Unit (sub-unit) Engineering Quality Control Data Verification Record Form
The unit (sub-unit) project quality control data verification record form is a unified four-series form stipulated in the Unified Standard for Construction Quality Acceptance of Building Engineering (GB50300-200 1+0). Statistics are the scores of quality control materials, not the concepts of breakdown and division. Table G.0. 1-2 unit (sub-unit) engineering quality control data verification record project name XXXXX trade city D2# building construction unit XXXXX construction engineering co., ltd.No. project material nameNo. verification record checker 1 records of the blue prints.the design of buildings and structures, design changes and negotiation meeting requirements 4 2 engineering positioning measurement, Pay-off record 7 meets the requirements 3 raw material factory certificate and incoming inspection (test) report 55 meets the requirements 4 construction test report and witness inspection report 127 meets the requirements 5 concealed engineering acceptance record 14 meets the requirements 6 construction record 14 meets the requirements 7 prefabricated components and ready-mixed concrete certificate 0 meets the requirements 8 foundation and main structure inspection and sampling data 1 0 meets the requirements, 35 items of quality acceptance records of 9 disciplines and partial disciplines meet the requirements, 10 engineering quality accidents and accident investigation and handling data/1 new materials and new technology construction records/1 water supply and drainage and heating drawings, the blue prints.the design, design changes and negotiation records1meet the requirements, and 2 materials and materials. 3.2. The strength test and leak test records of pipelines and equipment meet the requirements; 4. The acceptance record of concealed works 10 meets the requirements; 5. The two test records of system cleaning, irrigation, water supply and ball passing meet the requirements; 6. The construction record 10 meets the requirements; 7.9. Partial project quality acceptance records meet the requirements; 1. Record of the blue prints.the design change of building electrical drawings and negotiation 1 Conforming to requirements 2 Material and equipment factory certificate and entrance inspection (test) report 9 Conforming to requirements 3 Equipment debugging record/Conforming to requirements 4 Grounding and insulation resistance test record 2 Conforming to requirements 5 Concealed engineering acceptance record 8 Conforming to requirements 6 Construction record 8 Conforming to requirements 7 Sub-item and divisional engineering quality acceptance record 1 2 Meet the requirements of the project name XXXXXX trade city D2# building construction unit XXXXXX Construction Engineering Co., Ltd.No. Project name and number of copies of verification opinions Checker 1 Records of the blue prints.the design review of ventilation and air conditioning /2 Records of ex-factory certificate and entry inspection (test) of materials and equipment /3 Records of strength test and leak test of refrigeration, air conditioning and water pipes /4 Records of acceptance of concealed works/ 5 refrigeration equipment operation and debugging record /6 ventilation and air conditioning system debugging record /7 construction record /8 sub-item and sub-item project quality acceptance record/1 elevator civil layout, the blue prints.the design, negotiation record /2 equipment factory certificate and unpacking inspection record /3 concealed project acceptance record /4 construction record /5 grounding and insulation resistance test record/6 load test, safety device inspection record /7 sub-item and sub-item project quality acceptance record. 1 as-built drawings and design description of intelligent blue prints.the design /2 factory certificates and technical documents of materials and equipment and entrance inspection (trial) report /3 concealed engineering acceptance record /4 system function determination and equipment debugging record /5 system technology, operation and maintenance manual /6 system management and operator training record/7 system inspection report /8 sub-project and sub-project quality acceptance report/conclusion: the control information of this project is complete. Chief supervision engineer: project manager of the construction unit: MM DD YY (project leader of the construction unit) MM DD YY.