1, Dongbai, Houjiadao area shantytown resettlement project: resettlement of 26 buildings in the first phase, of which 17 buildings in the A area, is being renovated construction, windows, water and electricity installation; B area 9 monolithic, windows, water and electricity installation. Resettlement Phase II ***9 buildings, the main structure is completed, is the internal wall masonry, internal and external wall plastering.
2, the development zone area and the development zone area of the second phase of the shanty reform project: the division of A, B two resettlement areas, including the resettlement of A area 1248 sets of 13 main buildings and commercial, kindergarten building: basic completion, is being accepted and rectification. Resettlement B area 639 sets of 8 resettlement buildings, the main body, secondary structure is completed; is the internal wall plastering, external wall plastering, windows, floor heating installation.
3, Daqi area shantytown renovation resettlement project: *** construction of 10 resettlement buildings, of which 7 main body is completed, 3 main body repaired to 24-27 floors, the secondary structure under construction (completed 3).
4, the big pay peripheral area shantytown renovation resettlement project: *** construction of 11 resettlement buildings, the main standard layer of construction, of which the 7 # building construction of 16 floors, 3 building construction of 15 floors, 3 building construction of 13 floors, 4 building construction of 6 floors.
5, cap Yang, high Lee area shantytown renovation resettlement project: 11 resettlement buildings have been started, 1 # building negative two roof pouring is complete, 7 #, 8 # building foundation raft pouring is complete. Work is resuming.