Current location - Recipe Complete Network - Catering franchise - Shanghai facade decoration to report
Shanghai facade decoration to report
A, how much area of the facade renovation need to report

1, the law provides

In accordance with national law, as long as it is a public **** space, whether it is a restaurant, store, store, facade, educational institutions, offices, and other works of renovation have to be through the fire reporting and approval, but in 2018 out of the policy, not to 300 square feet of the office can not be fire reporting, but still need to carry out the fire filing.

2, fire prevention report has the following two ways:

1) 300 square meters or less through the fire website online, fill out the form on the fire network to declare, if the draw 5 working days to send the information to the fire department to check;

2) 300 square meters or more to the Administrative Approval Center, the fire window for processing. Prepare the information as required to be sent to the fire window, waiting to notify the results.

Two, facade renovation report the process required

1, facade renovation report construction review of the materials required to prepare

1) application for approval (construction unit stamp)

2) construction safety measures (construction unit stamp)

3) fire safety measures (construction unit stamp)

4) electricity) fire safety system ( Construction unit seal)

5) construction organization plan (construction unit seal)

6) decoration and renovation plan (design drawings) 2 copies (qualified design company seal)

7) building interior decoration design fire prevention audit declaration form 2 copies (construction unit seal)

8) letter of attorney (construction unit seal)

9) trustee ID card copy

10) the original building of the fire acceptance letter

11) law and order) fire safety responsibility (Party A: the owner of Party B: the construction unit seal)

12) 2 copies of the design and organization of the program (stamped with the seal of the design unit)

13) a set of copies of the original drawings of the original building

14) interior construction drawings and Fire drawings and other blueprints (stamped with the design unit by the annual inspection of the drawings submitted for review special seal)

A, description; B, indoor floor plan; C, ceiling plan; D, floor plan; E, electrical diagrams; F, water supply and drainage diagrams; G, air conditioning diagrams; H, smoke evacuation diagrams; I, fire diagrams; J, fire protection system diagrams

2, prevention of construction review through the Fire Department will give you a certificate of conformity, the next step is to find a company to give you the construction of the building, and the next step is to find a company to give you the construction of the building, and the next step is to find a company to give you the construction of the building. will have to find a company to give you construction.

3, after the end of construction, you have to ask a testing company to give you a test of the electrical system and the fire system (now some places have been canceled electrical system testing it), the test will be issued after passing two qualified reports.

4, then you start to prepare the fire acceptance information, information is as follows:

1) construction unit application for acceptance (stamped)

2) construction unit to fill out the "fire acceptance of construction works declaration form" (in duplicate)

3) construction projects in the fire department of the building fire design audit documents (copy)

(4) fire detection agency test report (original)

5) declaration form filled in the decoration materials (wallpaper) carpet) textiles) need to provide its test report (copy)

5, the declaration form good fire department, if no problem, the Fire Department will come to the acceptance, acceptance, back to you (fire acceptance certificate)

Three, the price of the Shanghai storefront renovation report

The fire is a part of a separate price, but the decoration company offer are included in the cost of fire approval, generally do a fire approval to spend a few tens of thousands of dollars, the store is not particularly large, it is about 20,000, the decoration of the fire decoration prices are generally in the range of 100-200 yuan a square meter.

The above is about "Shanghai facade decoration to report? The process and price of reporting to explain the relevant knowledge of the introduction, whether it is a facade renovation or other business premises renovation is to be reported, do not take a chance, if not in accordance with the requirements of the report, was found to be fined, suspended and so on.