7 project application templates

Project application template 1

Project name: fish culture in Xiaoluanhe River

Applicant: Chen Guangjun

Construction location: Gangoukou Village, Xilongtou Township

Project leader: Chen Guangjun

Project investment scale: 511,111 yuan

Declarer: Chen Guangjun

. This situation

My hometown is located in Gangoukou Village, Xilongtou Township, with good climatic conditions, surrounded by mountains, pleasant air without any pollution, abundant rain and good vegetation. It is a good place to develop animal husbandry and aquatic products. With the support of the national policy of vigorously developing family green aquaculture, combined with the current market environment in which animal husbandry and aquatic products in neighboring counties and cities are in short supply, and can promote the economic development of the village, I want to start investing in the construction of family green three-dimensional agricultural farms in the lower reaches of Xiaoluanhe River in Mulan paddock in our county in 21xx. I plan to build three fish ponds to cultivate rare fish species (such as loach, Chinese roe fish, Westwood fish, etc.) in Luanhe River in Mulan paddock, so as to drive the development of aquaculture in the whole village and decide to declare breeding projects.

2. Necessity and feasibility of project construction

1. The farm is built in Gangoukou Village, Xilongtou Township, with abundant water resources and good climatic conditions. It can develop and cultivate rare fish species in Luanhe River in Mulan paddock, build duck houses and goose houses around it, and raise ducks and geese on the water surface, so as to develop circular economy in rural areas. Especially with the improvement of people's living standards, people's demand for aquatic products is getting higher and higher, especially high-quality characteristic aquatic products (such as loach, Chinese roe fish, Westwood fish, etc.) are increasingly favored by people, and there is a great demand in domestic and international markets. Therefore, the prospect of developing characteristic aquaculture is very broad.

2. The economic and social benefits are considerable. The project can not only drive the villagers to develop vigorously, but also play a leading role in demonstration, drive the surrounding people to develop goose-raising, goose-raising and other aquaculture to achieve large-scale and centralized development, and drive the villagers to become rich and run a well-off life together.

Third, the project construction scale and investment estimate (pre-calculation)

Using the existing resources, three fish ponds were excavated in the early stage to raise loach, Chinese roe fish, Westwood fish, etc., and can also be used to raise ducks and geese. In the later period, additional investment will be made according to the breeding situation.

IV. Implementation Plan and Benefit Analysis

The project application was declared in March of 21xx, and the initial construction began in May of 21xx.

after the completion of the project, individual farming will be used to drive the surrounding people to develop aquaculture such as raising ducks and geese, and comprehensive farming will be vigorously developed to drive farmers out of poverty and become rich as soon as possible.

template of project application 2

1. What is a project application report

A project application report is a project demonstration report submitted according to the approval requirements when an enterprise invests in a project that should be reported to the government for approval, in order to obtain the administrative permission of the project approval authority for the proposed project. When compiling the project application report, the proposed project should be comprehensively demonstrated in terms of planning and layout, resource utilization, land acquisition and resettlement, ecological environment, economic and social impact, etc. according to the requirements of government management, so as to provide a basis for the relevant departments to approve enterprise investment projects. As for the market prospects, economic benefits, sources of funds, product technical solutions and other contents of the project, it is unnecessary to make detailed analysis and demonstration in the project application report.

2. The origin of the project application report

? The State Council's Decision on Investment System Reform: For projects that enterprises do not use government investment, the approval system will no longer be implemented, and the approval system and filing system will be implemented according to different situations. Among them, the government only approves major projects and restricted projects from the perspective of safeguarding the interests of the public, and other projects, regardless of their scale, are changed to filing system.

summary: enterprise investment projects: approval system: major projects and restricted projects (Catalogue of Investment Projects Approved by the Government) submit project application reports to the government. Filing system: The specific implementation measures of filing system shall be formulated by the provincial people's government.

3. The nature and research ideas of the project application report

According to the requirements of the investment system reform, the government no longer approves the feasibility study report of the enterprise investment project, and the market prospect, economic benefit, capital source and product technical scheme of the project are all decided by the enterprise independently. The project application report is a project demonstration report submitted by an enterprise according to the approval requirements in order to obtain the administrative license of the proposed project from the project approval authority when investing in a project that should be approved by the government. The project application report should focus on the externality and publicity of the project, including maintaining economic security, rationally developing and utilizing resources, protecting ecological environment, optimizing major layout, safeguarding public interests, and preventing monopoly.

4. main points of compiling project application report

the project application report should focus on the externality and publicity of the project, including maintaining economic security, rationally developing and utilizing resources, protecting ecological environment, optimizing major layout, safeguarding public interests and preventing monopoly. When compiling the project application report, the proposed project should be comprehensively demonstrated in terms of planning and layout, resource utilization, land acquisition and resettlement, ecological environment, economic and social impact, etc. according to the requirements of government management, so as to provide a basis for the relevant departments to approve enterprise investment projects. As for the market prospects, economic benefits, sources of funds, product technical solutions and other contents of the project, it is unnecessary to make detailed analysis and demonstration in the project application report.

Project application template 3

County Spiritual Civilization Office: In order to further improve the quality, civilization level, modern management level and social environment of community citizens and realize the goal of creating a civilized community, in recent years, Xianfeng Mountain Community in Xianfeng Miao Township has strengthened its own organizational construction, giving full play to the role of grassroots mass autonomous organizations in self-management, self-education and self-service. Under the new system, it has established the township as the core. Based on neighborhood committees, civilized communities with various organs, enterprises and institutions within the jurisdiction as the main components have established organizations, formed various working systems, carried out colorful activities in various situations, and achieved good results:

1. Civilized community environment

Xianfengshan community has a comprehensive law enforcement team with good personnel quality and strict law enforcement. After comprehensive management of urban and rural environment, more than 311 shops and 71 stalls have been unified, and more than 1,111 meters of streets have been afforested. The exterior walls of all houses in the area are whitewashed, and the appearance of the buildings is clean and tidy, with no "five chaos" and "seven chaos" phenomena. The sanitation facilities are complete and in good condition, all reaching the standards of "511 thousand demonstration projects".

2. Community order is stable

The public security situation is good, the "four prevention" measures are implemented, the comprehensive social management measures are strong, the civil dispute mediation network is sound, the fire prevention facilities are complete, and the institutional measures are strong. The legitimate rights and interests of teenagers, women, children and the elderly are protected, and residents are satisfied with the public security situation.

Third, the community organization is sound

There is a party branch and a neighborhood committee in the community, which can play a good role as a fighting fortress and give full play to the role of grass-roots organizations. All units actively participate in the creation of civilized communities and actively manage the floating population. A team of cleaning staff, emergency teams, civilized persuasion teams and young volunteers have been set up.

IV. Community * * * Construction generally

Pay attention to talents, extensively carry out "school street * * * construction, military and civilian * * * construction, police and people * * * construction", etc., focus on ideological * * * construction, and enhance the sense of identity of * * * construction units to the community.

5. Convenient community services

The production and living facilities in the area are complete, the service network layout is reasonable, schools and hospitals are complete, and water, electricity and fuel are convenient. Regularly carry out caring and helping activities.

VI. Popularization of community education

The organization is sound, the system is perfect, the organization is sound, the education team is strong, and the work can be carried out in a targeted, planned and step-by-step manner. The educational network is perfect and the activities are fruitful.

VII. Rich community culture

Cultural sites meet the standards, and community residents can be regularly organized to carry out activities, with a civilized, healthy and fruitful lifestyle.

VIII. Good community customs

Carry out public welfare activities extensively, standardize industry services, be civilized in social customs, implement activities, and have harmonious interpersonal relationships.

after research and decision by the Party committee and government of Xianfeng Miao Township, it is proposed to recommend our Xianfengshan community to declare as a civilized community in the county.

I hereby apply, and hope to be approved!

Xianfengshan Community Residents Committee

21xx April 1

Project application template 4

In order to create a new commercial highlight in xx city, the company plans to develop and build a shopping center integrating shopping, modern catering, leisure and entertainment at the southwest corner of the intersection of xx Road and xx Road in xx District, xx city (the original location of xxx unit).

I. Project scale

The construction land area of the project is 2.14ha, and the required construction area is about 78111m. Among them, the underground construction area is about 13611m, and the above-ground construction area is about 64411m m.

second, the necessity of project construction

in the development goal of "xx" in xx city, it is pointed out that agglomeration and upgrading should be highlighted to prosper and expand the service industry. Continue to focus on the goal of building the "Yellow River Delta Central Business District" and promote the sustained and rapid development of the service industry. According to the "xx" service industry development plan, we will do a good job in the construction of 8 key parks, 51 key enterprises and 311 key projects. .

The original site of the original xxx unit is located in the center of the commercial cluster of xx Road, but its old buildings and simple supporting facilities can no longer meet the development needs of the gold commercial circle. In order to create another bright spot in xx business circle, it is planned to build a shopping center with the largest scale in xx city, integrating shopping, modern catering, leisure and entertainment.

III. Brief introduction of project functions

1. This project has two underground floors by default. The internationally renowned brand supermarket is located in the basement, with a required construction area of about 5xxm; m; There is a parking lot on the second floor underground, and the required construction area is about 84111m.

2. Pre-set high-end brand stores above the ground, and introduce internationally famous high-end brand clothes, shoes and hats and high-end consumer goods. The required construction area is about 11411m m..

3. A diversified entertainment and leisure center is preset above the brand store, and the fitness club, beauty club and film and television city of the International Royal Club are introduced, which requires a construction area of about 8111m.

4. The international standard characteristic dining center is preset above the entertainment and leisure center, and the required construction area is about 6111m.

5. High-grade apartments are preset above the dining center to solve the problem of guests' rest and residence.

6. High-grade office buildings are preset above the apartments to meet the office needs of merchants and foreign enterprises in the shopping center, with the required construction area of 28111m m.

IV. Conclusion

The development conditions of this project are ripe, and its operation will be conducive to enriching the leisure and entertainment life of people in xx city. It is conducive to promoting the economic development of xx District in xx City. Market analysis shows that the site selection of this project can provide customers with convenient above-ground and underground parking services.

to sum up, the construction of this project is both necessary and feasible. As long as it operates scientifically and standardly, it is guaranteed that the project will achieve the expected goal.

Applicant:

Date:

Template of project application 5

I. Energy consumption standards and energy-saving specifications.

explain the national and local standards for rational energy use and energy-saving design specifications followed by the proposed project.

second, energy consumption status and energy consumption index analysis.

describe the energy supply situation where the project is located, and analyze the types and quantities of energy consumption of the proposed project. According to the characteristics of the project, various energy consumption indicators are selected and calculated, compared with the international and domestic advanced levels, and whether it meets the requirements of energy access standards is expounded.

third, energy-saving measures and energy-saving effect analysis.

this paper expounds the main energy-saving and consumption-reducing measures adopted by the proposed project in order to optimize the energy consumption structure and meet the relevant technical policies and design standards, and analyzes and demonstrates the energy-saving effect.

Analysis of construction land, land requisition, demolition and resettlement

I. Project site selection and land use scheme.

including the project construction site, area, land use status, cultivated land occupation status and other information. Analyze whether the site selection of the project will cause related adverse effects, such as whether it will overburden mineral deposits and cultural relics, whether it will be conducive to flood control and waterlogging prevention, and whether it will affect navigation and military facilities.

second, the rationality analysis of land use.

analyze whether the proposed project meets the requirements of land use planning, whether the scale of land occupation is reasonable, whether it meets the requirements of collective contract and effective land use, and whether the supplementary scheme of cultivated land occupation is feasible.

third, land acquisition, demolition and resettlement planning scheme.

investigate and analyze the impact of land acquisition and demolition of the proposed project, put forward the principle, scope and method of demolition compensation according to law, formulate the resettlement planning scheme, and analyze and demonstrate whether it meets the requirements of safeguarding the legitimate rights and interests of immigrants and meeting the needs of their survival and development.

Environmental and ecological impact analysis

I. Environmental and ecological status quo.

includes the natural environmental conditions, existing pollutants, ecological environmental conditions and environmental capacity of the project site.

second, the ecological environment impact analysis.

includes the types of pollutants discharged, the analysis of the discharge status, the prediction of soil erosion, the influencing factors and degree on the ecological environment, and the comprehensive impact on the environment and ecosystem in the river basin and region.

third, ecological environment protection measures.

according to the requirements of policies and regulations on environmental protection and soil and water sustainability, the possible factors and degrees of influence on the ecological environment are analyzed and demonstrated, and the feasibility and effect of the control scheme are analyzed and demonstrated.

fourth, address disaster impact analysis.

for projects built in geological disaster-prone areas and projects that are prone to geological disasters, it is necessary to describe the geological disaster situation where the project is built, analyze the risk of geological disasters induced by the proposed project, and put forward defensive countermeasures and measures.

v. special environmental impact.

analyze the possible adverse effects of the proposed project on historical and cultural heritage, natural heritage, scenic spots and natural landscapes, and put forward protection measures.

economic impact analysis

1. economic cost benefit or cost effect analysis.

from the perspective of optimal allocation of social resources, the economic rationality of the proposed project is evaluated through economic cost benefit or cost effect analysis.

second, industry impact analysis.

explain the basic status of the industry and the position of enterprises in the industry, analyze the impact of the proposed project on the development of the industry and related industries, and demonstrate whether it may lead to monopoly.

third, the regional economic impact analysis.

projects that may have a significant impact on the regional economy should be analyzed and demonstrated from the perspectives of regional economic development, industrial spatial layout, local fiscal revenue, social income distribution and market competition structure.

fourth, macroeconomic impact analysis.

the macro-economic impact analysis should be carried out for projects with huge investment scale and significant impact on the national economy. Projects involving national economic security,