What is the process sequence of old house decoration?

The renovation of old houses is a very complicated project, so let's take a look at the order of house renovation.

step 1: change the water supply and heating, including the adjustment of the position and layout of water pipes in the kitchen and bathroom. According to the principle of ergonomics, the height and position of water pipes often have to be changed greatly. For example, the access height of water pipes in toilets may not be the same as the reserved height.

electricity, mainly considering the transformation of electrified lines. Change the position and quantity of switches and sockets to make them more reasonable.

warm, central heating or floor heating. Need to be designed in advance.

the reason why water and electricity heating is listed as the first step is that if the preliminary consideration is not thorough, it will lead to inconvenience in construction.

Step 2: Floor tiles and wall tiles

After the water, electricity and heating are adjusted in the first step, the floor tiles and wall tiles need to be paved.

step 3: ceiling of the house

ceiling of the living room, bedroom, study, dining room, kitchen, bathroom and balcony.

Step 4: Cover the door and the mouth

Decorate the door and window, including the production of some furniture ornaments, such as porch treatment, TV background wall production and so on.

step 5: wall painting

wall painting can be done by painting, wallpaper, wall cloth, etc.

Step 6: Primer and topcoat

Paint the doors, windows and some furniture with primer and topcoat.

step 7: lighting installation

install all indoor lamps, including all kinds of ceiling lamps, downlights, chandeliers, spotlights and so on.

step 8: ventilation and cleaning

keep good ventilation conditions and sufficient ventilation time.