1, tear down the wall
First remove the original wall pattern of the kitchen, and then re-build the wall according to the new decoration scheme of the kitchen. If the second-hand house is renovated, it is necessary to remove the tiles on the wall, the lights on the ceiling and the ceiling.
2. Hydropower transformation
According to the correct construction specifications, the water and electricity pipelines will be installed as concealed pipes, so that the interior will look more beautiful, and enough sockets, switches and positions need to be reserved in advance.
3. Deal with walls and floors
Correctly repair the uneven position of the wall and the ground, and then level it with plastering mortar.
4, waterproof construction
After the walls and floors are dry, apply waterproof coating on them for about 2 ~ 3 times. After coating, wait for more than 24 hours, and then start the closed water test to ensure that the waterproof layer does not leak. If the test fails, waterproof construction needs to be carried out again.
5. Tile laying
After the waterproof layer is dry, you can start laying tiles on the wall and ground. Under normal circumstances, wall tiles should be laid first, and then floor tiles should be laid, so that floor tiles are less likely to be damaged. When laying tiles, we must control the hollowing rate, and the hollowing rate is preferably less than 5%.
Step 6 install the ceiling
Find a brand of kitchen ceiling and arrange professional installers to install the kitchen ceiling at home.
Step 7 install cabinets
Find a cabinet brand and arrange professional installers to install cabinets and countertops at home.
8, install lamps and lanterns
Find a professional to install kitchen lamps, switch sockets, etc.