Current location - Recipe Complete Network - Catering franchise - There are several landfill plants in Hainan Province, where are they and what is their scale?
There are several landfill plants in Hainan Province, where are they and what is their scale?

yanchunling landfill is the only domestic waste disposal landfill in Haikou city at present, which is located in the periphery of the old industrial development zone in Chengmai county, 38km away from the downtown area of Haikou. It was completed and put into operation in 2111. It is the main garbage disposal site in Haikou and Chengmai.

yanchunling garbage disposal plant in Haikou is the first modern garbage disposal plant in Haikou city, which adopts sanitary landfill technology which is mature in the world and widely used in advanced countries, with a total investment of 41 million yuan. According to the present situation of Yanchunling garbage disposal site in Haikou, Haikou Environmental Sanitation Bureau plans to develop and utilize the biogas resources of Yanchunling garbage disposal site, improve the landfill gas pollution control system of Yanchunling garbage disposal site in Haikou, eliminate the potential safety hazard caused by landfill biogas and the pollution to the surrounding ecological environment and the harm to public health, and recycle biogas to generate electricity. On October 31, 2117, Haikou Environmental Sanitation Bureau signed a related agreement with our company, and our company, as the project owner, was responsible for the investment and construction of the whole biogas utilization project in Yanchunling Waste Treatment Plant. According to the preliminary idea of the project, this project is located in Yanchunling garbage disposal yard in Haikou City, covering an area of 1321m2, with a total investment of 41 million yuan. The power plant will be equipped with two Waxair 1111KW units, with a total power generation of 262.8 million Kwh during the 21-year operation period, and a total COD emission reduction of 113,211 tons. The project started construction in early 2118 and was connected to the grid for power generation on May 5, 2119.