Detailed rules for the implementation of bill of quantities valuation of construction projects in Hangzhou?
The detailed rules for the implementation of the bill of quantities valuation of construction projects in Hangzhou are very important, and each treatment of the detailed rules is crucial, which determines the future of the selection. Zhong Da Consulting will explain the detailed rules for the implementation of the bill of quantities valuation of construction projects in Hangzhou.

Chapter I General Provisions Article 1 In order to standardize the valuation behavior of the bill of quantities of construction projects, unify the compilation and valuation methods of the bill of quantities of construction projects, and safeguard the legitimate rights and interests of developers and contractors, According to People's Republic of China (PRC) * * and the national standard "Code for Valuation of Bill of Quantities of Construction Projects" (GB 50500-2013+03) (hereinafter referred to as "Code for Valuation") and the national standard "Code for Calculation of Quantities" of related professional projects, And the Ministry of Housing and Urban-Rural Development and the Ministry of Finance jointly issued the Construction and Installation Project Cost Composition (Jian Biao [2013] No.400), the Management Measures for Construction Project Cost Valuation in Zhejiang Province (Provincial Government Decree No.296) and the Notice of the Provincial Housing and Construction Department on Implementing National Standards (GB 50500-2013+)

Article 2 These Detailed Rules shall apply to the activities of bill of quantities valuation in the contracting and implementation stages of construction projects within the administrative area of Hangzhou.

The construction projects mentioned in these rules refer to housing construction and municipal infrastructure projects.

Housing construction refers to all kinds of housing construction and its ancillary facilities, as well as supporting lines, pipelines, equipment installation projects, indoor and outdoor decoration projects.

Municipal infrastructure projects refer to civil engineering, pipeline and equipment installation projects of urban roads, public transportation, water supply, drainage, gas, heat, gardens, sanitation, sewage treatment, garbage disposal, flood control, underground public facilities and their ancillary facilities.

Article 3 The valuation activities of bill of quantities mentioned in these Detailed Rules include: the compilation of tender bill of quantities, tender control price and tender quotation in the project contracting stage; Contract price agreement at the stage of contract signing and project implementation, engineering measurement and contract price payment during construction, claim and on-site visa, contract price adjustment, completion settlement, project valuation dispute settlement, and project cost appraisal.

Fourth construction projects invested by state-owned funds must be priced by bill of quantities. If the construction project invested by non-state-owned funds is priced by bill of quantities, it shall be implemented with reference to these rules.

Article 5 Hangzhou Urban and Rural Construction Committee is the administrative department in charge of the valuation activities of the bill of quantities of construction projects in this Municipality, and the specific work is entrusted to Hangzhou Construction Project Cost and Investment Management Office for implementation. District and county (city) construction administrative departments shall do relevant work according to their respective responsibilities.

Chapter II List and Valuation of Bidding Stage Section I Compilation of Bidding Bill of Quantities Article 6 The bidding bill of quantities is the names and corresponding detailed lists of partial and sub-project projects, measures, other projects, fees and taxes of construction projects, including tables and descriptions of partial and sub-project projects, measures and other projects.

Article 7 The tender bill of quantities shall be compiled by the tenderer according to the national standards, tender documents, design documents and the actual situation of the construction site, and published with the tender documents for bidders to quote. It is an important part of the tender documents, and the bidder is responsible for its accuracy and completeness. Bidders have no right to modify and adjust the bidding bill of quantities.

Article 8 The tender bill of quantities shall be compiled according to the following information:

1. Code for Valuation and Code for Calculation of Quantities, the national standard for related professional engineering; 2. Relevant valuation methods and regulations promulgated by provincial and municipal construction administrative departments and project cost management institutions; 3. Detailed rules for implementation; 4. Construction drawings and related materials reaching the specified design depth; 5. Specifications, standards and technical data related to the project; 6. The tender documents and their supplementary notices and answering minutes; 7. The actual situation of the construction site, geological and hydrological data, engineering characteristics and conventional construction scheme; 8. Other relevant information.

Article 9 A tenderer shall, according to the composition of a construction project, the contract awarding method and the quotation requirements, specify the specific requirements such as the type and format of the paper document report submitted by the bidder in the tender documents. See the attachment for the bidding bill of quantities and the type and format of its quotation.

Article 10 Where electronic bidding is adopted, the tenderee shall provide an electronic bidding bill of quantities consistent with the paper content. E-tender bill of quantities includes partial project list and valuation table, measure project list and valuation table, other project list and valuation table and other report formats required by bidders.

Article 11 The compilation of the general description of the tender bill of quantities shall include the following contents:

1. Project overview: construction address, construction scale, engineering characteristics, composition of unit projects in the bidding project, construction site conditions, traffic, natural and geographical conditions, etc.

2. Scope of project bidding and subcontracting. The bidder shall clearly include the contents of the project managed by the general contractor and the responsibilities that need to be borne by the general contractor. 3. The basis for the preparation of the tender bill of quantities.

4. Requirements for project quality, construction period, materials and construction.

5. Requirements for safe construction, civilized construction, environmental protection and temporary facilities. The calculation base and the lowest rate standard of the cost of safety and civilized construction measures corresponding to various professional projects of the project subject to tender.

6. Name, specification, model and quantity of materials and engineering equipment purchased by the tenderer (hereinafter referred to as materials supplied by Party A).

7. The tenderer requires the general contractor to provide general contracting services.

8. The amount of the temporary fund.

9. Other issues that need to be explained.

Article 12 When determining the name of the project and describing the characteristics of the partial bill of quantities, the tender bill of quantities compilers shall conform to the requirements of the Code for Calculation of Quantities, be specific, accurate and complete, and clearly describe the factors affecting the project cost.

Thirteenth partial project list should generally be compiled according to different unit projects. When the cost calculation procedures or rates are different, the partial project list must be compiled separately according to different professional projects; When the cost calculation procedures and rates are the same, different professional projects in the unit project can be included in the same partial project list.

Article 14 the list of measures and projects refers to the list of non-engineering entity projects that occur in the process of project preparation and construction in order to complete the project construction.

The list of measures and items should be listed according to the specific conditions of the proposed project, combined with the conventional construction organization design, and with reference to the list of measures and items in the Code for Calculation of Quantities and the current pricing basis in Zhejiang Province.

Fifteenth measures list is divided into technical measures list and organizational measures list.

When compiling the list of technical measures, if the engineering quantity can be calculated or there is a special design, the compiler must calculate and provide the engineering quantity according to the relevant contents of the design; If the engineering quantity cannot be calculated or there is no special design, the compiler can list the projects with "item" as the unit of measurement, and the construction unit will fill in the engineering quantity and price by itself in combination with the prepared construction organization design plan.

When compiling the list of organizational measures, the contents included in the cost of organizational measures are determined according to the charging quota and related charging and pricing documents issued by the provincial construction administrative department.