely finished, but also the second door. Either is particularly professional, lack of tools do not bring all, resulting in a lot of projects can not be done, to do barely the effect is not guaranteed.

The solution: recognize yourself, or what else?

Three, time to rush, too late, installed sloppy, their acceptance is sloppy.

Workers rushed to come, too late, in order to fight for time to rush, the results of the "speed is not enough", the busier the more chaos, or can perfunctory perfunctory, installed not fine. There is easy to install the finished, they are also very tired, acceptance is not careful, and so the workers left, and then found the problem.

The solution: even late work can not be sloppy, he wanted to rush, you can not control, but we can control themselves: the installation process to keep an eye on the point, when a good supervisor ~ ~ ~ ~ acceptance of the time to be careful, do not take for granted, and change the test must try

Four, accidentally break your home

My bathroom door to move in to the new paste good also painted the The wall scratched a long one, I was that depressed ah, asked the master of the Hedgehog, said the repair to 300 dollars, but the small workers are also particularly poor, and finally he gave me a hundred, let him go, but also promised to return to not talk to his company. Luckily, the effect of the later repair is not bad, basically can not see.

And I've heard that when the neighbors were installing the lights, the hammer fell to the ground and cracked the tiles on the floor. Moving cabinets broke the installed lights. Scratch the security doors, furniture, interior doors, etc., etc., etc.

The solution: pay more attention to the protection of their finished products, can do to protect all to do. Posting of eye-catching warning signs, such as a large white paper on the door to write: please be careful, do not scratch the door. Don't bother, remind the workers: my floor is solid wood, please be careful, and so on and so forth.

Five, the tools left in your home

This problem does not often happen, but it is not rare. He's coming to pick up his tools, and you have to make an appointment with him to wait for him at the site.

The solution: when he left, he asked in passing: your tools are well brought ha, do not fall.