Current location - Recipe Complete Network - Catering franchise - What measures are there to optimize the construction safety management of water conservancy projects?
What measures are there to optimize the construction safety management of water conservancy projects?
1. Safety management objective: standardized management will be implemented on the construction site, and there will be no personal and other accidents on the construction site, and the annual industrial accident rate will be zero.

2, enter the site must abide by the six disciplines of production safety.

3. Conscientiously implement the policy of "safety first, prevention first", adhere to the principle that production must be safe, earnestly publicize the relevant safety laws and regulations of the Ministry of Construction, and adhere to the safety technical disclosure system.

4. Before construction, conduct safety publicity and education for all personnel involved in the construction of this project, organize employees to learn the Regulations, Regulations and Safety Operating Procedures issued by the State Council, the city, the Ministry and the company, and require employees to strictly abide by the provisions of relevant documents in production, and carry out safety education activities during the season change, before and after the festival or when workers change jobs.

5. Carry out the construction in strict accordance with the construction organization design approved by the company and the requirements of safety technical measures of the division. Operators must abide by their job responsibilities and safety operation procedures. Special jobs should be trained and certified. Safety officers at all levels should conduct safety inspections every day to stop illegal command and operation.

6. Before the construction, the project department shall make safety technical disclosure to the team, requiring each team to adhere to the safety education activities before the shift.

7, the project department must insist on personally led by the project manager, organize a regular safety inspection every half a month; On-site safety personnel must carry out daily inspection, and the inspection must be recorded in writing. The problems found must be rectified in time, and measures should be taken by individuals, and there should be a review record.

8. Strictly implement the "three treasures" system. You must wear a safety helmet when entering the construction site, wear a safety belt when working at height, and set up a fully enclosed enclosure for scaffolding.

9. Before and during construction, always check the safety performance of all equipment on the construction site. Equipment or facilities that have not been accepted by the relevant departments are not allowed to be used. The places that do not meet the safety regulations should be rectified immediately, and necessary guardrails and whole billboards should be set up at the construction site.

10, scaffolding should be set up in strict accordance with the specification requirements, and acceptance should be carried out before each erection and demolition to ensure safe operation.

1 1, four-port and limb protection measures must be carried out according to the following requirements:

A. In addition to protective facilities and safety signs, all kinds of holes and pits near the access roads in the construction site should be set with red lights at night.

B, floor, roof and platform, etc. , the short side size is less than 625px but more than 62.5px (such as toilet and kitchen pipe wells), and a firm cover plate (bamboo veneer) is set. Cover plate should be able to prevent movement and displacement, and painted with safety color code.

C, protective railings should be composed of two bars and railings. The height of the upper pole from the ground is 1.2m, and the height of the lower pole is 0.6m ..

12, do a good job of acceptance of formwork support system. According to the concrete age inspection report, the supporting system can only be dismantled after the concrete strength meets the design and specification requirements.

13, inflammable and explosive goods stacking place should comply with the relevant regulations, strictly implement the open flame examination and approval system, and the first, second and third level open flame operations must be approved by the relevant departments.

14. Take preventive measures against natural factors such as rain, lightning and wind.

15, do a good job of heatstroke prevention and cooling in summer, set up a medical room and equip it with medicines.

16. TN-S power distribution system is adopted in this project, which requires three-level power distribution and two-level protection. According to the characteristics of this project, a detailed "construction electricity organization design" is compiled, and temporary electricity construction is carried out in strict accordance with the plan.

17. On-site mechanical and electrical equipment and electrical lines are managed by special personnel, and the listing system is implemented. Civil engineering equipment is maintained according to the company's maintenance system.

18, do a good job in civilized management of the construction site, and set up various civilized signs based on the CIS image recognition system of Zhongtian Group.

19, strict reward and punishment system of the project department, economic and harmonious punishment for illegal commanding and illegal operators in the process of safe production, and reward those who have made outstanding contributions to the work of the project department or performed well. And ensure that rewards and punishments are clear, fair and implemented.