The lessee cannot be exempted or partially exempted from the obligation to pay the rent, but should still pay the rent according to the agreed amount. Do you know what the contract is like now? Here I would like to share with you some lease contracts for bioengineered generators, hoping to help you.
Lease Contract for Bioengineering Generator 1 Party A (lessee): _ _ _ _ _ Real Estate Development Co., Ltd.
Party B (Lessor): _ _ _ _ _ _
Through friendly negotiation, Party A and Party B have reached the following agreement on Party A's lease and use of Party B's generator set, and hereby conclude this contract for compliance.
I. Quantity and model of the contract price of the leased generator set:
The tentative total contract price is: RMB _ _ _ _ _ _ _ (yuan).
The above-mentioned monthly contract fee has included the transportation fee for transporting the unit to the place of use, the lifting fee for the unit back and forth, the maintenance fee for the unit, the basic salary of workers, overtime pay, five insurances and one gold, salary subsidy, mobile construction subsidy, rent subsidy, catering fee, employee welfare fee, labor protection fee, taxes, profits, management fee of Party B, unforeseen expenses and other expenses. In addition, Party A does not need to pay any other fees to Party B. ..
Second, the lease term:
The lease term starts from the day after the generator set arrives at the place of use and is installed (subject to the date confirmed by Party A in writing), and the lease term is tentatively set at six months.
Three. Handover conditions of generator set:
1. Party B is responsible for the transportation expenses of the generator set to the place of use and the expenses of hoisting the generator set back and forth.
2. Party B shall be responsible for providing all maintenance expenses for the running units.
Four. Place of use:
________________________________。
Verb (abbreviation of verb) rent, payment period and payment method:
1、? Both parties reach an agreement through consultation, and both parties will settle accounts once every full month.
2. One month after the lease expires, it will be settled in one month. If it is more than a month, but not satisfied. The rent is settled on a daily basis.
3. When Party B collects each project payment from Party A, it shall issue a valid invoice with the same amount to Party A. Otherwise, Party A has the right to refuse payment until it receives the invoice issued by Party B. ..
Rights and obligations of intransitive verbs;
1.? Party B shall send management personnel to Party A to be responsible for the normal power generation of the generator set, and Party B shall be responsible for the accommodation and meals of the management personnel sent by Party B during the service period.
2、? During the lease period, if the generator set fails, Party B shall be responsible for the maintenance and bear the expenses. If the generator set is shut down for more than 3 times in a week due to non-user reasons, the generator set should be replaced.
3、? If the unit is not shut down for more than 24 hours, Party B shall replace a unit of the same model for Party A within 24 hours, and the replacement cost shall be borne by Party B. ..
4. Party A is responsible for providing diesel oil and engine oil required by the generator set.
5. During the lease period, Party B shall be responsible for the security of the unit.
Seven. Liability for breach of contract:
Any violation of this contract constitutes a breach of contract, and the breaching party shall bear the liability for breach of contract and compensate the observant party for the losses incurred.
Eight. Settlement of disputes
1、? Party A and Party B negotiate amicably;
2、? Bring a lawsuit to the people's court with jurisdiction where the project is located according to law.
Nine,? Termination of contract
1、? Party A and Party B can terminate the contract through consultation.
2、? In any of the following circumstances, Party A and Party B may terminate the Contract:
( 1)? Due to force majeure, the contract cannot be performed.
(2)? Due to Party B's suspension of construction or serious operational difficulties, the Contract cannot be performed due to bankruptcy and liquidation.
(3)? Other dissolution conditions agreed in this contract appear or the contract dissolution clauses stipulated by law are established.
3、? If one party requests to terminate the contract, it shall send a notice of termination to the other party in writing. When the notice reaches the other party, the contract will be terminated. Disputes over the termination of the contract shall be handled according to the provisions of Article 8.
4、? Party B shall start to withdraw from the Contract within 3 days after receiving Party A's notice of termination of the Contract, and complete the withdrawal within 5 days after the start of withdrawal. In case of late exit, Party A has the right to forcibly clear the site, and the losses caused thereby shall be borne by Party B. The materials, equipment and facilities left by Party B at the construction site shall be deemed as abandonment of ownership, and Party B agrees to be disposed of by Party A.. ..
5、? After the termination of the contract, the validity of the settlement and liquidation clauses agreed by both parties in this contract will not be affected.
Ten,? other
1、? For matters not covered in this contract, both parties shall reach a supplementary agreement through friendly negotiation, which has the same legal effect as this contract.
2、? This contract is made in duplicate, one for each party, with the same legal effect.
3、? This contract shall come into effect as of the date of signature and seal by both parties.
Party A: _ _ _ _ _ _ _ _ _? Party B: _ _ _ _ _ _ _ _ _
Signing Representative: _ _ _ _ _? Signature Representative: _ _ _ _ _ _
Date: _ _ _ _ _ _? Date: _ _ _ _ _ _ _
Regarding Article 2 of the lease contract for bioengineered generators, the lessor (hereinafter referred to as Party A): _ _ _ _ _ _
Lessee (hereinafter referred to as Party B): _ _ _
Through negotiation between both parties, Party B rents two generators (model _ _ _ _ _ _ _) from Party A for the site use of Party A's expansion project. In order to clarify the responsibilities and obligations of both parties, this agreement is hereby signed.
Article 1 Party A's responsibilities
1. 1 Party A must provide Party B with generator sets with good performance to meet the power supply needs of site construction.
1.2 Party A must be equipped with two qualified certified operators, who are responsible for the maintenance and repair of the units on the construction site to ensure the normal operation of each unit, and the maintenance expenses shall be borne by Party A. The on-site operators must abide by the relevant operating procedures and on-site rules and regulations, and be responsible for the safety of the generators leased by Party B. Party B will not bear any responsibility for the loss or damage of the units on site.
1.3 Party A is responsible for properly keeping the unit fuel purchased by Party B and transported to the site (lubricating oil is purchased by Party A) to ensure that the fuel is not lost or leaked; In case of loss or leakage, Party A shall compensate the price and bear all losses caused to Party A from it.
1.4 Party A must obey the fuel registration system of Party B's on-site units, so that the units can operate normally and the fuel consumption can be known fairly well. It is forbidden for generators to generate electricity with oil consumption and no load; If Party B's unit generates electricity with no load for more than half an hour, it will be fined _ _ _ _ _ yuan for each discovery.
1.5 party a is responsible for the mobilization, hoisting and transportation safety of the unit, and the mobilization, hoisting and transportation expenses shall be borne by party a. ..
1.6 After the lease expires, Party A must safely evacuate all units leased by Party B from the site within three days, and the appearance fee shall be paid by Party B to Party A in the amount of RMB.
Article 2 Party B's responsibilities
2. 1 Party B is responsible for the leveling and stability of the unit site. Be responsible for the accommodation of the on-site crew management personnel dispatched by Party A. ..
2.2 Party B guarantees that it will not be used in harsh environment (such as storm). In the process of use, if there is any fault, inform Party A for maintenance in time, and don't disassemble it at will.
2.3 During the lease period, the fuel consumed by the unit shall be purchased by Party B and transported to the site, and Party A shall be responsible for keeping it, and Party B shall conduct random inspection at any time.
Article 3 Method of settlement
3. 1 The lease period of the generator set is _ _ _ _ _ months, and the rent shall be calculated on a daily basis for less than one month, and the lease time shall be calculated according to the actual use time.
3.2 The lease period starts from the date of commissioning of the unit and ends on the date of shutdown. The rent is settled at RMB per set per month, and the above rent has included the salary and other expenses of Party A's operators. Party A receives the project payment with the duty-paid invoice.
3.3 After the signing of this agreement, Party B shall pay RMB yuan in advance as the unit deposit, and deduct the corresponding amount of rent at the time of settlement.
3.4 Each generator provided by Party A must meet the electricity demand of Party B's construction site. If Party B stops working on the construction site for more than one hour due to the failure of Party A or the generator, it will be fined 65,438+0,000.00 yuan per hour.
The terms of the above agreement shall be observed by both parties and shall not be violated. This agreement is made in duplicate, each party holds one copy, which has the same legal effect. After the lease term ends and the accounts are settled, the agreement will automatically become invalid.
Attachment: Registration Form for Fuel Consumption of On-site Rental Generator
Person in charge of Party A (signature): _ _ _ Person in charge of Party B (signature): _ _ _
Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 3 of the Bioengineering Generator Leasing Contract: Party A (lessee): Shaanxi Chiayi Lande Bioengineering Co., Ltd. Party B (lessor): Generator Leasing Service Department of Wei Hong, weiyang district, xi.
Through friendly negotiation, Party A and Party B have reached the following agreement on Party A's lease and use of Party B's generator set, and hereby conclude this contract for compliance.
I. Quantity and model of the contract price of the leased generator set:
The total contract price (including tax) is RMB ten thousand yuan only (¥ 10000 yuan), the generator is the rental fee, and the automatic starting cabinet is the purchase fee of Party A. ..
The above-mentioned monthly fee for generators has included all expenses such as generator set maintenance fee, workers' basic salary, overtime pay, five insurances and one fund, salary subsidy, mobile construction subsidy, rent subsidy, catering fee, employee welfare, labor protection fee, taxes and fees, profits, Party B's management fee, unforeseen expenses, personnel transportation fee and safety.
The automatic starting cabinet is the equipment fee and installation fee, and the ownership belongs to Party A after Party A pays the purchase fee.
Second, the lease term:
The lease term starts from the day after the generator set arrives at the place of use and is installed (subject to the date confirmed by Party A in writing) and ends the day before Party A returns the generator. The lease term is tentatively set at one month (the lease is completed after Party A's fire control acceptance).
Three. Handover conditions of generator set:
1. Party A is responsible for the transportation expenses of the generator set to the place of use and the expenses of hoisting the generator set to and from the place of use.
2. Party B shall be responsible for providing all maintenance expenses for the running units.
Four. Place of use:
Zhouzhi Jixian Industrial Park Shaanxi Jiayi Lande Bioengineering Co., Ltd. Factory.
Verb (abbreviation of verb) rent, payment period and payment method:
1. Both parties reach an agreement through consultation that Party A shall pay Party B RMB 7,000 before the delivery of the generator.
2. After the generator lease is completed and Party B provides all invoices, Party A will pay Party B the remaining 3,000 yuan. 3. The lease term is tentatively set at one month, subject to the completion time of Party A's fire inspection and acceptance, and the total contract amount will not be increased or decreased for less than one month or more. Rights and obligations of intransitive verbs;
1. Party B shall send management personnel to Party A to be responsible for the normal power generation of the generator set, and Party B shall be responsible for the accommodation and transportation expenses of the management personnel sent by Party B during the service period.
2. During the lease period, if the generator set fails, Party B shall be responsible for the maintenance and bear the expenses. If the generator set is shut down for more than 3 times in a week due to non-user reasons, the generator set should be replaced.
3. If the unit is not shut down for more than 24 hours, Party B shall replace a unit of the same model for Party A within 24 hours, and the replacement cost shall be borne by Party B. ..
4. Party A is responsible for providing diesel oil and engine oil required by the generator set.
5. During the lease period, Party A shall be responsible for the integrity of the unit.
Seven. Liability for breach of contract:
Any violation of this contract constitutes a breach of contract, and the breaching party shall bear the liability for breach of contract and compensate the observant party for the losses incurred.
Eight. Settlement of disputes
1, both parties negotiate amicably;
2. Bring a lawsuit to the people's court with jurisdiction where the project is located according to law.
Nine. Termination of contract
1. Party A and Party B can terminate the contract through consultation. 2. In any of the following circumstances, Party A and Party B may terminate the contract: (1) The contract cannot be performed due to force majeure.
(2) Other dissolution conditions agreed in this contract appear or the contract dissolution clauses stipulated by law are established. 3. If one party requests to terminate the contract, it shall send a notice of termination to the other party in writing. When the notice reaches the other party, the contract will be terminated. Disputes over the termination of the contract shall be handled according to the provisions of Article 8.
4. After the termination of the contract, the validity of the settlement and liquidation clauses agreed by both parties in this contract will not be affected.
X. others
1. For matters not covered in this contract, both parties shall reach a supplementary agreement through friendly negotiation, and the supplementary agreement shall have the same legal effect as this contract.
2. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively, all of which have the same legal effect. 3. This contract shall come into effect as of the date of signature and seal by both parties. After the lease is completed and the expenses are settled, the contract is fulfilled.
Party A: Shaanxi Chiayi Lande Bioengineering Co., Ltd. Party B: xi weiyang district Wei Hong Generator Leasing Company.
Signature representative:
Date: 20__ Service Department
Bank of deposit: Xi Anwenjing Community Sub-branch of China Construction Bank
Account number: 6227078 18 1009697.
Account Name: Wen Yongjun Signature Representative: 20__ _
Date:
Article 4 The lease contract of the lessor of bioengineered generators: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Lessee: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Place of signing the contract:
On the basis of voluntariness, equality and mutual benefit, Party A and Party B have reached the following contract on Party B's lease of Party A's diesel generator set through consultation:
Description of the leased equipment:
Party A leases its legally owned diesel generator set, diesel generator set and diesel generator set to Party B for use.
Party A shall provide accessories of diesel generator set: starting battery platform and exhaust muffler system cover.
The fuel and cooling water used by the diesel generator set shall be provided by Party B, which is not within the lease scope of this contract.
Lease term:
The lease term of diesel generator set is * * * days, starting from.
After the lease expires, Party A will take back all the equipment. If Party B needs to renew the lease, it must propose to Party A days in advance.
Payment method of rent:
The daily rent of the equipment is RMB.
The equipment deposit is RMB, and the guarantee method is.
Party B shall pay the full rent before Party A provides the unit to Party B..
Use of leased equipment:
The environment in which Party B uses Party A's diesel generator set must comply with the provisions of 2820-97. Party A and Party B agree to determine the installation location of the unit.
Party B is responsible for the transportation, hoisting, wiring and cable connection of the equipment.
When Party B uses the equipment provided by Party A, its load shall not exceed the power value specified in the contract.
Party B shall not modify the unit by itself.
Without the consent of Party A, Party B shall not sublet or sublet the unit without authorization.
Rights and obligations of both parties:
Party A shall deliver the units leased by Party B to Party B for use within the time stipulated in the contract.
Party A shall ensure the normal use of the unit and be responsible for its maintenance.
Party B shall pay the rent at the time stipulated in the contract.
During the lease period, Party B shall take good care of the unit to prevent man-made damage or destruction.
When the unit enters Party B's site, Party B shall be responsible for the safe positioning, connection and disassembly of the unit.
Other terms:
This contract shall come into effect after being signed and sealed by both parties.
This contract is made in quadruplicate, with each party holding two copies, all of which have the same legal effect.
Party A: Innovation Management Department of Zhonglian Li Fen Automobile Company Party B:
Seal: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Date: _ _ _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Phone number: _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ Phone number
Article 5 of the lease contract for bioengineered generators Party A:
Party B:
Because of Party B's construction needs, we lease the generator set from Party A. Based on the principle of good faith and mutual benefit, both parties reach the following agreement:
1. Party A provides diesel generator sets for lease to Party B .. (Note: total value of leased units:)
2. The lease term is at least/day), and the rent is/day/set (in words: RMB only) (Note: the lease term expires according to the actual number of days/day/set).
3. During the lease period, without the consent of Party A, Party B shall not sublet, lend or buy or sell the equipment ... If anything is lost, Party B shall be responsible for the total value of the corresponding unit.
4. Party A is responsible for the engine oil used for the first time during the lease period, and Party B is responsible for the replacement time of engine oil and diesel oil. If the diesel engine unit is damaged due to the quality problem of diesel oil provided by Party B, Party B shall bear the corresponding responsibilities.
5. Payment method: Party B pays one month's rent in advance, and charges the second month's rent at the same time in the next month. If Party B fails to pay on time, Party A has the right to request to stop the right to use the generator set.
6. Party A is responsible for the import and export of equipment, and Party B is responsible for paying the corresponding import and export fees.
7. Party A is responsible for the basic maintenance of the equipment, and Party B guarantees that Party A has two days of unit maintenance time every month. It is forbidden for Party B to overload the generator set, and Party B shall be responsible for the loss of the generator set caused by the illegal operation of Party B's personnel.
8. The four parties shall be responsible for the operation of the equipment, and Party A shall be responsible for the maintenance when the machine fails (the failure cannot be eliminated on the same day, and Party A shall replace the generator set the next day to ensure the normal use of Party B).
9. The matters not mentioned above shall be settled by both parties through friendly negotiation, and any dispute shall be arbitrated by Party A's court. ..
10. This contract is made in duplicate, with each party holding one copy.
Party A:
On behalf of:
Telephone:
time
sun
Party B: Representative: Tel: MM DD YY.
Article 6 Lease contract of biological engineering generator lessor: (Party A)
Lessee: _ _ _ (Party B)
According to the Contract Law of People's Republic of China (PRC), Party A and Party B signed an equipment lease contract and reached an agreement on the following terms for both parties to abide by:
1. Party A signs a contract for Party B to lease Party A's kilowatt diesel generator set according to Party B's requirements and the equipment and technical quality standards selected by Party B..
Description of the equipment: Party A rents the kilowatt diesel generator set it owns to Party B for use. Fuel, coolant and supplementary lubricating oil for KW units, batteries, silencers, oil-water separators and diesel generator sets shall be provided by the Lessee (Party B). (In order to ensure the quality of lubricating oil, the lubricating oil must be the same as that of Party A, or Party A can provide lubricating oil, and Party B will pay Party A according to the final use. ). The air filter, diesel filter, oil filter and lubricating oil regularly maintained by Party A shall be provided by Party A. ..
2. Party A shall bear the freight according to the equipment lease contract signed with Party B. ..
Three. The environment in which Party B uses Party A's diesel generator set must comply with GB2820-97, and necessary ventilation environment and rainproof measures shall not exceed 80% of the rated power on the nameplate. (Note: When the power of a single motor is greater than 55KW, it should have a necessary step-down starter or autotransformer. The sum of the total power of motors greater than 55KW should not exceed 70% of the rated power, and the motors should be started separately. )
4. If the generator set is found to be faulty during use, it shall be stopped in time and notified to Party A for maintenance. During the operation of Party B's self-provided generator set, there should be someone to look after it, check the water level and oil level in time, and replenish it in time. Party B shall not forcibly operate with illness. If the fault is enlarged due to Party B's reasons, Party B shall bear the responsibility. When in use, the three-phase load should be used in a balanced way, and no phase is missing. Party B is responsible for the installation and use of the equipment. After the generator sets arrive at Party B's construction site, Party B shall be responsible for hoisting and loading and unloading. Party A is responsible for debugging and maintenance. Party A shall not bear the losses caused by unit failure, and the monthly equipment maintenance time shall not exceed 2 days. If it cannot be repaired within 2 days, Party A can arrange replacement in advance.
5. The ownership of the equipment during the lease period belongs to Party A. If Party B fails to perform as stipulated in the contract, Party B shall compensate the hoisting damage, overload, rain and man-made damage according to the price.
6. During the lease period, the ownership of the equipment belongs to Party A, and Party B has the right to use it. Party B shall not sublet, transfer or mortgage the property at will, and shall not add or remove any parts of the equipment or relocate the installation site. Parts damaged due to Party B's improper operation and use (including cylinder pulling, shaft clamping, tile burning, fuel injection pump stuck, nozzle burning, supercharger bearing burning, motor flooding, motor sweeping and boring being involved in foreign bodies, etc.) shall be repaired or compensated according to the price.
7. The lease period starts from the date when Party A's goods arrive at Party B and ends when Party B no longer uses them. The minimum lease term is one month, and the monthly rent is RMB (in figures) only. If the lease term exceeds a whole month, the rent for the excess part shall be calculated separately at the unit price equivalent to the day. After the lease expires, Party A will take back all the equipment.
Eight. Rent settlement method: the payment agreement in Article (1) shall apply.
1. Party B shall pay Party A an advance payment of RMB for equipment, and refund more and make up less when leaving the site.
2. The rent shall be paid in one lump sum according to the promised lease term, and the rent shall be calculated separately after the deadline.
3. Party B shall pay the rent in February in advance, and the rent shall be paid monthly, and the overdue period shall not exceed 7 days.
9. All disputes related to this contract shall be settled by both parties through friendly negotiation in accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws. If negotiation fails, the case shall be submitted to the Hantai District Court of Hanzhong City.
X this contract is made in duplicate, one for each party, and shall come into effect as of the date of signature and seal by both parties. (Fax also has legal effect)
Eleven, the above unit price, if invoiced, will be taxed at 4.5%.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 7 The lease contract of the biological engineering generator lessor (hereinafter referred to as Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Lessee (hereinafter referred to as Party B): _ _ _ _ _ _ _ _ _ _ _ Project Management Department
Through negotiation between both parties, Party B leases two generators * * * with model of _ _ _ _ _ _ _ _ KW from Party A for use by _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 1 Party A's responsibilities
1. 1 Party A must provide Party B with generator sets with good performance to meet the power supply needs of site construction.
1.2 Party A must be equipped with two qualified certified operators, who are responsible for the maintenance and repair of the units on the construction site to ensure the normal operation of each unit, and the maintenance expenses shall be borne by Party A. The on-site operators must abide by the relevant operating procedures and on-site rules and regulations, and be responsible for the safety of the generators leased by Party B. Party B will not bear any responsibility for the loss or damage of the units on site.
1.3 Party A is responsible for properly keeping the unit fuel purchased by Party B and transported to the site (lubricating oil is purchased by Party A) to ensure that the fuel is not lost or leaked; In case of loss or leakage, Party A shall compensate the price and bear all losses caused to Party A from it.
1.4 Party A must obey the fuel registration system of Party B's on-site units, so that the units can operate normally and the fuel consumption can be known fairly well. It is forbidden for generators to generate electricity with oil consumption and no load; Party B will be fined _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1.5 party a is responsible for the mobilization, hoisting and transportation safety of the unit, and the mobilization, hoisting and transportation expenses shall be borne by party a. ..
1.6 After the lease expires, Party A must safely evacuate all units leased by Party B from the site within three days, and the appearance fee shall be paid by Party B to Party A in the amount of RMB.
Article 2 Party B's responsibilities
2. 1 Party B is responsible for the leveling and stability of the unit site. Be responsible for the accommodation of the on-site crew management personnel dispatched by Party A. ..
2.2 Party B guarantees that it will not be used in harsh environment (such as storm). In the process of use, if there is any fault, inform Party A for maintenance in time, and don't disassemble it at will.
2.3 During the lease period, the fuel consumed by the unit shall be purchased by Party B and transported to the site, and Party A shall be responsible for keeping it, and Party B shall conduct random inspection at any time.
Article 3 Method of settlement
3. 1 The lease term of the generator set is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
3.2 The lease period starts from the date of commissioning of the unit and ends on the date of shutdown. The rent shall be settled at RMB 0/50kW per set per month, and the above rent has included the salary and other expenses of Party A's operators. Party A receives the project payment with the duty-paid invoice.
3.3 After signing this agreement, Party B shall pay RMB as the unit deposit to Party A, and deduct the corresponding amount of rent at the time of settlement.
3.4 Each generator provided by Party A must meet the electricity demand of Party B's construction site. If Party B stops working on the construction site for more than one hour due to the failure of Party A or the generator, it will be fined _ _ _ _ _ _ yuan per hour.
The terms of the above agreement shall be observed by both parties and shall not be violated. This agreement is made in duplicate, each party holds one copy, which has the same legal effect. After the lease term ends and the accounts are settled, the agreement will automatically become invalid.
Attachment: Registration Form for Fuel Consumption of On-site Rental Generator
Person in charge of Party A (signature): _ _ _ Person in charge of Party B (signature): _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _