In order to separate the space, so as to improve the utilization rate of the space or improve the visual deficiency, people will choose various partitions or partitions in the actual decoration operation process. For example, the gypsum board partition described below is one of the representative designs, which is not only simple to operate and install, but also excellent in cost performance, not only suitable for daily use at home, but also meeting the needs of some office places. Then you may wish to learn something related to this with Xiaobian.

1. How much is the gypsum board partition wall (price source network, for reference only)

1. Generally speaking, the price of gypsum board partition wall is about 75 keel 25 yuan/square meter, and the labor cost of double-sided gypsum board is about 25-35 yuan/square meter (with or without sound insulation rock wool). If it is high-grade material, the price is between 111 and 171 yuan/square meter. The above prices are for reference only. You can consult your local dealer for details.

2. The price of gypsum board partition wall is different because of different thickness and patterns, and the price is also different in different quantities and regions, which fluctuates greatly.

second, what are the construction methods?

1. Pay-off at wall position? According to the design and construction drawing, the boundary line of partition wall, the position line of keel along the top and the ground, and the door opening line are popped up on the substrate. And put out corresponding control points or control lines at appropriate positions to meet the needs of construction and monitoring.

2. Install the keel along the top and the keel along the ground? According to the position line of the partition wall that has been put away, the top keel and the ground keel are fixed. The top keel and the ground keel require high-side transverse keel, and the keel is fixed on the main body with nails. The starting position of nail shooting is 51mm away from the keel end, and the nail shooting distance is not more than 1111mm, which is arranged in a Z shape.

3. Fix the frame keel? The frame keel is fixed along the elastic line, and the starting position of nail shooting is 51mm away from the keel end, and the nail shooting distance is 311mm, which is arranged in a Z shape.

4, vertical keel position step? According to the position of the hole of the pay-off door of the partition wall, after installing the keel along the top and the ground, the wall is graded according to the vertical keel spacing, and the vertical keel spacing is 411-611 mm. The step is arranged from one end of the wall. In the design of doors and windows, the positioning size of vertical keel of internal partition wall shall not be changed, and additional keel shall be set according to the design requirements for adjustment. When the grading module is insufficient, the vertical keel position will be adjusted locally with the panel position.

5. Install the vertical keel (1). Install the vertical keel according to the step position. Insert the top keel and the ground keel at the upper and lower ends of the vertical keel. After adjusting the vertical position and positioning accurately, fix it with self-tapping screws. ?

(2) The vertical keel is cut according to the distance between the upper and lower high-side horizontal keels (to facilitate the insertion of the horizontal keel, the length of the vertical keel can be 11mm shorter than the spacing between the upper and lower horizontal keels). (3) When installing the vertical keel, the opening direction should be consistent. If lap joint is needed, the upper and lower openings should be consistent, and the openings should be on the same horizontal plane. ?

(4) After installation, use hanging to correct the verticality of vertical keel.

6. square steel installation? According to the design requirements, 41x51 square steel is added into the vertical keel for reinforcement.

7. Install the door frame keel?

(1) The ground keel is disconnected at the door opening, and additional vertical keels are erected on both sides of the door opening, reaching the top according to the design requirements, leaving blank above the door opening. The additional vertical keel opening faces away from the hole. (2) Install additional transverse keel on the hole. ?

(3) When stepping, the vertical keel should avoid the position of the door opening frame edge, so that the gypsum board joint can avoid the door frame line.

from the above description, we can know that the gypsum board partition wall is not only simple to install, but also reasonable in material price. We can also find that it can not only be used as a daily home building material product to partition space, but also be used in office places to divide functional areas. In addition, the special material advantages of gypsum board partition wall also make its service life and quality relatively superior, so friends who are interested in purchasing this aspect can choose with confidence in combination with their own demand budget.

Tuba Rabbit online provides you with "decoration quotations, 1-4 local decoration companies, 3 sets of decoration design schemes" for free, as well as the decoration pit avoidance strategy! Click this link: /yezhu/zxbj-cszy.php? to8to_from=seo_zhidao_m_jiare& Wb, you can get it for free ~