Current location - Recipe Complete Network - Catering franchise - Company Activity Planning
Company Activity Planning
Company Activity Planning Part 1

I. Activity Objectives

This activity is the first collective recreational activities organized by our new employees since they entered the company, and we hope that through this party, we can enhance the understanding between the new workers of various departments, enhance the spirit of group cooperation, and cultivate the ability of various aspects of our abilities, such as organization, performance and other qualities, and stimulate the creativity of all of us. This activity was mainly based on singing, with singing in the middle. This activity to sing the main line, interspersed with some competitive games, and the winner of the game for a certain material rewards.

Second, the specific method

August

× × × × as the activity advocate, activity effect prediction, the development of activity planning draft, sent to the General Manager's Office for approval;

Statistics are willing to participate in the activities of the list of people.

September 15

After approval by the General Manager's Office, make preparations for the event.

(1) Purchase of game props and prizes;

(2) Purchase of food to be eaten during the event;

(3) Book the big room of a-miss by phone in advance;

(4) Arrange for the event staff's dinner and car with the company's general affairs.

September 16th

17:00 Call the activity personnel to the restaurant for dinner;

17:30 Depart from the company on time and start the activity after arriving at the destination.

22:00 End of the activity, arrange to send people back.

Third, the game content

1, Yugong Yishan

Game props: ping-pong balls (20), thick straws (4), pots (2, with a4 paper can be folded)

Rules of the game: the mouth to hold the straws to inhale, will be 10 ping-pong balls from the a pot to move into the b pots, the a pot, b pots are 4 meters apart, move

The process of action You can't touch the balls with both hands, otherwise it's not a foul and you have to move them again. The first one to finish 10 balls wins the game.

Activity number: 2 people, arranged in two groups.

2, "love" word contest

Rules of the game: the activities of the participants are freely divided into two groups of song contest, each person sings a song, sung in the song must have the word "love", adhere to the last party won (cha-cha-cha). The first one is the one with the word "love" in the song.)

3, a pair of devil shoes

Game props: rubber shoes (1 pair), a long, slippery, live animals (confidential),

Rules of the game:

two performers: by the way of "natural manifestation", two people each wear a rubber shoes, one of which has a small animal in the shoe. One of them is wearing a shoe with a small animal in it. The two of them walk around the venue twice after putting on the shoe, and they can't talk, they have to act as if nothing is wrong with them.

The rest of the people: in the above two people walking, pay attention to the speech and color, and make a choice: "Whose shoes have something?", choose the right reward (stick). The rest of the group: look at the above two people as they walk and make a choice: "Who has something in their shoes?". If more than half of the rewarded people, punish the performer to sing a song.

4, clip the balloon

Game props: balloons (4)

Rules of the game: the activities of the participants are freely divided into two groups lined up in two teams, each person will be behind the back of the hand, from the first person to start with the head and body clip the balloon to the next, one by one to pass the first pass through a group to finish the win. (Chewing gum)

Fourth, the activities of the budget

1, the activities of the venue: a-miss ktv big bag (independent bathroom)

20:00 before 54 yuan / hour

20:00 after 144 yuan / hour is expected to be less than 400 yuan.

2, the event props and prizes: prizes control within 3 yuan / a.

The straws needed for the event can be taken at the supermarket, no need to buy.

3. Activity food:

Drinks, melon seeds, fruits, etc., is expected to cost 100 yuan.

Activity budget total: 560 yuan

Company activity planning Part 2

First, the background of the activity:

The company's team is gradually growing, and can not avoid the old and new employees, between the business team, between the business and the logistics of each function, on the work of the problem, there is inevitably with the service communication barriers, and conflicts. Obstacles, and conflicts. In order to make the working atmosphere more harmonious, promote better communication between the various departments and communication, improve work efficiency, create more revenue, the Ministry of Planning for this phenomenon, specially formulated a series of staff relations on the alleviation of the promotion of departmental collaboration efficiency cyclical activities.

Second, the purpose of the activity:

The activities are conducive to instill the company's new ideas, interaction can increase the affinity between the various departments. Through the periodic activities, can timely and effectively convey the company's latest spirit and instructions, so that employees more clearly understand the company's new trends. Choose different departments to carry out the activities of fellowship, more can enhance the different positions, different responsibilities between the staff of collaboration, understanding, tolerance, so as to achieve unity of purpose, effective communication, high efficiency and effectiveness of the team.

Third, the time of the activity:

two months for a cycle to carry out

Fourth, the main body of the activity:

All employees of the company (according to the different departments and employees, the organization of personnel activities. Large activities of no more than 60 people, small activities of no less than 30 people)

Fifth, the activities of the place:

The main venue to the training room is the main, outdoor you can choose to farmland, vacation resort, free of charge in the city of the main park for the place

Sixth, the activities of the place:

Cyclical activities can be roughly divided into three categories: expansion projects, symposium projects, sports activities projects, knowledge of fun competitions.

According to the activities of different subjects, the Planning Department led the organization of the Training Department and departmental management communication, to determine the final program of activities to ensure that the activities can solve the substantive problems, so that the value of the activities to maximize.

(a), expansion is divided into: indoor expansion and outdoor expansion

Indoor expansion: short-term regulation of the mentality and thinking of the effect is good, fast, low cost, can choose from a wealth of activities.

Outdoor development: can form touch and stimulate, strengthen the sense of service, persistence, can enhance the team's ability to work together, to achieve the purpose of teamwork and trust.

(ii), tea party: flexible and diverse forms, colorful content, can be divided into: team talent show, small games, personal talent show, symposium, work role change short time experience feelings, case sharing, ideas and insights exchange, true words, pass the love and so on, a number of small pieces of composition. Not only can the image of the group to the company's publicity, but also for the company's business will accumulate resources.

(C), activities: table tennis competitions, tug-of-war, Persian flying carpet, rope skipping competitions, roller derby competitions, relay races, choral competitions, karaoke competitions, scenic spots of tourism for the group and friendly competition and a series of activities. Can also be organized to the elderly homes, left-behind children, problem children and other areas to send warmth to the community for the widows and orphans and empty nesters to do service and condolence activities, not only can improve the organization and coordination between employees, but also beneficial to improve the company's image, publicity efforts.

(D) real estate professional knowledge contest, assistant team service etiquette contest, strangers listings, customer source competition, debate on the treatment of customers, looking for listings, customer source ways, methods, take a look at the broker skills, skills competition and other knowledge fun contest. Through the competition can not only promote the exchange of experience between employees, but also enhance the enthusiasm of the staff to work.

Seven, the activities of the cost of the budget

The minimum standard for each activity to the standard of 5 yuan / person, the highest standard of 10 yuan / person as a standard.

Activity theme description

Activity theme: the 9th day of the 9th moon, thick respect for the elderly love of the 1st day of the 9th moon theme fellowship

Alternative theme: the 9th day of the 9th moon, xx one-day tour

The people of the world, filial piety is the first thing, the 9th day of the 9th moon to enjoy the health

Activity purpose:

1. /p>

1. As a traditional Chinese festival, Chung Yeung Festival is also a festival for the elderly, which is the best time for us to maintain and develop customers with emotional ties. With the festival opportunity to grasp the reasonable theme, contact feelings, and promote sales.

2. By portraying the beautiful slice of life at the party site, it triggers the attendees' attachment to the good life, thus evoking enough attention to their health.

3, corporate image shaping, enhance corporate image, promote customer upgrade.

Second, the activity time

Before October xx

Third, the invitation object

Mainly invite the children are not around the customer. The customer's gratitude and appreciation to our staff for not forgetting to reunite with them during the holiday season will be an important factor in influencing their on-site purchases.

Fourth, the activities of the key links, selling points and highlights

1, according to the Chongyang Festival has the custom of excursions, according to the actual situation of their own tourism marketing. It is recommended that the morning to arrange health knowledge lectures classroom, lectures to sell goods. Free lunch at noon and visit tourist attractions in the afternoon.

(Jiu Jiu Chongyang since ancient times there are excursions, climbing, chrysanthemum, drinking chrysanthemum wine, insert dogwood custom)

2, to the meeting of each customer to give a beautiful gift.

3. Customers and staff **** drink chrysanthemum tea or chrysanthemum wine.

4, eat Chongyang cake or cake.

5, on-site promotion policy is very generous. (Respect for the elderly package of each company to determine their own)

6, the purchase of goods customers can participate in the site lottery.

7, poetry games. (Prize quiz)

Fifth, the props, venue layout

In the original meeting on the basis of the banner, the venue hanging Mid-Autumn Festival banner: nine nine suns to enjoy the health of the world's good filial piety as the first father's love is like a mountain, the mother's love is like water, a precious health of the world's parents

Sixth, the flow of the activity

Before the opening: loop play the "opening short film"

8:30-8:50: the host on the stage, introduce the theme of the event, introduce the legend of the Chongyang Festival, the origin

8:50-8:55: *** drink chrysanthemum wine or chrysanthemum tea

8: 55-9:00: Staff performance

9:00-9:20: Poetry game

9:20-9:35: Screening of "Nucleic Acid Feature Film"

9:35-9:45: Screening of "Media Proof

9:45-9:50:Health Exercise (for the elderly to move their muscles)

9:50-10:00:Broadcasting of "Interviews with Elderly Customers"

10:00-10:15:Eating Chung Yeung Cake or Cake

10:15-10:20: the host announced promotional policies

10:20-11:30 detection, promotion, lucky draw, awards

VII, lucky draw awards

Each region according to the actual situation in the region, The customer's needs, the design of their own lottery prizes. Can be the company's products, can also be daily practical products. The main purpose is to attract the customer's purchase rate and publicize the company's new products.

VIII, activity notes

1, staff uniform uniforms.

2, the meeting process, there is a place for employees to interspersed seating, the rest of the staff stand neatly on both sides of the venue, actively applauding, creating a field effect.

3, with applause by the store manager and the regional manager is responsible for.

4, during the meeting, employees are not allowed to go in and out of the venue and in the venue shall not walk around.

5, during the meeting, not in the venue to receive, call and receive, send text messages.

6, the venue discipline by the director of the venue is responsible for monitoring records.

The company's activity planning part 4

1, the purpose of the activity

1, to strengthen team cohesion and teamwork ability;

2, to stimulate the staff to participate in the company's various activities;

3, to strengthen and consolidate the staff's familiarization with the company's management system, corporate philosophy, product knowledge, etc.;

4, recreation and entertainment, to alleviate the fatigue of the work.

Second, the object of the activity

All the staff of the time speed

Third, the activity time

20xx in mid-August, or 20xx in mid-September

Fourth, the activity place

Changlong Water Park

Fifth, the travel line

8:00 am from the company set up a departure, 9:00 am to arrive in Guangzhou Changlong Water Park. Guangzhou Changlong Water Park.

Rafting River (10:00-11:00)

Entered through the team entrance at the east gate, which is closer to the center stage. The River Rafting is a narrow strip of rafting scenery divided into six landscape areas along the way, with Tropical, Ice Age, and Penguin Island being just a piece of the puzzle. But these wearing black and white dress 'penguins really very cute, lying on the floating circle counting penguins, suddenly from the back of the catch up with a friend's floating circle hit, two teams so round, continue the rafting trip.

Super Horn (11:10-12:00)

Horn is a large project of the water park, can not be played. 8 people occupy two floats, listen to the narrator to explain the precautions, can not wait to climb on the floats, do not forget to turn back to let the staff to help take a picture of the photo, the camera and so on back to get it again. Huge horn mouth of the gyratory force, so that the girls can not help but scream out, personally think than the impact of the roller coaster is really almost, but the water column that comes to the face, or some unexpected sense of excitement. Experienced friends say, play through the big horn to play the Behemoth Bowl, faster and more exciting.

12:00-12:30 lunch, free activities

Behemoth Bowl (12:30-13:30)

Behemoth Bowl is an upgraded version of the Big Horn, the appearance of the design is not as dazzling as the Big Horn, but because of the semi-sealed bowl, coupled with a longer chute, so in the float in the bowl can form a more high-speed rotation, the people sitting on the floating circle is really close to be flung out of the feeling. The feeling of being thrown out of the bowl.

Jet Slide (13:40-14:40)

Jet Slide is the highest height of the whole water park project, good view, good view. But standing on the platform is really a little scared, listen carefully to the demonstration of the lecturer, climbed on the floating circle, ready to challenge this "water roller coaster". Due to the height and strong water flow, so the whole floating circle of the decline speed is very fast, coupled with the formation of the slope of the track, sometimes feel thrown up the formation of the sense of weightlessness, coupled with not under the protection of the seatbelt, there is the impact of the water flow, so increase the thrill factor of the tour.

Rush Race (14:50-15:50)

Rush Race is a project that can be challenged with friends, and different from other projects, the project holds a similar surfing skateboards, head down from the slide swoop down. It is more participatory and skillful than sitting on a float circle, and it is faster than who rushes and glides farther. The secret to sliding is to clamp your hands and feet together to minimize the resistance of the current. However, this program, because of the principle of gravitational acceleration, those who weight body shape is not fat friends, but also easy to dominate. Just for reference.

Vertical Limit

Another project that challenges the speed and height, also known as the Super Slide. There are three tracks, of which the blue track is fully enclosed with more turns and centrifugal force.

Big Slide (16:00-17:00)

After experiencing the difficult rush race and vertical limit, coming to the Big Slide is a relaxing and stretching program. It is also a program for two people to play. The huge swooping platform of the big skateboard provides a great view of the scenery.

Free activities for half an hour, 17:30 collection back to the company.

Six, cost budget

August

Tickets adult tickets 198 yuan / person * 83 people 16434 yuan

College student tickets 160 yuan / person * 2 people 320 yuan

Food on their own

Items stored in the large cabinets 40 yuan / a * 10 400 yuan

Car fuel 100 yuan * 2 times 200 yuan

***: 17,354 yuan

Group purchase 10% discount 15,618,6 yuan

September

Tickets Adult ticket 140 yuan / person * 83 people 11620 yuan

University student tickets 110 yuan / person * 2 people 220 yuan

Food on your own

Items to be stored in a large cabinet 40 yuan / a * 10 400 yuan

Car fuel 100 yuan * 2 times 200 yuan

***: 12,440 yuan

Group purchase 10% discount of 11,196 yuan

The company's activities in the planning of Part 5

Activity background

Jiayu logistics development so far to nearly a decade of history, is a professional information technology comprehensive logistics company. Professional information technology comprehensive logistics company, the existing total assets of more than 100 million yuan, more than 150 branches across the country. Jiayu relying on its excellent talent team, advanced information systems, advanced service concepts and operating networks throughout the country, increasingly become a famous brand in the logistics industry. Excellent enterprises often provide employees with a broad stage to show themselves, in order to realize the interaction between the staff of Jiayu, enhance the staff's sense of belonging to Jiayu and sense of identity, consolidate and publicize Jiayu's strong corporate culture, on the eve of Jiayu is about to enter the 10th anniversary of China's second largest traditional festival - Mid-Autumn Festival, held a party rich in affectionate characteristics of the Mid-Autumn Festival, so that the people of Jiayu to shape themselves, shape their own The company's image, in the coming days, hand in hand to create a new myth of Jiayu.

Theme

I'm a good show (to be selected)

Jiayu people - with you tomorrow

Purpose

1, so that the staff to fully demonstrate their own, in the process of the activities of the cognitive self and the corporate family atmosphere. The atmosphere of the enterprise family.

2. Realize the interaction between leaders and employees, so that all levels of workers in the enterprise in the **** the same platform for communication.

3. Effectively utilize the process of the event and its publicity strategy to differentiate the operation from the past, so that everyone can feel the development and progress of Jiayu. At the same time packaging Jiayu, to promote the formation of its external image and internal culture.

4., through the Jiayu life show to make Jiayu people cognitive and self discovery, for the future bi behavioral identification system to improve a certain amount of paving.

Target Public

Jiayu headquarters and Shanghai Jiayu staff

Activity time

XX, month, day, night

Activity location

Shanghai Jiayu

Activities

I. Program collection:

1, headquarters departments, each department at least one program; Shanghai company no less than three programs

2, this Thursday 11:00 pm before the completion of the program declaration work

3, this Friday rehearsals

4, the program declared to bring their own accompanying musical instruments or audio cd

2. II.XX Mid-Autumn Festival Party Site

The main time allocation

1, Minle Mid-Autumn Festival promo

Another short promo as the beginning of the party

2, the leadership speech

By the host of the site to introduce the guest of honor to invite, Mr. to the Jiayu staff to give a speech, and to invite everyone to * ** with a toast. ** with a toast

3, selected by the various departments of the activities (specific arrangements to be ordered)

4, Jiayu life show

Description: This activity is designed to allow Jiayu people to recognize themselves, in the process of the performance to recognize the importance of attention to the instrumentation. Today employees represent a department, the future represents the image of the whole Jayu, so that the audience also benefit from it. The event was highly participatory and enjoyable.

There are each department elected two employees as their department's image representative, by the individual to prepare 3-4 sets of life clothing, a set of summer clothing, a set of casual clothing, a set of work clothing, a set of clothing designed by the department to match. Come to participate in this Jiayu people's life show. At the end of the show, we will invite the audience on stage to comment.

5, the game

The same song

Invite leaders and employees *** with a song, the number of invited leaders three, the number of employees three

I guess, I guess, I guess

Invite the employees under the stage to come to the stage to use five questions to guess an item, guessing that can take away the prizes

Prizes set up can be is (cd, small appliances, daily necessities, can be a small animal can also be people, mainly to enhance the entertainment effect)

You are my eyes

The game has two people to complete, a person will be blindfolded, a person at the end of the guide him to complete the journey, set up a number of barriers on the stage, the shortest time the group won the victory.

6, the lottery and the award of gifts

Effect prediction

In view of this activity is the traditional festivals Jiayu internal organization of activities, creative and interactive, as long as the implementation of the implementation of the law, the implementation of the implementation of the implementation of the internal staff can be caused by the active participation of employees and external enterprises to pay attention to the activities of the actual number of participants is expected to reach more than 600, the network report 5. Coverage of Jiayu employees is expected to reach more than 1/2. At the same time, this activity will be conducive to promote the formation of a new corporate culture, enhance the confidence of employees, external display of cordiality and unity and efficient image, effectively enhance their visibility and reputation.

Media communication strategy

1, in view of the "Jayu world" September issue has been delivered to print, the first report will use the network media, that is, in the home page of the news center of the Jayu newsletter published in one.

2, after the implementation of the activities to follow up on the report, the effective use of "Jiayu Tiandi" and Jiayu home page advantages.

3, after the implementation of the activities in the logistics industry in the relevant website for the newsletter class submission.

4, after the event in the cafeteria to publish picture information and related reports. Can take the form of publicity boards and posters, the actual situation carved into a disk as a publicity material for the future corporate image. It can also be uploaded to the webpage.

Advertising media communication strategy

1, the established performance part of the letter sent to the departments in advance (document notification).

2. Poster publicity before the event (can be used as a poster culture popularization of the preliminary guidance).

3, a phrase expression "what you want to see in the Mid-Autumn Festival, surprises waiting for you" set up a message point, the program and the film screening before the determination as a reference to rationalize the expansion of corporate culture internally.

Measures to realize the activity program

1. Contact the Shanghai Division, invite them to serve as the organizer of the event, and invite the headquarters as a co-organizer.

2. After the consultation and adoption by the organizers, the activity program will be submitted to the relevant departments for approval.

3. The establishment of a unified implementation of the planning team, the work will be classified, the implementation of the implementation of the responsible person

Activity site layout

1. In the design and layout, we must pay attention to the unity of the overall style and the local decorative differences, that is, to keep the logo, the background plate and the main color of the same, to take full advantage of the site's original conditions, to make a new idea.

2. The center background has a pearl balloon and fine neon wall composed of background wall, above the paste the theme of the event and the image of Jiayu logo.

3. In the center of the stage on both sides of the background, respectively, set up a white advertising backdrop screen, used to isolate the stage of the hierarchy is also mainly used for the projection of the backdrop with the work of the computer projection equipment.

4. The stage is similar to the t-shaped, by the fine neon directly on the ground connected to the image of the stage, with flowers and plants and appropriate decorations, the audience on both sides of the stage. This design facilitates the interaction between the stage and the audience, and also matches the performance of the program.

5. Main effect

Cafeteria party layout

Work procedures and division of labor

Work procedures

1. Preparation work in the early stage

XX, month, day, to, month, day

1), the declaration of the activity program for processing

2), the design of the event invitations to be sent out

3) Design and implementation of the layout of the event venue

4) Collection and declaration of the event program

5) Preparation of press materials and news reports

6) Procurement of supplies

2.) Reception of the whole process of the event

2). Monitoring and coordinating the whole process of the event

3). On-site camera photography and on-site system

4). Implementation of the personnel of each program on site

5). Distribution of materials, gifts and awards

6). Site cleanup and storage

3. Aftercare

Time XX, month, day, to, month, day

1), the activities of all the text and pictures of the organization

2), the activities of the collection of news reports

3), the work of the summary and evaluation of the effect

The work of the work of the above work has been implemented by the organizers of the work of the organization of the work of the organizers of the organizers of the work, the work of the organizers of the work of the organizers of the work of the organizers of the work of the organizers of the work of the organizers of the event

1). There are, the unit to implement

Activity expenses and budget

1) venue setup costs * yuan

2) catering and hospitality costs * yuan

3) the purchase of a variety of activities supplies * yuan

4) labor costs * yuan

5) gift costs * yuan

6) bonus costs * yuan

7) Motorization cost*$

8)Publicity and advertising cost*$

9)Performance cost*$

Activity evaluation criteria

1)The actual number of participants in the event*not less than 500 people

2)Media coverage of the event*not less than 2 articles

3)Coverage of information about the event*1/2 of the entire staff at the headquarter

4) The number of participants in the event*not less than 500 people

5) The number of participants in the event*not less than 2 articles

6) The cost of the prize*$

7) The cost of the prize*$

4) The implementation of the activity site * without any obvious mistakes

5) the use of funds * strictly within the budget

6) the company's popularity * 5%

7) the company's reputation * 5%

Description of the matter

1, the plan is to be held in XX Jiayu Mid-Autumn Festival Gala activities, some of the contents of the general program. The overall program proposed, some of the content is inevitably sloppy, yet to be determined after the overall idea of the event and then further refinement, and accordingly develop specific implementation plans.

2, similar to such activities generally need to prepare a month's time. And now only one week from the time of the event, it should be quite tight. We expect the organizers to review and determine the overall plan for the event as soon as possible, and put in the preliminary work as soon as possible.

3, the planning team formed soon, but in line with professional, innovative, serious attitude, with considerable design and planning capabilities, and strive to standardize the operation to achieve quality results. If entrusted, when the best efforts to live up to high expectations.