Urban sewage implementation of decentralized treatment and centralized treatment principle. Article V municipal engineering administration is the city's municipal drainage administrative department.
City municipal engineering administrative department of the municipal drainage management department is responsible for the management of municipal urban drainage system; district and county drainage management department is responsible for the district and county urban drainage system management. Article 6 The city encourages scientific research on urban drainage, the introduction and promotion of advanced technology, the use of new technologies, new materials, to improve the modernization of urban drainage. Article 7 The city encourages the reuse of urban wastewater after treatment. Article 8 Any unit or individual has the obligation to protect urban drainage facilities, and has the right to stop and report violations of these regulations.
The units and individuals who have made outstanding contributions to the work of urban drainage shall be recognized and rewarded. Article 9 urban drainage facilities refers to the drainage network, pumping stations, sewage treatment plants, sludge final disposal facilities and other related facilities, as well as by the drainage management department management of the drainage river, pits and ponds.
Urban drainage facilities are divided into public **** drainage facilities and self-built drainage facilities. Public **** drainage facilities refers to urban drainage facilities managed by the drainage management department. Self-built drainage facilities refers to the property rights unit to invest in the construction and management of drainage facilities. Chapter II planning and construction of Article 10 municipal engineering administrative department in conjunction with the municipal urban planning administrative department in accordance with the city's urban master plan and the national economy and social development plan, the preparation of the city's urban drainage planning, reported to the municipal people's government for approval and implementation.
The municipal engineering administrative department is responsible for the organization and implementation of urban drainage planning and supervision and management. Article XI preparation of urban drainage planning and construction of urban drainage facilities, shall follow the principle of sewage, rainwater diversion.
The original urban drainage facilities should be in accordance with the requirements of urban drainage planning, and gradually sewage, rainwater diversion transformation. Article XII of urban planning and construction, should be reserved and control of pumping stations, sewage treatment plants, maintenance shift points, sludge transfer stations, sludge disposal plants and other urban drainage facilities planning land. Article XIII without the consent of the municipal municipal engineering administrative department and the municipal urban planning administrative department, shall not change the drainage river, pit and pond drainage and safe flood crossing function. Article XIV need to build urban drainage facilities, the construction unit shall go to the drainage management department for drainage outlet procedures before commissioning the design. After the design of the drainage project construction plans shall be reviewed and agreed by the drainage management department before implementation. Article XV of the urban drainage facilities to undertake engineering design and construction of units, should have the appropriate design and construction of the state qualification, strict implementation of the state and the city's relevant norms, regulations and standards. Article XVI of the new construction, alteration and expansion projects, the construction unit shall be in accordance with the requirements of urban drainage planning, construction of drainage facilities at the same time. Need to build industrial wastewater treatment facilities, should be designed at the same time as the main project, the same time construction, commissioning and use. Article XVII of the new drainage pipe connected to urban drainage facilities, the construction unit shall carry the relevant information to the drainage management department for approval. Without approval shall not be connected to urban drainage facilities.
Units and individual businesses (hereinafter collectively referred to as drainage households) of the drainage pipe connected to urban drainage facilities, should be set up to lie mud wells; catering outlets should be set up grease traps; toilets should be set up septic wells. Article 18 The construction of urban drainage facilities, shall be subject to the supervision of the city municipal engineering quality supervision organization.
Included in the public **** drainage facilities management scope of the drainage project is completed, the construction unit shall be to the drainage management department for acceptance and handover procedures. Acceptance of qualified, by the drainage management department to be received; acceptance of unqualified, shall not be used, the construction unit shall be responsible for repair or reconstruction.
Has not been transferred to the drainage management department management of urban drainage facilities, the construction unit is responsible for the maintenance and management. Article 19 of the public **** drainage facilities construction funds, the use of government investment, the beneficiaries of funding and other ways to raise. Chapter III of the water quality and quantity management Article 20 of the drainage households to the urban drainage facilities discharge of sewage, shall comply with national and municipal provisions of the sewage discharged into the urban drainage facilities of water quality standards. Excessive heavy metals, difficult to biodegrade and toxic and harmful substances in the sewage shall be treated. Article 21 The city on the discharge of industrial wastewater discharge of drainage households to implement the drainage permit system. Article 22 The discharge of industrial wastewater discharge of water shall be submitted to the drainage management department to submit an application for a drainage permit, and submit the following information:
(a) the unit layout plan;
(b) the type of production products, the main raw materials and the amount of water consumption;
(c) sewage outlet location, caliber and drainage of water quality, water, water temperature, water pressure;
(D) sewage treatment process;
(E) new construction, alteration, expansion projects and drainage related to the expansion of the initial design documents;
(F) related to other drawings and information.