Prevent and reduce disasters, and start a happy life every day. In order to minimize the harm caused by accidents, we should make emergency plans and improve our awareness of prevention. What good emergency plans are worth learning? In the column, I specially arranged the emergency treatment plan for sudden power failure from the network for reference only. Let's take a look. Work plan for emergency treatment of sudden power failure 1
1. Water cut:
1) First, find out the reason of water cut, and determine whether it is the external network water cut or the hotel water supply equipment problem;
2) If the external network stops water supply, the manager, the company's engineering department, the competent deputy general manager and the general manager shall be informed immediately;
3) get in touch with relevant units in time to determine the time of water supply and water supply, so that the company leaders can make corresponding decisions;
4) Maintenance personnel are on duty in the water pump room, and pay close attention to the water level of the water tank and the operation of the equipment; Do a good job of guest explanation and temporary water supply arrangement;
5) Inform the store manager, the company's engineering department and get in touch with the equipment supply and maintenance unit to talk about the cause of equipment failure and the damaged parts and extent, etc.
6) Organize personnel and prepare materials in advance, and take corresponding measures immediately after receiving instructions from superiors to ensure the normal operation of the hotel.
2. Power outage:
1) If there is power outage in the external network, contact the power supply department immediately to confirm the nature of the power outage;
2) it shall be reported to the general manager of the hotel and the engineering department of the company immediately;
3) Maintenance personnel should arrive at the front desk in time, contact the elevator with walkie-talkie to confirm whether the elevator is closed. If the elevator is closed, it should be operated according to the elevator fault release procedure;
4) Maintenance personnel should bring communication tools, maintenance tools and emergency lighting, patrol and inspect key parts such as boiler room, water pump room, elevator room, power distribution room and lobby, and inform the front desk of their location at any time to ensure smooth communication;
5) cut off the switches of each branch of the power distribution cabinet to prevent equipment and personal injury caused by sudden calls; When the power failure is caused by the power distribution failure in the hotel, find out the location and cause of the failure, disconnect the power supply of the faulty equipment, restore the power supply of the non-faulty parts, and reduce the affected area;
6) protect the site, take proper measures, report in time and contact the relevant units;
7) After the fault treatment, it is verified that there is no abnormality in the equipment before the phase power supply can be resumed, and the operation of the inspection equipment should be strengthened;
8) illegal operation is strictly prohibited, and important equipment must be handled by professionals;
In case of the above situation, equipment accidents must be recorded to facilitate the investigation of accident causes and the improvement of working procedures. Work plan for emergency treatment of sudden power failure 2
In order to test and improve the emergency plan for power failure, improve nurses' awareness of sudden power failure, enhance their emergency handling ability in case of sudden power failure, further clarify the responsibilities and tasks of relevant departments and personnel, and improve the emergency mechanism. At 14: 11 p.m on October 31th, the nursing department organized all departments in the hospital to conduct an emergency simulation drill of sudden power failure. The head nurses of all departments and some nursing staff participated in the drill, and the drill scene was set in the respiratory ward.
before the drill, the nursing department worked out the script of "emergency simulation drill for sudden power failure" in the hospital, and made a clear division of labor on the equipment after power failure, electronic medical record system, who will be responsible for the treatment and nursing of critically ill patients and ordinary patients, and how the head nurse will command and coordinate, which changed the previous work mode that nurses A, B and C were responsible for the drill, and ensured that the participants would not be different during the drill, resulting in the homogenization of the drill effect.
the drill started at 14: 11. The main nurse informed: "The department suddenly lost power". Call the General Affairs Section immediately, ask for inspection and maintenance, and report to the director and head nurse. The director of the department and the head nurse instructed to start the emergency procedure of power failure immediately, and the responsible class checked the critically ill patients to ensure the normal use of the life support system equipment; The treatment class should do a good job in treating other patients in the ward, pay attention to observing the changes of patients' condition, and cooperate with doctors to appease patients and their families; The nurses in the main class should do a good job in the paper version of the patient's doctor's orders and patrol the stairs, corridors and duty room lines in the ward to prevent fires. After the general affairs department informed that the power system could not return to normal within 2 hours, the head nurse requested the equipment department to allocate life support system equipment to ensure the rescue of critically ill patients.
after the power supply is restored, the nurse in charge of the main shift informs the staff in each shift to turn on the power supply of instruments, equipment and computers and check the operation of instruments. And report to the head nurse that there are 38 patients in the ward, including 5 critically ill patients. During the power outage, the patient's condition is stable, and the instruments are running well. The paper version of the doctor's advice has been added to the electronic information system, and no abnormalities have occurred.
After the drill, Comrade Gao Hongzhen, the director of the nursing department, commented on the drill. She said that the overall process of the drill was smooth, the responsibilities of each class were clear and the cooperation was close, and the nurses mastered the waiting time of the battery of the life support system equipment, and they were able to drill according to the script in advance, achieving the expected purpose. However, it is also found that some storage batteries of life support system equipment have been damaged and cannot be used normally, and it is proposed that everyone should check and repair the equipment in the department regularly to ensure that it is in standby state at all times.
Through this drill, the ability of nurses in our hospital to deal with sudden power failure was tested. Improve the emergency response speed and handling ability of nursing staff to sudden power failure events; And have a certain understanding of the performance of different types of life support systems and the situation of battery waiting for power, and have mastered the performance of various instruments in the department; The emergency drill plan of the hospital was improved and the purpose of the drill was achieved. Work plan for emergency treatment of sudden power failure Part 3
1. Purpose of the exercise: < P > To improve the ability to deal with sudden power failure and ensure the normal development of medical work.
second, the exercise content:
quickly switch the power outage department caused by the failure of Chang 1 transformer, and supply power by Chang 2 transformer.
3. Exercise time: 21xx, May 31th, 13: 31 p.m.
4. Exercise place: outpatient building, inpatient building, and high allocation room.
V. Emergency Command Team:
Chief Commander:
Deputy Commander:
VI. Team leader:
Deputy Team Leader:
Team members: Engineering Department and Security Department
VII. Preparation before the drill:
Inform all power outage departments of the drill plan and prepare emergency lights.
VIII. Description of the exercise:
On May 31th, 21xx, the Chang 1 transformer in the high-rise room suddenly broke down, which led to power outages in many departments of the outpatient building, the medical technology building and the inpatient building. The property engineering department quickly carried out emergency repairs according to the plan. After 15 minutes, the power supply was switched to Chang 2 transformer and resumed. (This exercise will not affect the operating room, hemodialysis room, ICU and other key departments, because these departments are equipped with terminal automatic switching equipment, which can automatically switch to Chang 2 transformer instantly in case of emergency to ensure normal power supply)
IX. Exercise procedure:
1. The commander-in-chief announced the start of the exercise.
2. The fault light of the transformer in the high distribution room is turned on, and the staff quickly reported it to the logistics support department and the property supervisor, and at the same time carried out emergency repair.
3. After receiving the report, the Logistics Support Department immediately commands the security center, and sends out a notice of sudden power failure by using the public broadcasting system to inform the medical staff in the emergency department and ward to maintain order. Carry out comforting publicity to stabilize the mood of patients or their families in the emergency room and elevator (the implementation of the elevator trapped plan).
4. after receiving the notice, six staff members of the engineering department were divided into three groups, and entered the high-level room and the general high-level room of the gatehouse and the inpatient building respectively, and switched the power supply transformer from normal 1 to normal 2, resumed power supply, and conducted troubleshooting on normal 1.
5. The elevator squad is responsible for the inspection of each elevator.
6. The security guard is responsible for outpatient and emergency inspections.
7. Fill in the emergencies afterwards and report them to the hospital.
11. Precautions:
1. The preparation before the exercise should be sufficient, and the publicity work should be in place.
2. The electrician should switch the power supply in strict accordance with the operating procedures. Work plan for emergency treatment of sudden power failure 4
The library is an important public place for the school to serve teachers, students and readers, with thousands of people entering and leaving every day. Library access control system, equipment operation, elevator up and down and computer system management all depend on uninterrupted power supply, and there is no temporary power outage predicted in advance, which will cause great hidden dangers to book asset management and personnel safety. This emergency plan is specially formulated, and it will be operated according to the standard when the time comes.
1. Personnel are in place
1. The security guard on duty is responsible for telephone consultation on the power outage, and the telephone number is omitted
2. When there is a temporary power outage during the day, the directors of all departments and offices should rush to the relevant window units as soon as possible. If some windows are short of staff, the library leaders and offices should dispatch personnel from non-window departments and offices to supplement them in time.
3. There is a temporary power outage during the day. If the call time cannot be determined, the staff in each post should wait for the call after the reader leaves the library. In case of power failure at night, after the readers leave the library, the staff at all levels can only leave the library after confirming that no one is staying in the library and the power supply is safe.
4. when there is a temporary power outage at night, the personnel on duty at each post shall cooperate to implement the steps of this plan.
5. in case of emergency or special circumstances, ask the library office.
omitted
2. Access control in the lobby
1. Show the "power failure" sign at the entrance.
2. Close the entrance immediately, and guide the readers to get out but not in.
3. The personnel on duty or security guards should guard the entrance guard to prevent them from going out without borrowing books.
4. When there is a temporary power failure in the evening, the library staff will immediately organize the readers to leave the library and ask them to leave the library within 15 minutes; When there is a temporary power outage during the day, readers are required to leave the library within 91 minutes.
5. The staff in the hall and stacks should explain to the readers.
Third, the book lending and returning office
1. Show the "power failure" sign.
2. When there is a temporary power failure at night, stop borrowing and returning books immediately.
3. when there is a temporary power outage during the day, stop borrowing and returning books after 31 minutes. Note: Unmagnetized books are placed separately.
iv. reading areas and working areas
1. the staff on duty should stick to their posts, and those who leave temporarily for some reason should quickly return to their original working areas.
2. Strengthen the patrol, inform the readers and guide the readers to leave the library according to the time specified above.
3. Both foreign language reading area and newspaper reading area should pay attention to the management of entrances and exits.
4. The digital information retrieval center should close the account as soon as possible and close the server.
5. The service desks and information desks on all floors are equipped with large rechargeable flashlights to disperse lighting.
6. The editorial department stops the computer operation in hand in time, arranges other manual work, or assists other departments according to unified scheduling.
V. Lighting, elevator and voice system
1. At night, the personnel on duty at all levels should pay attention to whether the lighting emergency is bright or not, and if it is not, use accurate language to remind readers to remain calm; Timely guide readers to evacuate to the corridor and hall where the lights are on at the stairs to prevent crowding and trampling.
2. Promptly guide the personnel stranded in the elevator to evacuate, knock on the door and tell those who have not evacuated to stay calm and carry out rescue.
3. The staff of each hall and library should confirm whether the water and electricity are turned off when they leave.
4. The manager of the central control room adjusts the language system to the manual control file, and dictation prompts.
5. The security guards should make a patrol after the museum is closed to avoid people staying in the museum, and check whether the water and electricity switch is turned off. Work plan for emergency treatment of sudden power failure 5
Emergency measures after power failure:
1 When the attendant in the power distribution room finds power failure, he shall promptly notify the engineering supervisor of the management office.
2. The engineering supervisor should go to the site immediately, organize the electrician on duty to check the status of the power system, and report to the management office director in time;
3. When the external fault causes the main power supply to be out of power;
1. The electrician on duty should check whether the sign of the vacuum switch is off, and then check the voltage and indicator light. When it is clear that there is voltage loss and power failure, the vacuum switch of the incoming cabinet of the main power supply should be withdrawn according to the requirements of the Electric Industry Regulations, and the sign "No closing is allowed when someone is working" should be hung.
2. The electrician in the duty room reports to the dispatching room of the power supply bureau and understands the external power outage;
3. The engineering supervisor shall report the situation to the management office manager in time, and propose to enable the standby power supply. After being approved by the management office director, he shall explain the reason for the power outage to the owner by telephone and remind the owner to be prepared for the call;
4. The engineering supervisor requires the electrician on duty to be prepared for operation. According to the "electric power regulations" on the standby power supply;
5. Check whether the equipment runs normally and whether the power outage area has returned to normal;
6. After the normal power supply is restored, report to the management office director in time;
7. Record the whole process of the accident in detail (power outage time, report time, name of the receiver, report data, departure time, cause of the accident, etc.);
8. When the main power supply fails due to internal fault;
9. The engineering supervisor shall organize mechanical and electrical inspection of the power system fault causes and timely repair;
11, strengthen the security patrol in the electric area;
11. The engineering supervisor shall report the situation to the director of management office in time, and after the approval of the director of management office, he shall explain the reason to the user by telephone and remind the user to be ready for the call;
12. The engineering supervisor requires the electrician on duty to be prepared for operation, and conduct power transmission operation according to the Regulation on Electric Industry;
13, check whether the equipment is running normally and whether the power outage area has returned to normal;
14, after the normal power supply is restored, report to the management office director in time;
15. Record the whole process of the accident in detail (power outage time, report time, name of the receiver, report data, departure time, cause of the accident, etc.). 6
As there is only one-line power supply in our school at present, it may cause power outage on campus when power supply is tight or there is an emergency. In order to prevent campus safety accidents due to power outage and ensure the personal safety of all teachers and students at school, The emergency plan for power failure in our school is specially formulated for everyone to learn. In case of power failure, all departments can respond quickly, perform their duties and maintain good order.
First, the leading group for emergency treatment of power failure safety accidents
Group leader:
Deputy leader:
Members: campus hydropower group staff
Second, the responsibilities of the leading group for safety emergency
1. Establish preventive measures; 2. Strengthen emergency education; 3, timely and effectively solve emergencies; 4, clear responsibilities, to assist.
Responsibilities of the leader of the leading group:
① Decide the start and termination of the emergency plan for accidents.
② Unified leadership of accident emergency rescue work, determination of on-site commanders, and mobilization of emergency teams and resources.
(3) to public security, fire control,