Safe and civilized construction technical scheme?
What is the specific content of the technical scheme for safe and civilized construction? Zhong Da Consulting will answer your questions below.

The project department established the guiding principle of "safe production and civilized construction" at the beginning of construction. According to the Standard for Safety Inspection of Building Construction (JGJ59-99) and the specific requirements of the Provincial Construction Department and the Municipal Safety Supervision Station, the project department has made comprehensive arrangements from the aspects of personnel organization, measures formulation and fund raising to ensure that the site meets the requirements of safe and civilized construction.

First, seven keys to ensure safe and civilized construction:

1. Leadership is the key to ensure safe production and civilized construction.

At first, the project department gave all-round education and guidance to the managers in terms of ideology, management organization and measures formulation and implementation, and established the guiding ideology of "safety and civilized construction must be managed in production management" and "safety and civilized construction is everyone's responsibility", so that the abstract management consciousness and specific management effect of the managers in all departments of the project department can reach a harmonious state, thus guiding the actual safety and civilized construction work according to local conditions and making it a reality.

2, to ensure safe production and civilized construction, management system, organization is the key.

In the case of mature management thoughts of project department managers, the project department established a safety and civilized construction management system with the project manager as the first responsible person, and established and improved a safety management organization with full-time and part-time safety and civilized builders as the line and members of each team as the net. It has achieved a clear division of labor, the responsibility lies with people, and everything is in charge. According to the actual situation of the construction site, perfect rules and regulations and related safety technical measures have been formulated, which provides a good foundation for safe production and civilized construction.

3. Hardware is the key to ensure safe production and civilized construction.

While paying attention to ideological construction, the project department also attaches great importance to the hardware construction of the construction site. Although the project funds are very tight, we still actively raise funds to ensure that the funds for on-site hardware construction are in place first. Only civilized walls, construction sites, kitchens, toilets, shower rooms, dormitories, ground hardening, white walls and other safety facilities have invested more than 70,000 yuan. In addition, safety protection articles such as double beds, gas stoves and fire extinguishers were purchased, which provided a good guarantee for the safety of workers.

4. Software is the key to ensure safe production and civilized construction.

The construction site constantly carries out safety production and civilized construction education and inspection for new workers. After the project started, our project department conducted three-level safety education and safety skills training for new entrants for many times, and formulated the assessment system. Those who fail the examination are not allowed to take up their posts. And ensure that each person has no less than 80 hours of education. In view of the actual problems in the construction site, we should educate the workers on "Five Grasps" and correcting violations, so as to keep the alarm bell ringing, completely overcome the psychology of being lucky and paralyzed, and observe the rules and discipline, and do not work illegally, hurt themselves, others or be hurt by others. In addition, adhere to professional inspection, regular inspection, regular inspection, seasonal and holiday safety inspection, timely predict, forecast and prevent unsafe factors, and timely eliminate potential safety hazards in the bud according to inspection information.

5. Standardized construction is the key to ensure safe production and civilized construction.

Because this project belongs to brick-concrete structure, the formwork is frequently used, and the risk factor is large when it is demolished. In order to reduce the risk factor in the construction process, the project department has established an application and approval system for formwork removal. The project department calculates according to the construction speed, the concrete strength growth rate (curing the concrete block under the same conditions, measuring the daily average temperature) and the design load, and then decides whether it can be demolished according to the calculation results. Then, according to the date of examination and approval, the project department will arrange the scope of work of other types of work, divide the danger warning zone of formwork removal, and designate a special person to be responsible for the warning until the formwork is removed and the neatly stacked position is cleaned up.

6. Safety education is the key to ensure safe production and civilized construction.

Team is the cell of the construction team, and it is the key factor to do a good job in safe production and civilized construction. Front-line workers have low cultural quality, poor consciousness and no awareness of safe and civilized construction. To this end, the project department uses the regular meeting time of the construction site and the practice activities of safety education before shift to educate workers on civilized construction in simple terms with the operating procedures and safety awareness of this type of work, and gradually improve their awareness of safe and civilized construction. Through effective propaganda means such as blackboard newspaper and safety information, the awareness and importance of safe production and civilized construction are publicized, so that the construction personnel can change their conscious safe and civilized construction actions into subconscious behaviors, and the civilized construction and safe production work on the construction site will always meet the standards.

7. Qi Xin's cooperation is the key to ensure safe production and civilized construction.

It is Qi Xin's concerted efforts, correct attitude, consistent goals and effective measures that can make the on-site construction personnel look energetic and energetic; In order to make the construction process conform to the rules and regulations, no illegal operation; Only in this way can the engineering quality, safety and civilized construction conditions be steadily improved and the construction environment be well protected.

Attach specific safety measures.

Second, the technical scheme to ensure safe construction

1, safety construction guarantee measures

Establish a safety assurance system and a sound responsibility system for production safety. Leaders at all levels of the project department and construction technicians should determine their own safety responsibility objectives, improve the safety assurance system and implement the project manager responsibility system.

2, on-site safety management rules and regulations

1), safety production policy: safety first, prevention first.

2), the principle of safe production "production must be safe, who is in charge is responsible for the principle". "Production must be safe, and the principle of not producing without safety". "Protect first, then build, not protect and not build". "the principle of' four don't let go' in the event of an accident".

3), pay special attention to safety education.

4) Safety education is mainly based on positive experience introduction. Three-level education and all-staff education shall be given to new workers, and three-owned education cards shall be established. Only after passing the examination can they take up their posts. For job transfer, it is necessary to carry out job transfer education, strengthen the regular safety education for migrant workers, and constantly improve the self-protection ability of employees.

5), in the training work, give priority to with special work to promote training, adhere to the principle of training first, then show certificates, no work permit, are not allowed to be engaged in this position.

6), completes the safety technical measures disclosure, task list, must write safety precautions, do oral disclosure and written delivery.

7), strengthen the safety inspection

(1). Strengthening safety inspection is an important link in implementing safety standards. In addition to the quarterly inspection of the company and the monthly inspection of the branch, the project department will also carry out the daily inspection of the builder, team leader, safety officer and attendant, the inspection before the statutory holidays, and the professional inspection of construction electricity, tower crane, construction elevator, hoist hanger and temporary facilities.

⑵. Rectification feedback, check and rectify the problems found with the gray inspection notice, and make serious rectification to achieve "three implementations". Professional projects should be led and approved by professionals and construction management personnel together with the supervisor. All rectifications shall be reviewed in time, and written feedback shall be given step by step. Major hidden dangers should be dealt with immediately until measures such as shutdown, production suspension and storage are taken.

3. Safety protection

After the project enters the main body construction, it is necessary to carry out safety protection on the construction operation surface, construction passage and personnel activity place in time. This project plans to adopt the protection system of horizontal and vertical cross-cooperation. Plane protection includes safety passage, safety protection shed, working face protection and elevator wellhead protection. And facade protection includes: net protection, border protection, etc.

The main materials used for safety protection are steel pipes, safety nets, safety belts, wind ropes, bamboo basketry and other commonly used materials in the construction site. Choose according to the same position.

Temporary electricity consumption and equipment for construction shall be designed for safety protection in accordance with Technical Specification for Safety of Construction and Installation Engineering.

4, safety protection measures

1), according to the engineering characteristics, workers enter the floor construction, the passage is located around the building, the passage is erected with steel pipes and covered with bamboo basketry, both ends of the bamboo basketry are firmly bound with steel pipes and iron wires, and various safety signs and safety management systems are hung at the crossing.

2), limb protection measures

The foundation pit is maintained with steel pipes, and a steel pipe is driven every 4m or so, which is 70cm deep into the soil and 60cm away from the edge of the foundation pit. The height of the pole on the protective railing is 1.2m from the ground, the lower pole is 0.6m from the ground, and the horizontal pole is painted with yellow and black, which are eye-catching. Ladders should be erected in the upper and lower foundation pits, handrails should be erected between ladders, and signs should be hung. It is forbidden to dismantle it at will.

5, safety work discipline, fire prevention system

5. 1 On-site safety work discipline

1), personnel entering the site must abide by safety production rules and regulations and labor discipline, and illegal operation is strictly prohibited.

2) Safety helmet must be worn when entering the construction site.

3) When working high above the ground, you must fasten your seat belt.

4), the construction site, no shirtless, barefoot or wearing slippers, high heels.

5) It is forbidden to go to work after drinking.

6), special operations personnel should hold relevant certificates, unlicensed personnel are prohibited from engaging in special operations.

7), are not allowed to play in the construction site, play or touch the mechanical and electrical equipment.

8) It is forbidden to throw materials, tools and other objects down or up at the construction site.

9) All safety facilities, devices and safety signs on the construction site shall not be removed or moved at will.

10), it is forbidden to bring children into the construction site, and it is forbidden to pass in the dangerous restricted area.

5.2 site safety fire prevention system

1), all personnel entering the construction site on site must obey management, command and rules and regulations.

2) Without the permission of the security department or the person in charge of the site, all foreign employees are not allowed to enter the site.

3), the site public * * * property, workers and migrant workers from liability protection.

4) All explosives on site shall comply with the safety regulations for storage and use.

5), should strictly abide by the fire prevention system, prohibit smoking and hot work in the fire area.

6) All safety fire control facilities on the construction site shall be complete and effective, and no one shall dismantle them at will.

5.3 Fire safety measures

1), when establishing fire safety responsibility, divide the fire responsibility area.

2) Put up eye-catching fire prevention signs in the storage places of explosives such as warehouses.

3) The construction site, library and other places shall be equipped with sufficient fire-fighting facilities and equipment.

5.4 Safety protection for aerial work

Hanging baskets and hanging cages are strictly prohibited for manned aerial work.

When working at height, you must fasten your seat belt, and you should hang it high and use it low. When the seat belt has nowhere to take root, a temporary operating platform must be built.

Without the approval of the safety officer or the builder, no one is allowed to dismantle or change the protective facilities for aerial work at will.

Materials used for aerial work must be piled up smoothly and shall not hinder traffic or loading and unloading.

All objects that may fall in aerial workplaces must be removed or fixed in other ways, and the removed parts and other redundant materials and wastes must be cleaned up in time, and they are not allowed to be placed at will.

The ladder can be used to raise the height, the upper end must be fixed, and two people are not allowed to operate at the same time. When using the folding ladder, the included angle should be between 30 degrees and 45 degrees, and the middle should be fixed.

5.5 Safety protection of the hole and limb

Holes below 1.5m× 1.5m must have enough bearing fixed cover plates;

1.5m× 1.5m above the hole, two protective railings must be added around it;

The elevator wellhead must be equipped with a metal protective door with a height of not less than1.2m;

Two protective railings must be set at the edge of the floor and balcony.

5.6 Protection of temporary electricity use

1), the temporary electricity consumption on the construction site shall be implemented in accordance with the Technical Specification for Safety of Temporary Electricity Consumption on the Construction Site.

2) The power distribution system on the construction site adopts leakage protector for classified protection.

3) Conductors are insulated copper wires, which are erected on special poles. Wall-penetrating conductors are protected by sleeves.

4) The distribution box is made of iron, the box is electrically protected, the door is locked, and the installation device is suitable and firm.

5), it is forbidden to use other metals instead of fuses.

6) Use 36v safe voltage for lighting and hand-held lamps in damp places.

7), all electrical equipment in accordance with the provisions, completes the protection by zero or protective grounding, at the same time, install leakage protector at the head end of the load.

5.7 Safety protection of mechanical equipment

1), all kinds of mechanical equipment should be used correctly according to their technical performance requirements, and mechanical equipment lacking safety devices or whose safety devices have failed shall not be used.

2), it is forbidden to remove the safety device on mechanical equipment, its debugging and troubleshooting shall be the responsibility of the mechanic.

3), timely maintenance of machinery and equipment, it is strictly prohibited to the operation of machinery and equipment for maintenance, debugging, etc.

4), mechanical operation, the operator can't leave without authorization or machinery to mechanical operators, it is forbidden to work after drinking.

5), the operator has the right to refuse to carry out the command in violation of safety operation procedures.

Three, civilized construction, environmental protection organization measures

1, site civilized construction planning.

1), combined with the site layout, the site area is reasonable, which can not only meet the needs of engineering construction, but also facilitate management and transportation, and the functional areas between production and life are clear.

2) According to the Company's Management Regulations on Civilized Construction on the Construction Site, the publicity slogans on civilized construction, safety and quality on the construction site are unified, and the font and color are unified, which fully reflects the main color of the company's "scarlet letter on white background".

3) According to the Company's Management Regulations on Civilized Construction on the Construction Site, the detachable gate on the site is designed and manufactured. In addition to writing two couplets on both sides of the gate in red letters and white background according to the specific situation, the head of the gate is also marked with eye-catching signs.

4) Brush the fence on the construction site, gray frame on white background, and write the propaganda slogan in scarlet letter.

5) Choose an eye-catching position at the entrance of the construction site, design and make advertising walls, arrange and hang construction signs, draw posters with architectural characteristics, and have a bird's eye view.

6) Reasonably plan the temporary buildings, roads and water pipes in the site to ensure that there is no water in the site during the construction period, and the production garbage and domestic garbage pool will be built on site as planned, so as to separate the two types of garbage, and ensure the cleanliness of the construction area.

7) According to the requirements of civilized construction and ISO9002 quality standard, the materials used in site construction should be planned in residential areas, separated by masonry or warning railings, neatly placed and clearly marked.

8) The staff canteen should be spacious and bright, and the entrance should be provided with a smoke outlet (ventilator) and a screen door. All windows should have screens, cold storage facilities, and raw and cooked separately. Tables, dados and chopping boards in the kitchen should be covered with magnetic disks, and no one can live in the kitchen. At the same time, it is required to ensure that there are no flies and no mouse holes.

9) Build a toilet with a squatting position of not less than 19 within a certain range from the construction site to the dormitory (not less than 10m from the canteen). There are all 15 squatting positions in the men's toilet, urinals not less than 10m, and all 5 squatting positions in the women's toilet. The toilet dado, partition wall, urinal and urinal should be affixed with magnetic sheets, and the toilet should be well ventilated and well lit. Designate a special person to carry out sanitary management on the toilet to ensure that there is no water in the toilet, no flies in summer, and the feces are cleaned in time.

10), the staff dormitory is managed by a special person to ensure the dormitory, clothes, quilts, etc. Neatly stacked, no littering, neat dormitory, no mosquitoes and flies.

1 1), set up various post responsibility systems in the on-site office and conference room, and arrange the construction network diagram, construction plan, distribution diagram of civilized construction responsibility area, engineering organization guarantee system, quality guarantee system, safety guarantee system, civilized construction guarantee system, daily actual workload completion progress, construction water and power outage record form, engineering construction meteorological barometer and charts of safety management committee, fire protection committee and family planning committee.

12), all construction personnel must hold relevant certificates and wear color-separated safety helmets. The project manager wears a red helmet and a red badge; Main management personnel and quality assurance personnel wear yellow safety helmets and yellow badges; The general manager should wear a blue helmet and a blue badge; Labor teams wear white helmets and badges, wear helmets at work, and wear badges when they go in and out.

13), all kinds of machines and tools are hung with signs of operation procedures, and mortar machines and concrete mixers are also hung with mix proportion cards. All kinds of raw materials must be measured before mixing, and all protective railings used for safety are equipped with safety warning poles marked with a 40cm long yellow and black sign (painted with paint).

14), according to the security measures to protect the site that needs to be protected, at least one safe passage is set on the construction site, and a safety net is set on the passage. Use bamboo basketry for protection, hang various safety warning signs at the entrance and exit, and take preventive measures when entering the construction site. Safe driving routes should be set on the construction operation surface and indicated with signs.

2. Establish and improve the civilized construction management system.

1), civilized construction planning and implementation plan;

2), civilized construction site management system;

3), civilized canteen, dormitory, toilet management system;

4), civilized construction responsibility table;

5), civilized construction rewards and punishment system.

3. Noise control measures to reduce nuisance to people

Once the noise generated by the construction of this project is too large, it will inevitably affect the lives of nearby residents. Therefore, how to minimize noise and prevent noise pollution in the construction process has become a major topic of this project.

After full research and demonstration, it seems that the following measures have been taken to prevent noise from disturbing the people.

3. 1 organization and management

1), set up a silent construction leading group headed by the project manager, giving priority to prevention and comprehensive management.

2) Establish a regular public opinion survey system, closely cooperate with nearby neighborhood committees in the construction process, and carry out special treatment through the feedback information from neighborhood committees.

3) Organize the construction production reasonably, and arrange the construction work with inevitable high noise during the construction in daytime, mainly from 10: 00 at night to 6: 00 the next morning.

3.2 Environmental protection technical measures to prevent noise and pollution

By adopting new technologies, new processes and new methods, the traditional and backward construction methods are changed and the noise is reduced. The noise in daily construction mainly comes from formwork removal, vibrating concrete and mechanical equipment.

1), a new formwork technology is adopted to reduce noise. The traditional small steel formwork construction is knocking, which is noisy. In this project, our company will adopt the following formwork construction technology, which can greatly reduce the construction noise.

2), the external wall adopts bamboo glue template.

3) The platform formwork adopts the big bamboo formwork, which eliminates the construction noise of the traditional small steel formwork.

4) Beam-slab formwork support system adopts rapid support technology, which simplifies the supporting process of traditional steel pipes and reduces the consumption of traditional steel pipes, thus reducing the noise during formwork support.

5) Take sound insulation and noise elimination measures to reduce mechanical noise pollution.

3.3 Concrete pouring

1), reducing the use frequency of noisy vibrators and improving the use efficiency. The floor adopts a silent flat vibrator.

2) Due to the large amount of concrete in the underground part, continuous construction is needed. However, the concrete pouring of this project is completed in three times (bottom plate, negative second floor and negative first floor). For the project quality, measures should be taken to improve the safety of personnel during continuous construction, and the continuous construction time should be clearly defined. Ask the residents to understand.

3.4 Environmental protection measures

1), material transportation: all materials are unloaded in time after being transported to the construction site, and stacked at the designated place, and the transportation vehicles leave the site as soon as possible.

2) Toilet: flush type, managed by special personnel.

3) Organize professional health contracting teams and construction teams to be responsible for the health responsibility area, supervise and clean up, and remove sundries. Sprinkle water on the ground to prevent dust in summer.

4) Canteen: The on-site canteen should meet the management requirements of the food hygiene department, so as to be free from mosquitoes, flies, rats and food pollution, so that employees can eat well and healthily.

5), the construction site to set up a domestic waste pool and construction waste pool, regular disinfection of the construction site.

6) Domestic garbage is only piled up in the field for a short time and contracted by a special garbage truck. It should be removed every day to keep the site clean.

7) Disposal of construction waste: The on-site construction waste should be cleaned up in different areas, piled up centrally, managed by special personnel and treated uniformly.

8), often listen to the opinions of the surrounding residents, find the shortcomings in time.