After that, the decoration works such as ceramic tile laying in the kitchen will be completed. At this stage, anything that does not affect tile laying can be constructed at the same time;
After the decoration project is completed, it is the installation of equipment, and the most hidden part is done first. The layout of each house is different, and the order is different. Generally, the hose part of the gas pipeline is pulled to the position of the gas stove first, and then the water pool is installed. Others can be determined according to the actual situation on site.