Project Overview and Bidding Scope 2.1 Project Overview: Tianjin Metro Line 10 Phase I Project, the construction scale of 24 kilometers, 23 stations, the line starting point for the head of Liyuan, the line terminates at the Nandian Station, with a total investment of 23,203,000,000 yuan.
According to the "National Development and Reform Commission on the second phase of Tianjin urban rail transit construction planning (2015 ~ 2020) of the approval" (Development and Reform Foundation 〔2015〕 No. 2098 document) shows that Tianjin Metro Line 10 Phase I project for the head of the Liyuan station to the Nandian station 24 kilometers long, the construction period of 2015 to 2020, the current 10 line Yu Dongcheng to Liyuan Head interval has begun construction, Nandian to Yudong City, that is, the start of the survey and design of the general contracting section.
Metro line 10 and z2 line in the Nandian area planning to set up interchange station. At present, the Binhai new area government is promoting z2 line preliminary work, to be z2 line Nandian section implementation, synchronized construction of subway line 10 Yu Dongcheng to Nandian section engineering construction. Affected by the Z2 line project, 10 line a northern section is planned to be completed in 2025 and Z2 line together with the commissioning, and Yu Dongcheng to LiYuanTou interval of about 21.2 kilometers, *** set up 21 stops, and strive for the first half of 2021 with the conditions of the commissioning.
This article comes from the authors of the motor home car family, does not represent the views of the motor home position.