Export the detailed list of invoices issued to customers as follows.
First, find out which month the invoice was issued, the full name of the supplier and the tax number, and then enter the following tax opening computer interface, enter the relevant date period, company name, tax number and export information. Enter the complete relevant date segment, company name and tax number.
If the flow rate is far below the minimum flow rate to ensure accuracy, there will be no output (such as vortex flowmeter) or the output signal will be cut off as a small signal (such as differential pressure flowmeter), which is unfavorable and unfair to suppliers. In order to prevent the loss of benefits, for a specific set of thermal energy metering equipment, the supply and demand sides often agree that a certain flow value is the "agreed lower limit flow" according to the flow measurement range and the achievable range, and agree that if the actual flow is less than the agreed value, it will be charged according to the lower limit flow. The metrological administrative department of the people's government at or above the county level may set up metrological verification institutions according to needs, or authorize metrological verification institutions of other units to perform compulsory verification and other verification and testing tasks. Personnel who perform the verification and testing tasks specified in the preceding paragraph must pass the examination. This function is usually realized in the flow display instrument. The metrological administrative department of the local people's government at or above the county level shall, according to the needs of the local area, establish public standard instruments of measurement, which shall be used after passing the examination presided over by the metrological administrative department of the people's government at a higher level.