Step 1: Pre-design and material preparation.
When decorating the pavement, we must first measure the pavement on the spot, master the actual size and size of the pavement, and also think about the effect to be obtained after the decoration and prepare the materials needed in the decoration process. Generally speaking, if the decoration company carries out professional decoration on the pavement, the decoration company will generally provide a series of construction drawings and materials, such as pavement decoration renderings, pavement decoration construction plans, pavement construction circuit diagrams, and pavement construction material lists. If you decorate yourself, you need to locate the pavement yourself, design the general plan yourself and prepare the decoration materials.
Step 2: Hydropower transformation.
Whether the pavement needs hydropower reconstruction is decided according to the actual situation. This process is mainly to do a good job of waterproofing the bathroom, and redesign the circuit according to the actual use of the pavement to make the circuit more reasonable. In addition, in the hydropower transformation, it may be designed to slot the wall and the ground.
Step 3: the ceiling.
The purpose of the suspended ceiling is to make the space effect of the pavement more perfect, and it is necessary to make requirements on the modeling requirements and material selection of the suspended ceiling. General ceiling materials are mainly mineral wool board, gypsum board, aluminum gusset plate, glass and metal.
Step 4: Lay bricks on the floor.
In fact, tiling and ceiling can be carried out at the same time, and there is no conflict. The main purpose of laying bricks on the ground is to make the paved ground look more perfect and the effect more comfortable.
Step 5: Wall treatment.
Wall treatment is mainly to carry out basic treatment on the paved wall, such as painting, brightening and even scraping glue and pasting wallpaper. Its main purpose is to make the whole road feel more comfortable.
Step 6: sign production.
This step is mainly to beautify the "facade" of the road surface, and do your own signboards to publicize the road surface.
Step 7: Purchase and installation of all kinds of business furniture.
This is the last step in the renovation. After installing the furniture needed by the business hall, you can get ready for business.
Generally speaking, the general process of pavement decoration is like this, and the specific decoration process needs to be carried out according to the actual situation, hoping to help friends.