The company implements ISO900 1 quality management system and has passed CE product certification. It has an academician workstation and a wholly-owned energy management company (Shandong Renault Energy Saving Investment Co., Ltd.). At present, the company has more than 0/70 employees and 68 technicians, including product research and development department, production technology department, product quality department, sales department, marketing department, customer service department and comprehensive management department. The company has gathered the best domestic experts engaged in R&D and steam turbine design for many years, as well as smart and practical young talents integrating theory and technology, and has a power station equipment installation and after-sales team that can reassure and satisfy customers.
At present, the company has developed six series of high-efficiency and energy-saving turbines, including high-temperature and ultra-high-pressure, sub-high-temperature and sub-high-pressure, medium-temperature and medium-pressure turbines, back-pressure turbines, condensing turbines, condensing turbines and pumping turbines, with single-machine capacity ranging from 0.2MW to 50MW, working steam pressure ranging from 0.3Mpa to 10Mpa and temperature ranging from saturation temperature to 535℃. Products are widely used in petroleum, chemical industry, papermaking, shipping, food, printing and dyeing, cogeneration, garbage incineration and biomass power generation, as the main power source in the field of power generation and industrial traction. The steam turbine produced by our company is based on advanced European technology, combined with more than 20 utility models and invention patents, and adopts unique modular design scheme and exquisite processing technology. The technical level of R&D and manufacturing is 30 years ahead of the domestic industry, and the internal efficiency is improved 12.
At present, the company has had successful product engineering cases in many regions, and some customers have cooperated with large-scale demonstration projects such as Shandong Hong Xin Chemical Co., Ltd., Weifang Special Steel Group Co., Ltd., shandong energy Longkou Mining Group Co., Ltd., Shandong Lian Heng Pulp Group Co., Ltd., Hong Kong Yingde Gas Group Co., Ltd., Anhui Zhongyuan Chemical Group Co., Ltd. and Dezhou Yunshi Thermal Power Large Package Project, and won high praise from customers.
The company is a key high-tech project supported by Shandong Province, with 502 mu of industrial land specially approved by the National Development and Reform Commission, Shandong Provincial Government and Weifang Municipal Government, with a total investment of 2.5 billion yuan. The project is located in Weicheng Economic Development Zone, with convenient transportation and logistics and obvious location advantages. A 250,000-square-meter large-scale fully numerical control constant-temperature processing workshop, wind tunnel test center, high-speed dynamic balance test center, steam test device, rooftop solar photovoltaic power station, comprehensive office building, research and development center, academician workstation, postdoctoral mobile station and other buildings have been built, and 365,438 sets of steam turbine production, processing, assembly and test equipment have been newly purchased.
After the completion of the project, the annual output of high-efficiency and energy-saving industrial steam turbines is 6000 MW, the annual sales income is 654.38+005 million yuan, the profit is 654.38+057.5 million yuan, and the tax paid is 866 million yuan.
The project is completed in two stages. The total investment of the first phase project is 860 million yuan, covering an area of 260 mu, and large-scale production and processing equipment and experimental testing equipment 15 1 set are added. After the first phase of the project is put into production, it can realize annual sales income of 2.7 billion yuan, profit of 465.438+0 billion yuan and tax revenue of 220 million yuan.
After the project is put into production, it will form a large-scale equipment manufacturing base with "package" functions such as system integration and production supporting services. It will promote and promote large-scale machining, casting, forging and heat treatment around Weifang, promote labor and social employment, and make full preparations for our company to develop into a listed company in the future. According to the current project construction progress and equipment procurement, it is estimated that the original factory can be relocated on 20 13 and 12.