A construction unit, a construction unit or a construction waste transport unit applying for a permit for urban construction waste disposal shall meet the following conditions: (1) Submit a written application (including the time, route and name of the disposal site for construction waste transportation, the contract signed between the construction unit and the transport unit, and the land use certificate for the construction waste disposal site); (2) It has a plan and road map of the disposal site, corresponding mechanical equipment such as paving, rolling, dust removal and lighting, drainage and fire fighting facilities, a sound environmental sanitation and safety management system and effective implementation; (3) A scheme for classified disposal of construction waste and a scheme for recycling waste concrete, metal and wood; (4) Having a legal road transport business license and vehicle driving license; (5) Having a sound transport vehicle operation, safety, quality, maintenance and administrative management system and effectively implementing it; (6) Transport vehicles shall be equipped with a fully enclosed transport mechanism or a closed covering device, a traveling and loading and unloading recorder and corresponding construction waste sorting and transportation equipment.
Second, the handling of materials
1. Legal person: business license and legal person ID card. 2. Natural person: ID card. 3. Agent's ID card (not the original power of attorney required by the applicant). 4. Check the original and receive the copy.
1.4 field photos (showing the whole picture from multiple angles) need to be printed in color; 2. Site plan, original and photocopy.
Including site safety, eco-environmental, economic rationality and feasibility demonstration report, landfill scheme design, site closure design, etc.
The certification materials shall meet the requirements of official documents.
3. Taking photos on site: The entrance and exit of the receiving yard should be paved with a hard-bottomed channel with a length of 20 ~ 30m and a width of 3 ~ 6m, equipped with a car washing tank, high-pressure washing equipment and a sedimentation tank, and monitored by video, which can be used effectively (printed on colored paper).
Photos of equipment and facilities (color paper version required)
Third, the handling process
Online processing flow
1. The applicant logs in the online service hall of Guangdong Province, Huizhou Huiyang Branch to apply and upload electronic materials.
2. accept. Receiving and accepting personnel will pre-examine the materials, put forward pre-examination opinions within 1 working days, and make an acceptance decision. If the applicant meets the application qualification, and the materials are complete, the format is standardized, and the legal form is met, it shall be pre-accepted and an electronic pre-acceptance receipt shall be issued; If the applicant does not meet the application qualification or the materials are incomplete and do not meet the statutory form, the connector acceptance personnel will not accept it and issue a notice of rejection. After the pre-acceptance, the applicant shall submit the paper materials to the city appearance and environmental sanitation supervision brigade of Huiyang District Environmental Sanitation Bureau in the agreed way, and the acceptance personnel will formally accept the online electronic materials after checking them on site.
3. review. After acceptance, the examiner will review the materials and make a review decision within 5 working days. Meet the examination and approval conditions, issued the "Huiyang District Urban Construction Waste Acceptance Permit"; If it is not approved, a "decision of disapproval" shall be issued. In the process of review, if it is found that the application materials need to be supplemented, the applicant shall be required to make corrections within 2 working days, and a Notice of Supplementary Application Materials shall be issued. The applicant will be re-examined after making corrections as required.
4. Get the results. The applicant shall, according to the agreed way, go to the city appearance and environmental sanitation supervision brigade of Huiyang District Environmental Sanitation Bureau to receive the processing results and sign a letter of responsibility.
See attached figure 2 for the online processing flow of this matter.
Window processing flow
1. The applicant applies to the city appearance and environmental sanitation supervision brigade of Huiyang District Environmental Sanitation Bureau and submits the application materials.
2. accept. The recipient verifies the application materials and makes an acceptance decision on the spot. If the applicant meets the application qualification, and the materials are complete, the format is standardized and the legal form is met, it shall be accepted; If the applicant does not meet the application qualification or the materials are incomplete and do not meet the statutory form, the connector acceptance personnel will not accept it and issue a notice of rejection. If the applicant's materials do not meet the requirements but can be corrected on the spot, they will be accepted after being returned to correct on the spot.
3. review. After acceptance, the examiner will review the materials and make a review decision within 5 working days. Those who meet the examination and approval conditions,
Issuing the acceptance permit of urban construction waste in Huiyang District; If it is not approved, a "decision of disapproval" shall be issued. In the process of review, if it is found that the application materials need to be supplemented, the applicant shall be required to make corrections within 2 working days, and a Notice of Supplementary Application Materials shall be issued. The applicant will be re-examined after making corrections as required.
4. Get the results. The applicant shall, according to the agreed way, go to the city appearance and environmental sanitation supervision brigade of Huiyang District Environmental Sanitation Bureau to receive the processing results and sign a letter of responsibility.
See attached figure 1 for the window handling flow of this matter.
Special link
not have
Fourth, the handling place
No.0/4, Danshui Shiyuan East Street, Huiyang District
Verb (abbreviation of verb) processing time limit
5 (working days)
Intransitive verb processing mechanism
Huiyang district appearance of the city environment health management bureau
Seven. service charge
be free of charge
Eight. the basis of law
Regulations on Urban Construction Waste Management (2005)
Seventh units that dispose of construction waste shall apply to the competent department of city appearance and environmental sanitation of the people's government of the city and obtain the permit for the disposal of urban construction waste before they can dispose of it. The competent department of city appearance and environmental sanitation of the city people's government shall make a decision on whether to approve or not within 20 days after receiving the application. If approved, an approval document shall be issued; If it is not approved, it shall inform the applicant and explain the reasons. The specific conditions for the examination and approval of urban construction waste disposal shall be implemented in accordance with the provisions of the Ministry of Construction on the conditions for the inclusion of fifteen administrative licenses decided by the State Council.
Provisions of the Ministry of Construction on the Setting Conditions of Item 15 Administrative License Decided by the State Council (2004)
Article 4 Conditions for Examination and Approval of Urban Construction Waste Disposal When applying for examination and approval of urban construction waste disposal, the construction unit, construction unit or construction waste transportation unit shall meet the following conditions: (1) Submit a written application (including the time and route of construction waste transportation, the name of the disposal site, the contract signed between the construction unit and the transportation unit, and the land use certificate of the construction waste disposal site); (2) It has a plan and road map of the disposal site, corresponding mechanical equipment such as paving, rolling, dust removal and lighting, drainage and fire fighting facilities, a sound environmental sanitation and safety management system and effective implementation; (3) A scheme for classified disposal of construction waste and a scheme for recycling waste concrete, metal and wood; (4) Having a legal road transport business license and vehicle driving license; (5) Having a sound transport vehicle operation, safety, quality, maintenance and administrative management system and effectively implementing it; (6) Transport vehicles shall be equipped with a fully enclosed transport mechanism or a closed covering device, a traveling and loading and unloading recorder and corresponding classified transport equipment for construction waste.
Decision of the State Council Municipal Government on Setting Administrative License for Administrative Examination and Approval Items that Need to Be Retained (2004)
In accordance with the "People's Republic of China (PRC) Administrative Licensing Law" and the relevant provisions of the reform of the administrative examination and approval system, the State Council has comprehensively cleaned up the administrative examination and approval items of its subordinate departments. The administrative licensing items set by laws and administrative regulations shall continue to be implemented according to law; For the administrative examination and approval items that are set in normative documents other than laws and administrative regulations, but really need to be retained and conform to the matters specified in Article 12 of the Administrative Licensing Law of People's Republic of China (PRC), according to the provisions of the second paragraph of Article 14 of the Administrative Licensing Law of People's Republic of China (PRC), it is decided to retain them and set up 500 administrative licenses. In order to ensure the legal, open, fair and just implementation of the administrative license set in this decision, the relevant departments of the State Council shall make specific provisions on the implementation conditions of various administrative licenses listed in this decision, and make them public. The procedures and time limit for the implementation of administrative licensing shall be implemented in accordance with the relevant provisions of the Administrative Licensing Law of People's Republic of China (PRC).