2, merchants shall not be any reason to change their stores within the fire lines, facilities, equipment and equipment (smoke, temperature, sprinkler, etc.), no one shall not move without authorization to fiddle with, such as damage to compensate for the loss of penalties (according to Article 63 of the Fire Services Act, the penalty is a fine of more than 500 yuan, and the circumstances of the serious case to the fire brigade sentenced to 5 days of detention).
Note: Decoration shall not be unauthorized spray, smoke and other systems blocked, spray around the distance of 0.6m, need to reach the effective protection radius, lighting set outside the effective protection radius, the sprinkler system shall not be hung on any decorations, spray paint should be sprayed to protect the head and smoke before construction.
3, anti-smoke channel, keep it open, do not arbitrarily blocked.
4, store decoration partition wall, not through the top; if you need to through the top, to be in the partition at the top of every 1M open 500 * 300 smoke vent. (Applicable to gypsum board roof)
5, business merchant shelves must be painted three times with fireproof paint (recommended the use of iron shelves), the height of the goods stacked shall not be too high, the standard is at least 0.5m from the top.
6, business merchant decoration materials, all the wood structure shall be fireproof treatment, brush fireproof paint thickness shall be up to 2mm or three times
7, the business merchant decoration, as well as the rise of the The power line used in the plaster partition wall must be approved by the security department of the mall and need to set metal pipe.
8. If there is a roller shutter in the shop, it is not allowed to pile up any articles under the roller shutter and decorate the roller shutter.
9, light box box: according to the rules of all wooden structures must be fireproof treatment, brush the thickness of fireproof paint must be up to 2mm or three times; fixed-size production, must be set up to open the door, easy to maintain, must be set up to heat sinks.
10, the construction team to enter the construction site needs to be the first construction site within the horn, smoke, temperature sensors, sprinkler heads, etc. to do dust treatment.