Fan Monthly Supervision Work Summary and Supervision Work Summary
In May, the county labor supervision bureau supervised 30 key projects, 23 "three-looking and three-comparing" projects and the sewage pipe network project of the eastern line of surrounding counties in the second quarter of Dagan. At the same time, the work of the stage center and the handling of netizens' messages were supervised and audited. * * * Went out of the inspection site for 80 times, compiled and distributed 5 issues of Inspection Express and 6 issues of Whole Pepper Inspection, put forward 26 work suggestions, handled 1 1 messages from online users in Zhongan, and handled 26 messages from county party committee secretaries and county heads; Making two issues of "Focus" column of county-level TV stations; Four issues of Focus on Supervision were compiled and distributed in Quanjiao Daily.
First, focus on supervision and accelerate key projects.
Since May, the county supervision bureau has followed up and supervised the progress of 30 key projects identified by the county party committee and government. By the end of May, seven of the 22 projects had made rapid progress. 85% of the relocated households in the East Triangle Garden (Phase III) reconstruction project have moved; The land requisition and demolition of the first phase of the flood control project through the city of Xianghe has been basically completed, and the earthwork has started in an all-round way; The road construction of Coral Landscape Avenue has completed the total engineering quantity10%; The site selection, planning and design scheme of standardized workshop, staff apartment and science and technology innovation center in the development zone have been determined, subgrade engineering construction is under way in Jingsi Road, and the bill of quantities and bidding documents of Jingyi Road and Wei Wu Road have been compiled; Lianhua synthesis workshop, office and other main projects and supporting projects such as electricity and water have basically ended, and some equipment has been installed; Ruixiang Hotel and Shanda Decoration City are advancing rapidly in turn.
In May, the county supervision bureau supervised the development of the "May Investment Surprise Month" activity. The county investment promotion headquarters has formulated the "Action Plan for Organizing Investment Promotion in the County in Summer", and implemented "weekly inspection, semi-monthly notification and January dispatch" for key projects to coordinate and solve problems in time to ensure the smooth landing and quick start of projects.
On May 8, the 5000-ton clinker line and two mills of the first phase of Quanjiao Conch Project with a total investment of 654.38+0.5 billion yuan were ignited; Bojue Clothing with a total investment of 200 million yuan was officially started. On June 5438+00, Shenglei Technology with a total investment of 220 million yuan was officially put into production. By the end of May, the county had sorted out 9 key projects supported by county leaders/KLOC-0 and 38 key tracking projects. The county has signed 10 projects with a total investment of 456 million yuan, including 2 projects with a total investment of over 100 million yuan; 0/8 projects started/kloc-with a total investment of 970 million yuan, including 3 projects with a total investment of over 100 million yuan; There are 13 projects put into operation, with a total investment of19140,000 yuan, of which 2 projects are over 100 million yuan.
In May, the County Supervision Bureau supervised the progress of livelihood projects, and tracked and supervised the implementation of the rectification of livelihood projects. This year, our county * * * implemented 36 provincial and municipal livelihood projects, with a planned investment of 200.03 million yuan, and 96.44 million yuan has been put in place. On May 8th, the civil engineering inspection team conducted a comprehensive inspection of the livelihood project construction training 18 project in our county, and the implementation units of civil affairs, water conservancy, health and other 13 projects quickly implemented the rectification measures according to the problems found in the inspection. By the end of May, 27 problems pointed out by the municipal inspection team had been rectified 17 and were being rectified 10. The skills training of new migrant workers exceeded the scheduled tasks; Village clinics have been built 17, of which 15 have been started; The expansion of Dashu Town Nursing Home was completed, and the main parts of Xianghe and Erlangkou Town Nursing Home were completed; Large and medium-sized biogas projects and service outlets have been selected, and 148 biogas digesters have been started; Of the 53 large and medium-sized reservoir resettlement support projects, 44 have completed the rural cleaning projects in Guhe and Erlangkou Town, standardized the design of "one book and four maps", and completed the site selection, design and land acquisition of garbage transfer stations.
In May, the county supervision bureau sent personnel to the site of the demolition project to continuously supervise the construction progress of the sewage pipe network and the demolition and resettlement work on the East Line. 5。 The sewage pipe network laying project on the 2 km east line of the city starts from Zhanqian Road in the south, passes through the extension of Zhandong Road, s206 and Gangkou Road, and reaches the drainage station, with a land requisition of 450 mu. In order to fully guarantee the progress of project demolition and construction, the county party committee and county government set up the headquarters for the construction of sewage supporting pipe network on the east line of the city, which consists of land acquisition group, demolition group, construction group and office. From May 20, 26 working groups composed of 24 county-level units and more than 200 government officials from Xianghe and Shizi Town entered the demolition site to fully carry out the demolition work.
As of May 26th, 60% of the 179 relocated households involved in the construction of the sewage pipe network on the east line of the city have signed an agreement and 77% have completed the house selection. On the 23rd, the working group of the county tendering bureau took the lead in completing the task of demolition and resettlement.
The second is to track and supervise and promote the implementation of phased work.
In late May, the County Supervision Bureau supervised and supervised the progress of the 2 1 "Three Views and Three Comparisons" project that was still being promoted. 13 of the proposed projects in the first half of the year, 10 made rapid progress. Ruixiang Hotel 2 1 1 Pile foundation concrete has been poured; Aokang Pedestrian Street has completed 85% of the total project; The main body of 7 buildings in Shanda Decoration City has been capped, and the two-story concrete pouring of 5 buildings has been completed; The main project of Nanping farmers' market has been capped, and the high-rise has been built to seven floors; The main body of the first phase of Lianhua Villa was completed, and the second phase 10 building has been built to the fourth floor; The internal and external wall painting, water and electricity pipe network and water supply and drainage works of the first phase resettlement house in Shulong New Village have been completed, and fitness equipment is being installed in the farmers' cultural square; The first to fourth floors of the first phase facade of Xingcheng Garden have been completed, and the foundations of seven commercial and residential buildings have all ended. The 10 project, such as Earl Hotel, Sewage Treatment Plant, etc., was identified as the "three-look, three-compare" project in the first half of the year. Of the eight projects put forward in the second half of the year, six have made rapid progress. The second phase of Hualong Animal Husbandry is coming to an end; 70% of the roads in Furun Poultry Factory have been poured; Huaming technology assembly painting workshop has completed the steel structure hanging beam; Lianhua materials and equipment installation is nearing completion; Tianhe machinery main and auxiliary workshops, roads, pipe networks and other supporting facilities have been completed, and various types of equipment are being installed.
In May, County Supervision Bureau _ _ County Agriculture Committee and Agricultural Machinery Bureau supervised the prevention and control of wheat scab and the construction of "ecological granary". County Agricultural Committee actively organized professional and technical personnel to go deep into towns, timely monitored the growth of wheat fields and the occurrence of scab, and timely communicated the prevention and control requirements to towns by using information platform. Towns strengthen publicity by training instead of training and going deep into farmers, and organize the prevention and control of wheat scab. County * * * implementation of rice core demonstration area128,000 mu, including 20 mu of high-yield research field; Towns have implemented more than 500 mu of demonstration films of machine transplanting, and completed the task of purchasing rice transplanters ahead of schedule; Machang, Shizi and Liuzhen have implemented a core demonstration area of 10,000 mu of high-quality rice and established 200 mu of high-yield research fields; Wugang, Shi Pei and other towns give full play to the role of local leading agricultural enterprises, and actively guide farmers to sign grain purchase and sale contracts with enterprises.
At the beginning of May, the County Supervision Bureau and the Family Planning Commission conducted a special inspection on the development of the "100-day attack" activities of family planning in the county. After the county-wide family planning work conference and situation analysis meeting, towns quickly formulated plans, set up leading groups and steering groups to strengthen implementation in view of the weak links in family planning work, especially the problems of missed inspection, four operations and the traceability of "two non-"cases. Since the "100-day attack" campaign, 3,290 people have not taken the exam, 85 cases are short of four operations, and 52 cases are from the "two evils". The "two non-"cases broke through 10 and 20 cases, and the information collection of the county's informatization construction was fully completed.
Summary of monthly supervision work of supervision model
Since September, the county work supervision bureau has supervised the key work of the county, the construction of soft environment, the handling of social hot issues and the implementation of decisions made by the county party Committee and county government meetings. * * * Went out of the inspection site for 97 times, issued 76 assigned orders, compiled 26 inspection express reports and 7 whole pepper inspections, sent 2 inspection short messages and put forward 49 work suggestions, which effectively promoted the implementation of the work.
First, the completion of key work
(1) The progress of livelihood projects has been accelerated.
Complete rural road coverage, drinking water safety projects and other construction projects 108; 6 1 projects, such as nursing homes, township cultural stations, reinforcement of small type II reservoirs, and low-rent housing in Rulin Xiyuan, have been started one after another before September 15. Mmds, direct broadcast satellite, farmer's bookstore, etc. in the radio and television village-to-village communication project will be organized and implemented after the equipment, equipment and books uniformly purchased by the superior are in place.
(2) The project of expanding domestic demand was launched in an all-round way.
As of September 20, 24 projects, including rural roads and villages, have been basically completed; 1 1 projects such as sewage treatment plant and supporting pipe network engineering have entered the drying stage, and the main works of some projects are coming to an end; Six projects, including comprehensive cultural station and veterinary station, have started; The low-rent housing project of Rulin Xiyuan, which is composed of six projects, such as Tang Chuan Community Low-rent Housing and Chengnan New District Low-rent Housing, has completed the preparatory work before construction and the foundation excavation of three low-rent housing projects. The large biogas digester project of Dano Dairy has been completed.
(3) The progress of urban construction projects is different.
As of September 24th, the subgrade of Naner Road, Nansan Road and Ruxue Road is being leveled, and the subgrade project of Nansi Road is basically completed. The west line pipe network project of sewage treatment plant is coming to an end, the lifting pump station is under construction, the main project of oxidation ditch and the construction of a secondary sedimentation tank have been completed, and the coarse grid and fine grid templates have been removed successively; At the end of September, the civil works in the factory area ended. The illegal buildings involved in the Wan Li Road construction project have not been demolished.
(4) The replacement of construction land has been fully completed.
20__, county * * * organized 9 batches of construction land replacement projects, with a total land area of 3940. 12 mu. Up to now, the county has demolished 2 10 1 household with 246,200 m2 of houses, accounting for 97.68% of the tasks to be demolished. 2689.5 mu of land has been reclaimed, accounting for 68.27% of the tasks to be reclaimed; The project fund has been allocated 5.5 million yuan1.1.06 million yuan. Dashu Town has fully completed the reclamation task, and the reclamation progress of Lion Town, Liuzhen Town, Erlang Town and Wang Xi Town has been completed by more than 95% respectively.
Second, the progress of the work of the phased center
(1) The H1N1 prevention and control mechanism is in place.
On September 5th, according to the prevention and control situation of influenza A (h 1n 1) after the school started in autumn, the county government quickly launched an emergency plan, and established the prevention and control headquarters of influenza A (h 1n 1) with the main leaders of the county party committee and county government as political commissar and commander, and the main leaders of relevant departments as members. Under the effective deployment and unified command of the prevention and control headquarters, the prevention and control mechanism of graded responsibility and joint prevention and control in the county has been rapidly established and continuously improved, and the awareness of preventing and controlling influenza A1N1influenza in the whole society has been generally enhanced. On September 12, the first batch of hospitalized patients with fever were cured and discharged, and the first batch of close contacts of home medical observation were successfully released from medical observation. On September 29th, our county held a simulation exercise of influenza A prevention and control, which further improved the emergency prevention and control capability.
(2) The "100-day sprint" of family planning has entered the decisive battle stage.
Towns comprehensively carried out centralized statistical information cleaning, implemented four surgical tasks, and accelerated the construction of town and village offices. Cross Town, Guhe Town and Wang Xi Town strictly investigate the problems found in the inspection, and honor the rewards and punishments. Shi Pei Town timely informed the villages of the progress of the operation and the progress of cleaning; Family planning cadres in Dashu Town leave the team during the day to guide the statistical business of each village, and work overtime at night to check and improve indoor software materials; In view of the problems existing in the villages in the information cleaning in August, Liuzhen Town also invested funds to further improve the supporting facilities of the villages in the town to ensure that they meet the inspection requirements.
(3) Positive enthusiasm for project preparation.
All relevant units seized the opportunity of the "Centralized Approval Month" of the province's projects in September, carefully planned and actively declared. As of September 10, 28 units have planned and compiled 296 projects. The project of county environmental protection bureau and science and technology bureau 16 has been reported to relevant state departments.
(4) The greening project of Chuquan Railway has been basically completed.
On September 1 1, the greening project of Chuquan Road with a total length of 34 kilometers was fully launched. Chuquan Railway Construction Headquarters divided the greening project into 10 bid section, and transferred 39 government cadres and technicians from county-level units to actively organize and coordinate, and urged the construction units to standardize operations, speed up the progress, and check the quality and specifications of seedlings. By September 30th, 75% of the project progress had been completed.
(five) to ensure that the 60th anniversary of the National Day is happy and peaceful, and all work is solidly promoted.
On the eve of the National Day, all towns and counties directly under the municipal government carefully sorted out the accumulated cases of key letters and visits and strictly implemented the responsibility of maintaining stability and ensuring safety. The county street lamp management office repaired the damaged street lamp in Quanjiao section of Chuquan Road overnight. The Propaganda Department of the county organized special cultural performances such as "Walking with the Motherland" and "long live the motherland", and a series of activities such as "Wonderful Pepper" painting and calligraphy, photography and bonsai exhibition to welcome the 60th anniversary of the National Day were carried out in an orderly and solid manner, which ensured the social peace and stability of the county during the 60th anniversary of the National Day and the Mid-Autumn Festival.
Three. Implementation of the established policy of soft environment construction
The administrative service center "1234" project was effectively implemented. The 19 administrative fees and 9 operational fees involved in capital construction projects will all be included in the central charging window for centralized collection by the end of August. The central charge amount reached 26 18 pieces, and the "one meter system" charge exceeded RMB _ _. The administrative service center has basically achieved "two centralization and two in place". Except for the special projects approved by the county government, all projects involving administrative examination and approval and administrative services enter the center, and the special seal for administrative examination and approval is enabled in each window, and the authorization is in place. Each window unit has achieved a "one-third reduction" in administrative examination and approval items, examination and approval time limit and links, and the comprehensive handling rate of the hall has always remained above 99%, that is, the handling ratio has increased by 30% compared with the same period of last year, achieving "zero" complaints. The construction of the four platforms is running well. At present, the information input and release of the main units of government affairs disclosure has entered the normal state, and the three-level service platform of county, town and village has been basically established.
Four. Following the decision of the regular meeting of the county party committee and the meeting of the county government in September, 27 key tasks identified by the regular meeting of the county party committee have been completed 10, and 15 tasks are being carried out according to the time schedule. Due to the adjustment of design scheme, the overall urban planning and the greening project of Quanjiao section of Chuquan Railway have not yet been approved. Nine items of 15 decided by the county government meeting have been completed, and the overall digital conversion of cable TV has not been clearly answered by the superior, and the implementation plan has not yet been drawn up; Four items that need to be issued by the government are being examined and approved by the county government office.
Verb (abbreviation for verb) implementation and feedback
In view of the problems existing in the "100-day sprint" of family planning, such as cleaning up statistical information, implementing four actions, and building towns and villages together, towns quickly implemented rectification measures. The leaders of Guhe Town and Wang Xi Town led the team to supervise and guide the quality requirements of information registration village by village, and severely dealt with the off-the-job cadres; Some irresponsible contractors in the cleanup of informed criticism in Xianghe Town were ordered to clean up again and speed up the community cleanup. Guhe, Dashu, Xianghe and other towns have adopted various methods, such as meeting scheduling, rearranging, reporting progress, economic punishment, etc., and improved the rate of four operations in place. In Wugang town, for those who can't be ligated due to contraindications, Sheung Wan surgery should be performed first. Xianghe Town and Wang Xi Town accelerated the progress of the interior decoration project of the family planning service center, and the Longshan village room has started construction, and the Qianfo 'an village room has been rectified as required.
County Construction Bureau timely rectified the quality problems of port road, held a special meeting on September 23rd, and entrusted Anhui Construction Engineering Quality Supervision and Monitoring Station to test the quality problems of port road.
Suggestions of intransitive verbs for the next step
The season has entered the fourth quarter, more than half a year, and all the work has entered the final sprint and year-end inventory stage.
(a) to speed up the construction of the project, to ensure acceptance.
Urban construction, people's livelihood projects, projects to expand domestic demand and other key projects related to the overall development and people's livelihood are about to enter the stage of completion and acceptance. All competent departments and responsible units should establish a global awareness, work backwards, speed up the progress, conscientiously perform their duties, and ensure that the construction period and quality are "double qualified" in the evaluation of provinces and cities.
(2) Pay more attention to planning and solidly promote the replacement of construction land.
As a long-term systematic project, all towns and relevant departments should comprehensively sum up the good experiences and practices in the replacement of construction land, coordinate all factors, give full play to the "village-oriented" working mechanism, focus on the long-term, unified planning and comprehensive support, and solidly promote the process of new rural construction and urban integration.
(3) Plan the declared projects in advance and actively strive for them. The fourth section is the key to declare and strive for the superior project plan. All levels and departments should seize the opportunity, plan ahead, and actively prepare for the project declaration, so as to lay a solid foundation for the effective development of all work in the coming year.
Monthly Work Summary of Supervision and Fan Wensan of Supervision
Since 65438+ 10, the county work supervision bureau has supervised and supervised the county's key work, phased center work and social hot issues. Around doing a good job in the fourth quarter, celebrating the 60th anniversary of the founding of the People's Republic of China, and preparing for the second China Farmers' Song Festival. Focus on improving work level and strengthening team building; Efforts should be made to broaden working ideas and strengthen publicity and foreign exchanges. * * * Visited the inspection site for 28 times, issued 23 orders, compiled and distributed Inspection Express 10, 5 issues of Quanjiao Inspection, put forward work suggestions 17, and compiled and distributed 4 issues of Focus Inspection in Quanjiao Daily.
First, increase the density of supervision and promote the implementation of the work.
According to the work report of the National Committee and the work report of the National People's Congress at the beginning of the year, the County Supervision Bureau sorts out and tracks the progress of key economic and social projects, key investment projects, people's livelihood projects and projects to expand domestic demand in the county, and informs the progress; Supervised the instructions of the leaders of the county party Committee and county government, the phased central work and the decisions of special meetings, which effectively promoted the implementation of various key tasks.
(1) Progress of key work
Key economic and social projects have been steadily advanced. Among the 52 key economic and social projects, there are 34 engineering projects. Six projects, including the reconstruction of Chuquan Road (Quanjiao Section), the reconstruction of county and township roads, the emergency reinforcement of the Chuhe River, and the Baijia farmer's bookstore, were completed ahead of schedule. The *** 19 projects being implemented, such as the regulation of the Chuhe River and the construction of the standard dike of the Chuhe River, have entered the low water stage; Land consolidation and comprehensive management of inland river dikes have been fully launched; The task of demolition and reclamation of 9 batches of land replacement projects was basically completed; The main project of low-rent housing construction in Wang Cao Xincun has been completed, and the Rulin Xiyuan has started; 88.9% of the rural highway "village to village" project has been completed; Key urban construction projects such as sewage treatment plants and supporting pipe networks and port roads are being promoted; Nine projects, including county museum and Xianghe management, have not yet started, and eight of them have compiled plans and reported them to relevant provincial departments. Social development projects 18, and 7 projects have been implemented. The layout of urban and rural education has been adjusted, the bidding administration and the bidding center have been established and effectively operated, and the county has transferred 6,543,800 mu of land. The construction of ecological granaries has achieved remarkable results, the construction of administrative service centers has been further strengthened, and the convenience service mechanism has been further improved. Scientific Outlook on Development 1 1 projects, such as learning and practice activities and soft environment construction, are being further promoted.
Investment promotion projects were accelerated. Among the 80 key investment projects identified at the beginning of the year, Xinlianxin Head, Deyida Aluminum and other 10 projects have been completed and put into operation, 23 projects such as Kanglilai Clothing and Shuangyou Logistics are under construction, 4 projects such as Tiantong Technology have been registered, and 26 projects such as Haifei Biotechnology are still actively in contact. Wittmann Vibration and other 13 projects were cancelled for various reasons. In the city's "Project Construction Centralized Assault Month" activity, Huaming Machinery and Shanda Decoration City started construction in our county 12 on June 29th, with a total investment of10.24 billion yuan. Urge new energy vehicle production and other 12 projects to rank second.
The project of expanding domestic demand is progressing in an orderly manner. Among the 37 projects to expand domestic demand, 28 projects, including 4 rural roads "connecting every village" project, farmers' physical fitness project, emergency reinforcement project of Chuhe levee, 3 township hospitals and 4 village clinics, have been fully completed; Nine projects, including township veterinary station, low-rent housing in Rulin Xiyuan and reinforcement of medium-sized reservoirs, are under construction.
People's livelihood projects have been comprehensively promoted. Among the 28 provincial livelihood projects, 17 is a non-engineering project, and the 1 1 project is progressing smoothly according to the time schedule. Rehabilitation projects for poor cataract patients, basic living security for retirees of uninsured collective enterprises in cities and towns, and basic medical security for urban residents exceeded the targets and tasks assigned by provinces and cities; 1 1 Among the engineering projects, six projects, such as township comprehensive cultural station and rural drinking water safety project, have been completed, and five projects, such as the reinforcement project of dangerous reservoirs, are being solidly promoted.
(B) the implementation of the stage center work
Water conservancy construction started rapidly. The key points of water conservancy construction this winter and next spring include urban defense projects, inland river regulation, reservoir reinforcement, river expansion and dam construction. The total earthwork is 4 million cubic meters. The total length is 20. The bidding for the treatment project of the East River of the 08km Tuqiao has been completed, and the treatment work has been fully started. Among them, the emergency reinforcement project of Chuhe River has been completed. The construction of the Chuhe River and the standard embankment of the inland river, the section from Laoba to Wang Ying, the Xiedaqiao Gate, the Shegongmen Gate and Zhouzhuang Power Station has been completed, the comprehensive management of the Buji section of the Chuhe River and the inland river embankment has been started, and some projects have entered the stage of dry embankment.
The autumn sowing work has been solidly promoted. 10 10/27 On October, the county party committee and government held a site meeting in Erlangkou town to concentrate on the scheduling, mobilization and redeployment of autumn sowing. After the meeting, relevant towns took active actions to comprehensively promote the autumn sowing work. Xianghe Town clearly assigned a special person to be responsible for organizing large-scale rotary cultivators in key areas of Wanzhuang Great Lake, Babao Lake and Xinlong River, and launching mass assault operations; Cross Town invested more than 40,000 yuan to subsidize the masses for autumn planting according to the standard of 20 yuan per mu; Six towns and villages took out special funds and concentrated appraisal in the form of awards and subsidies to fully mobilize the enthusiasm of the masses; Erlangkou Town organized 20 large-scale rotary cultivators to open ditches for the masses free of charge. Autumn sowing in Wang Xi, Dashu, Guhe, Racecourse and other towns has basically ended. By the end of 10, the county had planted 240,000 mu of rape, 0.7 million mu of wheat/kloc, 56,000 mu of autumn and winter vegetables, 60,000 mu of green manure and 20,000 mu of pasture.
Family planning has made full preparations for the examination. Supervise the office to speed up the construction of family planning infrastructure. Xianghe Town Family Planning Service Station was put into use at the end of 10. The renovation of the family planning service station in Shizi Town is coming to an end, and equipment is being purchased. Wugang Town Family Planning Service Station has begun to decorate and paint the interior and exterior walls.
The progress of resettlement housing construction needs to be accelerated. 676 sets of resettlement houses have been built in the first, second and third phases of the Nine-Day Feng Wu Project in Lion Town, and 496 relocated households have moved back. The construction unit of the fourth phase project has been determined; The main project of Wang Cao Community of Land and Resources Bureau has been completed, and the interior and exterior walls are being decorated and painted; Cao Zhuang Community in Xianghe Town has built 22 sets of resettlement houses 1022, and 2 10 households have moved in. The bidding registration for the continuation project has begun. The overall planning of Tang Chuan community is being partially adjusted according to the actual situation.
(three) the implementation of the matters decided by the leaders of the county party committee, the regular meeting of the county party committee and the meeting of the county government.
Of the 36 items assigned by the leaders of the county party Committee, 34 have been completed and 2 are being implemented; 14 has completed the 26 key tasks determined by the monthly meeting of the county party Committee, and 12 is advancing in chronological order. Since September, the county government meeting has decided *** 15. Up to now, 9 projects have been completed, and the implementation plan for the overall digital conversion of CATV has not yet been drawn up, and 4 projects that need to be issued by the government are being examined and approved by the county government office.
(four) to carry out special supervision and research.
65438+1From 4th to 5th of October, according to the instructions of the main leaders of the county party committee, the county bureau of industry and information technology conducted a special inspection and investigation on the management status and situation of buses, taxis and passenger tricycles in the county. In view of the disorderly development and serious saturation of county Mazda in recent years, occupying a large number of urban roads and passenger transport resources, seriously affecting the vital interests of the people and the environmental construction of the county, the inspectors extensively solicited opinions, combed and analyzed the existing problems and reasons, formed a special investigation report, and put forward suggestions for carrying out special rectification of the county passenger transport market.
(5) Seriously deal with people's online users' messages.
The netizen of People's Daily who handled the supervision office of the municipal party committee left a message to Wang Jinshan, secretary of the provincial party committee 1. Supervise and carefully review the wage arrears of migrant workers at the construction site of Wugang New Village, such as Wei. Wugang town government hired legal advisers for 47 migrant workers, including Wei, and suspended the implementation of the new agreement with the construction unit; The county court heard the case on 29 October, 65438/kloc-0. 10.5, 165438 The case was transferred to the public security organ for investigation on suspicion of contract fraud.
(vi) Implementation and feedback
In view of the problems found in the supervision of the preparatory work for the centralized start-up activities of the project, such as poor traffic between the start-up points, no planting of some farmland along the way, and inadequate sanitation and cleaning, the county transportation bureau quickly dispatched 7 road shifts, 2 maintenance teams with more than 60 people and 10 machinery to work overtime to carry out surprise maintenance on the flood control road of the Chuhe levee and the connecting road between the start-up points, with a total length of 2 1 km; Erlangkou Town organized more than 80 laborers and 15 machines in time, and thoroughly cleaned the sanitation along Guangping, Chengjiacheng and Chizhen. Township cadres are responsible for ensuring that more than 30 rotary tillers are organized to complete the rotary tillage and sowing of farmland in the Sun Qing section of Erlangkou and the Jiawei section of Bujicheng.
The second is to strengthen self-construction and improve work level.
(a) to strengthen the sense of responsibility, all-weather performance of duties.
During the National Day holiday, all the staff of the county work supervision bureau gave up their rest and worked overtime. They supervised and supervised the street lamp emergency repair, greening project, letters and visits to maintain stability and the situation of each unit on duty in Quanjiao section of Chuquan Railway, conducted a special investigation on the county passenger transport market, and carried out supervision activities for 7 times, successfully completing the holiday supervision task.
(B) improve the office environment, improve work efficiency
Strengthen the hardware construction of bureau organs, optimize and integrate staff offices and conference rooms, acquire necessary office facilities and effectively improve office conditions according to the actual situation and the principle of frugality, convenience and efficiency.
(3) Pay close attention to team building and improve the overall level.
According to the opinions of the organization of the county party committee and the personnel department, on 10 year123 October, the examination and employment of the staff selected by the government ended. The assessment team conducted a comprehensive assessment of the work, study and ideological status of the selected personnel from four aspects: morality, ability, diligence and performance, and put an end to the "muddling along" personnel from the system and procedures. According to the "Appraisal Plan for the Selected Personnel of Quanjiao County Work Supervision Bureau" and the procedures of personal debriefing, text entry, bureau leaders' comments and bureau staff evaluation,
Third, take the initiative to communicate and broaden the working ideas.
(a) take the initiative to report to the province.
10 On June 5438+05, members of the bureau team went to the provincial party committee's DuZhaShi to report their work. After listening to the report on the supervision work in our county, Jason, deputy secretary-general of the provincial party committee, fully affirmed the practice of innovative supervision work in our county, and put forward specific requirements for the next step, requiring the supervision department, as an institution to promote the implementation of the work, to establish and safeguard the authority of the party Committee and government around the center, strengthen the self-construction of the supervision team, do a good job in handling netizens' messages and earnestly perform its duties.
(two) invited to participate in the province's netizens message processing forum.
654381On October 20th, Hefei held a forum on handling netizens' messages. As one of the representatives of six county-level regulatory authorities in the province, our county was invited to participate in the symposium, and had full communication with the heads of provincial, city and county regulatory agencies during the meeting. After the meeting, the main person in charge of the bureau immediately made a special report to the main leaders of the county party Committee and the government, and held a meeting of all staff to convey the spirit of the learning meeting and the important instructions of Secretary Wang Jinshan on the handling of netizens' messages. Combined with the implementation of the spirit of the meeting, the next stage of county-wide supervision was deployed and arranged.
People who read the supervision work month summary also read it.
1. Model essay on personal work summary of inspectors
2. The supervision work summary model essay
3. How to write a monthly work summary
4. Monthly work summary of the office director
5. Summary of the work of the Municipal Supervision and Inspection Bureau in the first half of the year