What decorations are put on the partition?
At present, partition cabinets have been widely used in many residential owners' homes, and they are mainly used in large living rooms and restaurants. And many customers' restaurants and living rooms are next to each other, without any bad feelings. Some residents' living rooms look wider as a whole. At this moment, you can flexibly use the partition effect of the partition cabinet to make all the living rooms or restaurants look rich, and you can also store and organize items, making the open indoor space more and more mysterious. At present, the thickness of the pouring layer is generally 80mm and the plastering layer 100mm, which is not enough. Therefore, it is generally not recommended to use thick red bricks as partitions on the pouring layer. The bathroom partition can use explosion-proof glass on the ground or dark stainless steel frame explosion-proof glass, which is similar to the partition of the whole shower room. Light weight, high strength, light transmission and convenient disassembly.
Do partition at home, if only consider the cost-effective use of gypsum board. But there is no doubt that home improvement can not only consider the cost performance, but also give priority to wear resistance, beautiful and generous sound insulation and noise reduction, so as to be considered as a cost factor. If it is a large area partition, we can consider using lightweight cement precast slab, which is made of concrete and foam plastic, with good layering, good sound insulation and noise reduction and fast construction speed. If the range is not large, ordinary foam can be used for transfer. Chinese restaurant kitchen partitions are widely used to make cabinets, put an empty red wine bottle, or flowers and trees, which are usually made by carpenters, and there are simulation drawings for you to choose from. You can do that if you want to.
Precautions for partition use
1. Observe the natural environment of the project construction. It is very important to investigate the construction conditions of the project. The key goal of surveying the natural environment of the project construction is to judge whether there are installation standards on site, record the columns and beams of the roof and the central air conditioning pipeline system, so as to customize the project construction scheme. The appropriate time for project construction is before all interior decoration is carried out.
2. Accurate measurement and positioning. According to the construction drawings, the line control of movable partition wall is set out on the indoor pavement, and the line of partition wall is connected to the guide wall and the cast-in-place slab. When paying-off, the installation line of the fixing piece must be ejected. The relative height of track installation must be discussed with the construction team that installed the ceiling, otherwise it will cause great inconvenience.
3. Installation of steel frame structure and track fasteners. Steel structure is a load-bearing structure connecting the roof and the track. Steel structure involves the safety factor of all movable partition system software, so we must not take any chances. According to the construction plan, screw the roof, and then fix the triangle with electric welding. According to the design requirements, choose the track fixing parts. Before installing the track, the edging methods of walls, sidewalks and ceilings should be considered to facilitate the installation of movable partitions. According to the calculation of the net weight of movable partition wall, the load borne by the track, the specifications and models of embedded parts and the fixing method should be made clear. The embedded parts of the track shall be installed firmly, and the solid metal products shall be fixed between the track and the main project, and shall be rustproof.
4. Install the track. Suspension training track: the method to determine the suspension guidance is to install rollers at the top of the partition wall and connect them with the upper suspension training track. Tracks and rollers should be used according to the load. Light movable partition wall, the track is fixed on the wooden shelf or steel belt along the top with wooden screws or opposite screws.