Installation safety agreement 1 Party A:
Party B:
In order to do a good job in the safety of the installation project of Qingzhi Taekwondo billboard in Hohhot, this agreement is signed by both parties through consultation.
Article 1 Party A's Safety Responsibility
Before Party B installs billboards, Party A shall give oral safety education to the person in charge of Party B's site. The person in charge of Party A's site safety is that the main content of education is safety precautions related to installation.
Article 2 Party B's Safety Responsibility
1. Party B shall provide the machinery, equipment, tools and materials needed to install the publicity board, and be responsible for providing the installation safety agreement for the labor protection articles such as safety belts, helmets and masks of the installers.
3. Party B is responsible for educating the installers on safety and public security, installing in strict accordance with relevant national safety operation regulations, and taking safety measures to ensure safe and civilized construction.
3. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has carried out construction without authorization at its own risk.
2. Party B shall employ legally with complete relevant certificates, and the losses caused by illegal employment shall be borne by Party B. ..
5. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.
6. Party B shall do a good job in finished product protection, and shall not pollute the original decoration, equipment and facilities, otherwise it shall clean up, restore to the original state or make compensation until Party A is satisfied ... The losses caused by poor finished product protection shall be borne by Party B. ..
⒎ Party B shall do a good job in labor protection, and fasten the safety belt when working on the external wall, near the edge and overhead, and hang it in a reliable place. It is forbidden to hang high and use low, and it is forbidden to install publicity boards without wearing seat belts.
⒏ Party B shall ensure that there are no casualties and fire accidents. In case of fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents, all losses and responsibilities arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..
⒐ Party B shall protect the buildings, pipelines and indoor articles, and do a good job in safety alarm equipment and safety protection, and shall not harm others, otherwise the losses caused shall be borne by Party B. ..
⒑ Waste residue, waste liquid and waste materials generated by Party B during installation are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time so as to clean up the site after construction.
(1) Party B shall abide by the law and shall not steal, otherwise it will be punished.
Article 3 This Agreement is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties, with the same legal effect.
Party A (signature): Party B (signature):
Address: Address:
Authorized Agent: Authorized Agent:
Tel: Tel:
Date: Year Month Day Date: Year Month Day
Chapter II of Installation Safety Agreement Party A:
Party B:
In accordance with the Law on Work Safety, Regulations on the Administration of Work Safety in Equipment Installation, national guidelines, policies, decrees on labor protection and regulations on safe construction, in order to implement the policy of safety first and prevention first, clarify the safety responsibilities of both parties, and ensure the safety of people, power grid and equipment during construction, this agreement is signed by both parties through consultation.
I. Overview of the Project:
1, project name:
2. Project location:
Two. Party A's responsibilities:
1. Be responsible for examining and approving the construction scheme and safety technical measures prepared by Party B, and proposing amendments to the imperfect ones.
2. Be responsible for the safety disclosure of Party B's construction area, and provide Party B with relevant underground pipeline information on the construction site and protective measures to be taken.
3. Before or during the construction, Party B shall be truthfully informed of the dangerous factors, protective measures and emergency measures existing in the workplace. If unsafe factors are found, Party B shall be informed in time.
4. Designate safety production management personnel to conduct on-site safety inspection, guide Party B to eliminate unsafe factors that may occur at any time during construction, and inform Party B of the safety measures that should be taken. Responsible for the coordination of safety production when multiple units cross-operate.
5. Such as planned water supply, power supply, wind power, gas, etc. If it may affect the construction, it is the responsibility to inform Party B in advance to prevent accidents.
Three. Party B's responsibilities:
1. Submit the construction scheme and safety technical measures to Party A for approval.
2, responsible for safety technical disclosure to construction personnel. And regular on-site safety education.
3. Comply with Party A's safety production management, fire prevention, explosion prevention and other relevant regulations, and the construction personnel shall not use tools, switches, wrenches, etc. Arbitrariness of the construction unit.
4. Power energy (water, gas, electricity, wind, etc.). Docking shall be conducted at the place designated by Party A, and Party B shall provide its own docking materials and tools according to relevant regulations. If there is leakage at the lower end of the connection, it should be handled in time to prevent accidents. Party B shall be responsible for accidental injuries such as water leakage and electric leakage.
5. The tools used in Party B's construction shall be stored in a safe place designated by Party A, and the site shall be cleared after work to ensure safe and civilized construction. Shall not affect the normal safety production of the construction unit.
6, homework personnel must wear labor protection, protective equipment in accordance with the provisions, high homework fasten your seat belt. Set up safety warning signs in dangerous places on the construction site to reduce unsafe factors and accidents.
7. Party B has the right to refuse to carry out Party A's illegal command in the construction process.
8. If personal injury, equipment damage and other property losses are caused by Party B's responsibility, Party B shall bear all the responsibilities and compensate all the losses caused thereby.
Four. In case of any dispute during the execution of this Agreement, both parties shall settle it through negotiation and mediation. If negotiation or mediation fails, either party may bring a lawsuit to the local people's court.
Verb (abbreviation of verb) After signing this agreement, both parties shall strictly abide by it. Matters not covered shall be settled by both parties through consultation. This agreement is made in duplicate, one for each party. This agreement will automatically become invalid after completion.
Party A:
(signature)
Date, year and month
Party B:
(signature)
Date, year and month
Chapter III of Installation Safety Agreement Party A: Beijing XXXXX Technology Co., Ltd.
Party B:
In order to ensure the safe production on the construction site, Party A and Party B have reached an agreement on the installation of on-site equipment according to the Law on Safe Production and other relevant regulations.
1. When Party B installs equipment on Party A's site, it must conscientiously implement the laws and regulations of the state and local governments on safety production, establish and improve the safety production guarantee system on the construction site, and be fully responsible for safety production on the construction site.
2. Party B shall formulate the construction site safety management system, arrange, implement and inspect the construction safety production situation, and supervise, inspect and manage the site equipment installation.
3. Party A provides electricity for construction, and Party B is responsible for the following parts of the distribution box, with its own electricity meter distribution box;
4. Party A has the right to supervise and inspect Party B's construction site, and has the right to order rectification and shutdown rectification for hidden dangers found in the inspection.
5. Party B is responsible for the safety education of construction personnel. Ensure the safe construction of on-site construction personnel. Put an end to the illegal command and operation of construction personnel.
6. Party B shall ensure the fire safety of the construction site.
7. Party B shall be fully responsible for the construction of electrical equipment and safety.
8. Party B shall be fully responsible for the safety, use and maintenance of its own equipment and leased equipment.
9. Party B is responsible for providing personal labor protection articles such as work clothes and safety helmets that meet the national standards for the construction personnel of the unit, and supervising and educating them to wear and use them correctly.
10. Party B's construction personnel and employees are not allowed to drink alcohol during construction.
1 1. Seat belts, safety helmets, etc. Wear it and use it correctly when working at height.
12. Party B shall be fully responsible for the safety of construction personnel and equipment used within its construction scope, and Party B shall be responsible for any problems arising therefrom, and Party A shall not be held responsible.
13. Party B shall take full responsibility for the safety and quality of the equipment under construction.
14. Party B shall not damage Party A's facilities during the construction, and compensate for any problems.
15. Party B's construction personnel should do a good job of unity, and fighting is not allowed. If there is any problem, Party B shall handle it and be responsible for it.
16. Party B shall obey the unified coordination and management of Party A, and be responsible for the civilized construction in the construction area to ensure that the facilities in the construction area are in good condition, the roads are smooth and the sanitation meets the requirements.
17. This agreement shall come into force as of the date of signature, and shall have the same effect as the economic contract after being signed by the representatives of both parties.
This agreement is made in duplicate, one for each party.
Party a: Beijing XXXXX technology co., ltd. party b
Responsible for signing on behalf of.
Year after year, month after month, year after year.
Article 4 of the Installation Safety Agreement Party A: Beijing Guoneng Zijin Electric Technology Co., Ltd.
Party B:
In order to ensure the safe production on the construction site, Party A and Party B have reached an agreement on the installation of on-site equipment according to the Law on Safe Production and other relevant regulations.
1. When Party B installs equipment on Party A's site, it must conscientiously implement the laws and regulations of the state and local governments on safety production, establish and improve the safety production guarantee system on the construction site, and be fully responsible for safety production on the construction site.
2. Party B shall formulate the construction site safety management system, arrange, implement and inspect the construction safety production situation, and supervise, inspect and manage the site equipment installation.
3. Party A provides electricity for construction, and Party B is responsible for the following parts of the distribution box, with its own electricity meter distribution box;
4. Party A has the right to supervise and inspect Party B's construction site, and has the right to order rectification and shutdown rectification for hidden dangers found in the inspection.
5. Party B is responsible for the safety education of construction personnel. Ensure the safe construction of on-site construction personnel. Put an end to the illegal command and operation of construction personnel.
6. Party B shall ensure the fire safety of the construction site.
7. Party B shall be fully responsible for the construction of electrical equipment and safety.
8. Party B shall be fully responsible for the safety, use and maintenance of its own equipment and leased equipment.
9. Party B is responsible for providing personal labor protection articles such as work clothes and safety helmets that meet the national standards for the construction personnel of the unit, and supervising and educating them to wear and use them correctly.
10. Party B's construction personnel and employees are not allowed to drink alcohol during construction.
1 1. Seat belts, safety helmets, etc. Wear it and use it correctly when working at height.
12. Party B shall be fully responsible for the safety of construction personnel and equipment used within its construction scope, and Party B shall be responsible for any problems arising therefrom, and Party A shall not be held responsible.
13. Party B shall take full responsibility for the safety and quality of the equipment under construction.
14. Party B shall not damage Party A's facilities during the construction, and compensate for any problems.
15. Party B's construction personnel should do a good job of unity, and fighting is not allowed. If there is any problem, Party B shall handle it and be responsible for it.
14. Party B shall obey the unified coordination and management of Party A, and be responsible for the civilized construction in the construction area to ensure that the facilities in the construction area are in good condition, the roads are smooth and the sanitation meets the requirements.
15. This agreement shall come into force as of the date of signature, and shall have the same effect as the economic contract after being signed by the representatives of both parties.
This agreement is made in duplicate, one for each party.
Party A: Beijing Guoneng Zijin Electric Technology Co., Ltd. Party B
Responsible for signing on behalf of.
Year, month, sun, moon, sun.
Chapter 5 User of Installation Security Agreement: (hereinafter referred to as Party A)
Installation unit: (hereinafter referred to as Party B)
Party A and Party B sign this safety agreement on the installation and disassembly of the material hoist in this project. In order to clarify the safety production responsibilities of both parties and ensure the safe installation, disassembly and operation of machinery, this agreement is specially signed:
1. Party A and Party B must conscientiously implement the national laws, regulations, standards, specifications, procedures and various internal rules and regulations of the enterprise.
Second, the leadership of Party B must seriously organize the employees of this department to carry out safety production system and safety technology education, enhance safety awareness and legal concept, improve employees' self-protection ability, and urge employees to consciously abide by safety production rules and regulations and labor protection discipline.
Three. Party B's personnel involved in installation and disassembly must strictly abide by the relevant operating rules, and it is strictly forbidden to command or operate illegally or violate labor discipline. Demolition and operation personnel must hold valid certificates.
Four. In the process of mechanical installation and disassembly, Party A shall provide normal power supply, voltage, necessary safety protection facilities and sufficient operation site, and set up eye-catching safety warning signs around the site.
5. During the installation, operation and disassembly, Party B's personnel must abide by the six disciplines of safety in production on the construction site, wear safety helmets and fasten their headbands, and the aerial workers should fasten their safety belts and wear other necessary protective articles.
6. Party B must regularly check the safety devices of mechanical equipment according to the relevant requirements of the state and industry to ensure that the equipment is in good condition and can run safely.
Seven, Party B's operators or maintenance personnel shall conduct safety inspection on the equipment before each start-up, to ensure that the equipment does not work with diseases, and carry out regular maintenance on the equipment.
Eight, Party B in the construction process of mechanical equipment accidents and personal injury accidents, including traffic accidents in transit, all its economic and legal responsibilities shall be borne by Party B.. ..
Nine, before the construction, Party B shall do a good job of safety technical disclosure to all operators, and strictly implement the installation and disassembly process regulations.
Employer (official seal):
Installation unit (official seal):
Signature of the project responsible representative:
Signature of the project responsible representative:
date month year