Gas appliances access conditions
Seven companies purchasing gas appliances to implement access management, gas appliance manufacturers and distributors in addition to meeting the requirements of the bidding documents, but also must have the following conditions.
Eight gas appliance manufacturers must have the basic conditions:
, business license, institutional code certificate, tax registration certificate, etc.;
, production license;
, quality inspection above the provincial level of quality inspection agency's quality inspection certificate;
, according to the state, industry standards or other conditions that the company's bidding documents.
Nine water heaters, wall-hung boilers supply units must meet the following conditions:
, must be a first-class agent, there are manufacturers of commissioned agent certificate;
, with the qualification to independently bear civil liability, with a certain degree of economic strength;
, have a good business reputation;
, the bidding documents stipulate other conditions.
Nine water heaters, wall-hung boilers quality requirements
, product appearance, structure, a variety of signs in line with the relevant standards;
, quality and performance is stable, the trial period of users reflecting the good, the complaint rate of ‰ or less;
, by the field test, the operation of the effect is good, the indicators in line with national standards.
, must be strong exhaust or balanced.
, according to the state, industry standards or the company's bidding documents should have other conditions.
Ten after-sales service requirements for suppliers:
, insurance for the product;
, the product from the start of installation and commissioning, the quality of the problem of a free replacement within a lifetime is responsible for the maintenance;
, in the vicinity of Taiyuan have after-sales service organizations, product problems within hours to arrive at the scene and to make the treatment;
, for the Company Free training for the company's installation and maintenance technicians, can meet the daily maintenance needs.
Eleven gas stoves, water heaters, wall-hung boilers supply contracts and financial collateral requirements
, in accordance with this system and the bidding management approach to the relevant requirements of the supply agreement.
, wall-hung boilers for the trial period of two heating seasons, the trial period in addition to retaining the quality of ten thousand yuan deposit, the rest of the payment according to the contract in batches, the warranty % in a payment; if the supplier is a successive winners of the bidding system, to retain the ten thousand yuan performance bond has been extended to the termination of the supply. After the termination of supply, according to not reach the end of the wall-hung boiler payment of % withholding warranty, until the wall-hung boiler to reach the end of the conditions.
, the water heater does not have a trial period, the warranty deposit by % after a payment, if the Department of successive bids, retaining the performance deposit of ten thousand yuan, after the termination of cooperation returned.
There is no trial period for gas stoves, and the warranty is paid at a rate of % after one, and if the bid is awarded consecutively, the performance deposit of 10,000 yuan will be retained and returned after the termination of the cooperation.
Three chapters of the sales of gas appliances, installation
Twelve companies in the business network distribution of a variety of civil gas stoves, water heaters, wall-hung boilers and gas appliances spare parts, gas appliances, the distribution of independent accounting, distribution revenue should be included in the relevant department performance assessment.
Article XIII of the user according to the actual needs of the company's business outlets to buy a variety of models of gas stoves, water heaters, wall-hung boilers and other products, the company is responsible for the installation and commissioning and after-sales service
.