question 1: how to handle the qualification of fire fighting construction? Handling of Grade III fire-fighting qualification: 1. Channels for submission of qualification-related materials of fire-fighting facilities engineering contracting enterprises < P > (1) Initial application for fire-fighting qualification, re-approval and qualification extension
1. If applying for Grade I and II fire-fighting qualification, the applicant enterprise will submit the application materials to the provincial public security fire department;
2. To apply for the third-level fire protection qualification, the applicant shall report the application materials to the local public security fire department;
3. In case of applying for additional firefighting qualification, the applicant enterprise shall report the application materials to the local municipal competent department of construction.
(2) If the fire protection qualification level is applied for upgrading
1. If the main fire protection qualification is applied for upgrading, the applicant enterprise will submit the application materials to the provincial public security fire department; If the enterprise's main fire-fighting qualification is upgraded from level three to level two, the local public security fire department shall also submit the enterprise's initial declaration and annual assessment files to the provincial public security fire department.
2. If an enterprise applies for an additional fire-fighting qualification upgrade, the applicant enterprise will report the application materials to the relevant construction authorities.
(3) Annual assessment of fire fighting qualification
1. If the main item is fire fighting qualification, the assessment data shall be submitted to the local public security fire department;
2. If the additional item is fire-fighting qualification, the assessment data shall be submitted to the competent construction department.
II. Application materials for enterprises
(1) Initial application, addition, upgrade, re-approval and extension of fire fighting qualification
Enterprises need to provide four copies of the Application Form for Enterprise Qualification in Construction Industry (including electronic documents) and corresponding attachments, and bind them in the following order:
Volume I: Comprehensive information
1. Copy of business license of enterprise as a legal person.
2. Original and duplicate of enterprise qualification certificate;
3. Articles of Association;
4. Statistical statements of the construction industry of the enterprise in recent three years;
5. The audited financial statements of the enterprise for the last three years;
6. Employment documents and identity certificates of the legal representative of the enterprise;
7. The identity certificates of enterprise managers and technical and financial directors, professional title certificates, and the engineering performance certification materials of technical directors' representatives required by relevant qualification standards;
8. Provide equipment purchase invoices and metrological verification certificates, house property certificate or house lease contract of the factory (office) and other relevant certificates;
9, enterprise safety production license;
among them, the enterprise applying for qualification for the first time does not need to provide the materials mentioned in 2, 4, 5 and 9 above, but should provide the documents of enterprise safety production management system.
If an enterprise applies for restructuring, division or merger and needs to re-verify its qualification, it shall provide the following information and include it in this book:
11. Scheme of enterprise restructuring, division and merger (including the division of production, personnel and engineering performance between the new enterprise and the original enterprise);
11, the approval document of enterprise restructuring, division and merger or the resolution of shareholders' meeting or workers' congress;
12, enterprise restructuring and division should provide financial statements and statistical statements of the enterprise in the last three years before the restructuring and division;
13. For business combination, the financial statements, statistical statements and latest consolidated statements of each enterprise in the last three years before the merger shall be provided;
Volume II: Personnel Information
1. Identity certificates and registration certificates of registered personnel listed in the Application Form for Qualification of Construction Enterprises;
2. Professional title certificate, identity certificate and endowment insurance certificate of non-registered professionals required by the qualification standards of construction enterprises;
3. The professional title certificate, identity certificate and endowment insurance certificate of special professional and technical personnel required by fire engineering construction enterprises;
Volume III: Engineering performance data (not provided for applying for the lowest level qualification)
1. Engineering contract and letter of acceptance;
2. Completion acceptance certificate or quality verification materials (automatic fire-fighting facilities inspection report and construction project acceptance opinions issued by local public security fire department) that meet national regulations
(2) Annual assessment of fire-fighting qualification
Enterprises need to provide two copies of the Application Form for Annual Qualification Assessment of Shandong Fire-fighting Facilities Engineering Contracting Enterprises (including electronic documents) and corresponding attachments, and bind them in the following order:
1.
2. The original and duplicate of the enterprise qualification certificate;
3. Statistics of the construction industry of the enterprise this year;
4. The audited financial statements of the enterprise this year;
5, enterprise safety production license;
6. documents of appointment, identity certificate, professional title certificate and other materials of the legal representative, manager, technical director and financial director of the enterprise;
7. Equipment purchase invoice and metrological verification certificate, house title certificate or house lease contract of the office and other relevant certificates ..... > >
question 2: how to apply for the qualification certificate of fire protection installation usually requires the construction department at or above the prefecture level and the fire department of the fire brigade at the prefecture level.
Requirements for applying for fire engineering qualification certificate:
1. Enterprise credit
(1) Independent enterprise legal person qualification;
(2) It has a good social reputation and corresponding economic strength. industrial and commercial registration has a capital of not less than 5 million yuan and a net asset of not less than 6 million yuan;
(3) In the past five years, he has independently undertaken at least two fire control facilities projects (design or construction or integration of design and construction) with a single building area of not more than 41,111 square meters. Among them, 2 items all contain automatic fire alarm and its linkage control system and automatic fire extinguishing system, and at least 1 item contains gas fire extinguishing system or foam fire extinguishing system or smoke prevention and exhaust system;
(4) In recent three years, the annual project settlement income is not less than 8 million yuan.
2. Technical conditions
(1) The technical person in charge of the enterprise has no less than 6 years of experience in the design and construction of fire control facilities, and has presided over the completion of no less than 2 fire control facilities projects (design or construction or integration of design and construction) with a single building area of not less than 21,111 square meters. Have the qualification of registered electrical engineer (public equipment) or the professional title of senior engineering;
(2) There shall be no less than 12 professional technicians with intermediate or above engineering titles engaged in fire control facilities engineering. Among them, no less than 1 people have at least 1 design or construction achievements of gas fire extinguishing system, no less than 1 people have at least 1 design or construction achievements of foam fire extinguishing system, no less than 1 people have at least 1 design or construction achievements of smoke prevention and smoke exhaust fire extinguishing system, no less than 2 people have at least 1 design or construction achievements of automatic sprinkler system, and no less than 2 people have at least 1 design or construction achievements of automatic fire alarm and its linkage control system;
(3) The professional configuration of the enterprise is reasonable, including no less than two professionals in electrical engineering, automation, water supply and drainage, and heating and ventilation. There shall be no less than 3 registered electrical engineers (structural engineers, public facilities) with professional qualifications or senior and above engineering titles, and no less than 3 registered construction engineers (project managers) with grade II and above.
3. Technical equipment and management level
(1) Necessary technical equipment and fixed workplace;
(2) It has a perfect quality management system and runs well. Have the management systems of technology, safety, operation, personnel, finance and archives.
Scope of business
(1) Enterprises that have obtained the qualification of fire control facilities engineering design and construction can engage in consulting, design, construction and integrated design and construction of fire control facilities projects in various construction projects, and can also undertake general contracting and project management of corresponding projects; Including:
1, automatic fire alarm and its linkage control system;
2. Automatic sprinkler system;
3. Water spray fire extinguishing system;
4. Gas fire extinguishing system;
5, foam fire extinguishing system;
6. Automatic fire extinguishing systems such as dry powder fire extinguishing systems;
7. Automatic fire control facilities for smoke control and exhaust system;
(2) Enterprises that have obtained the first-class qualification are not limited in the scale of undertaking fire control facilities projects;
(3) Enterprises that have obtained Grade II qualification can undertake fire-fighting facilities projects for civil buildings with a single building area of not more than 41,111 square meters, and factories and warehouses with a fire risk of Class C or below.
question 3: how to apply for the fire-fighting qualification certificate? There are many kinds of fire-fighting qualifications, including construction qualification and design qualification. Which one do you want to apply for? The contracting qualification of fire fighting construction specialty is reported to the Construction Committee, and the district planning committee of design is reported < P > Question 4: How to get 21 points for the fire fighting qualification certificate? The so-called fire fighting qualification is not for individuals, but for units. You don't have any nail-removing certificates to do fire fighting projects or undertake fire fighting maintenance tasks. The titles you mentioned are related to fire control, such as fire safety officer certificate and fire control room duty certificate. These certificates are useless. < P > Question 5: How to apply for the third-level qualification of fire control engineering, and what conditions are needed? In the Qualification Standard for Construction Enterprises (J.J. [2114] No.159), the professional contracting qualification of fire protection facilities engineering is divided into Grade I and Grade II.
17.2 secondary qualification standard
17.2.1 enterprise assets
net assets of more than 6 million yuan.
17.2.2 Key personnel of the enterprise
(1) There shall be no less than 3 registered construction engineers specializing in mechanical and electrical engineering.
(2) The technical person in charge has more than 8 years' experience in technical management of fire control facilities construction, and has the senior title of engineering sequence or the qualification of first-class registered construction engineer in mechanical and electrical engineering; There are not less than 6 people with intermediate or above titles in HVAC, water supply and drainage, electricity, automation and other majors, and the majors are complete.
(3) There shall be no less than 15 construction site management personnel with post certificates, and the constructors, quality engineers, safety officers, materials engineers and librarians shall be complete.
(4) There shall be no less than 21 skilled workers above intermediate level who have passed the examination or training.
(5) The technical director (or registered constructor) has presided over the completion of at least two engineering achievements required by the first-class qualification standard of this category.
question 6: in which department is the fire acceptance qualification handled? What is the standard? Fire inspection and acceptance are the responsibility of the public security fire brigade
※ Fourth, the construction unit shall provide the following materials when applying for fire inspection and acceptance (the time limit for examination and approval is 21 working days 1. Application report;
2. Application Form for Fire Control Acceptance of Building Projects (please only fill in the Fire Control Record Form for Completion Acceptance of Building Projects and affix the official seal);
3, project completion acceptance report (construction project quality completion acceptance opinion);
4. National type approval certificate, inspection report, supply certificate (original) and supply certificate of fire protection products, namely the invoice and delivery list of fire protection products;
5. Certification documents and factory certificate (original) that the building components, building materials and interior decoration materials with fire-proof performance requirements meet the national standards or industry standards;
6. Technical Inspection Report of Building Fire Protection Facilities (original certificate of fire protection facilities and electrical fire protection technology inspection);
7. Legal identity certificate and qualification grade certificate of the construction, project supervision and testing unit (copy stamped with the seal of the unit);
8. Witness sampling inspection and qualification grade certification documents of building interior decoration materials (copy stamped with unit seal);
9, a set of fire engineering completion drawings (with completion seal);
11, design, construction, change content records;
11, fire engineering construction contract, fire engineering construction team qualification certificate;
12, the original audit opinions of public security fire control institutions and relevant revision approval documents, etc.
question 7: what procedures are required to apply for fire protection qualification? Special qualification standard for fire protection facilities engineering design: I. General principles (1) The special fire protection facilities engineering in this standard refers to the automatic fire alarm and its linkage control system of various construction projects; Automatic sprinkler system, water spray fire extinguishing system, gas fire extinguishing system, foam fire extinguishing system, dry powder fire extinguishing system, fire hydrant system and other automatic fire extinguishing systems; Automatic fire control facilities such as smoke control and exhaust system. (two) the special qualification of fire protection facilities engineering design is set at two levels: A and B. Second, the standard (1) Class A 1, qualifications and reputation (1) has the qualification of an independent enterprise legal person. (2) It has a good social reputation and a registered capital of not less than RMB 3 million. (3) The enterprise has independently undertaken no less than three special engineering designs of fire-fighting facilities for civil buildings with a building scale of medium or above or industrial buildings with a fire risk of Class C or above, and all three projects contain automatic fire alarm systems and automatic fire extinguishing systems (at least 1 projects contain gas fire extinguishing systems or foam fire extinguishing systems). 2. Technical conditions (1) The professional equipment is complete and reasonable, and the major and quantity of major professional and technical personnel meet the provisions of the "List of Major Professional and Technical Personnel" in the applied special qualification standard. (2) The main technical person in charge or chief designer of the enterprise should have a college degree, have more than 11 years experience in designing fire-fighting facilities, have presided over and completed at least two designs of large-scale fire-fighting facilities with qualified quality (including automatic fire alarm system and automatic fire extinguishing system), have the title of first-class registered architect (registered electrical engineer, registered public equipment engineer) or senior engineering professional and technical title, and have obtained the certificate of fire-fighting professional training issued by provincial public security fire-fighting institutions. (3) Among the personnel specified in the main professional and technical personnel staffing table, non-registered personnel shall have intermediate or above engineering professional and technical titles, and obtain the certificate of fire professional training issued by provincial public security fire control institutions. 3. Technical equipment and management level (1) Necessary technical equipment, perfect engineering computer-aided design system and fixed workplace. (2) The enterprise management organization, standard system, quality system and file management system are sound. (2) Grade B 1. Qualifications and reputation (1) It has the qualification of an independent enterprise legal person. (2) It has a good social reputation and a registered capital of not less than RMB 1 million. 2. Technical conditions (1) The professional equipment is complete and reasonable, and the major and quantity of major professional and technical personnel meet the provisions of the "List of Major Professional and Technical Personnel" in the applied special qualification standard. (2) The main technical person in charge or chief designer of the enterprise should have a bachelor's degree or above, have more than 8 years experience in designing fire-fighting facilities, have presided over the design of large-scale fire-fighting facilities (including automatic fire alarm system and automatic fire extinguishing system) with no less than 1 items, have the title of first-class registered architect (registered electrical engineer, registered public equipment engineer) or senior engineering professional and technical title, and have obtained the certificate of fire-fighting professional training issued by provincial public security fire-fighting institutions. (3) among the personnel specified in the main professional and technical personnel staffing table, non-registered personnel shall have intermediate or above engineering professional and technical titles and obtain fire protection issued by provincial public security fire control institutions.